PlanWatch Demand Radar · for roofing contractors

Roofing leads, straight off the planning register.

Re-roofs, dormers and extension roofs — listed on the public register before anyone rings a roofer. Re-roof applications ARE the roofing job. Loft conversions scaffold the roofline within weeks of consent. Extensions need a roof 2–5 months in. All of it is in the register, dated.

14,530 matching applications hit the UK register in the last 30 days, from the 376 council registers we read daily — filtered down to just the councils or postcode areas you cover.

See what’s in your patch

Enter a full postcode to search a 5 km business radius, or name the councils or postcode districts you cover. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

Last 90 days

Where the work is

Applications matching our rules for roofing contractors in our busiest councils, filed in the 90 days to 20 Nov 2026. Open a council for its numbers.

  1. Buckinghamshire663
  2. Enfield589
  3. Cornwall558
  4. Leeds518
  5. Barnet456
  6. Birmingham436
  7. Redbridge411
  8. Bromley371
Why the register

Why the register beats every other lead source

  1. Storm-chasing weeks feast, consent-driven work is steadier.

  2. Heritage re-roofs (listed building consents) are high-margin and publicly listed.

  3. Extension roofs get handed to whoever the builder knows — unless the homeowner already has your letter.

A re-roof runs £6,000–£20,000; dormer structures more. Every consented one in your patch, every month.

The matching table

Exactly what we match for roofing contractors

This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.

TriggerExample from the registerDemand windowConfidenceWhy it matters to you
Loft conversion / dormer Loft conversion with rear dormer and 3 no. rooflights now – 3 months high dormer/roof structure is the first trade in a loft job
Re-roof / roof replacement Listed building consent to re-roof with natural slate now – 2 months high the application IS the roofing job
Rooflights / skylights Single storey rear extension with 2no. rooflights now – 3 months low rooflights cut into the roof plane — often fitted by roofers, unconfirmed
Solar PV installation Installation of roof mounted solar PV panels to south elevation now – 2 months low panel installs surface roof-condition problems — unconfirmed
Two-storey / first-floor extension Two storey side extension and single storey rear extension 3 – 5 months high new roof over the extension follows the shell
Single-storey extension Householder Planning Application - Single storey rear and side extension 2 – 4 months high flat/pitched roof follows the shell
New dwelling(s) / self-build Planning Application for the erection of a two storey dwelling with garage 4 – 9 months medium roof follows shell on a longer programme
Outbuilding / annexe / detached garage Householder Planning Application - Detached garage. 1 – 4 months medium small roof follows quickly
Extension (storeys unspecified) Proposed rear extension and internal alterations 2 – 5 months medium roof over extension, scale unknown
Listed building: roof / chimney / leadwork repair Listed Building application for partial take down of brick chimney stack to rear; associated repair works to existing roofing now – 3 months medium heritage roof repairs need a roofer, though a share go to specialist heritage contractors, hence medium
Change of use to residential / HMO Change of use from office (Class E) to 4 no. residential flats 3 – 9 months low roof work possible but unconfirmed
Renovation / alterations (catch-all) Refurbishment and alterations to existing dwelling 1 – 6 months low roof work possible — unconfirmed

Re-roofs are actionable immediately; loft and extension roofs land 0–5 months after consent. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →

How it works

  1. 1. Pick your patch

    The councils or postcode prefixes you cover — a town, a county, or several.

  2. 2. We scan the register

    Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.

  3. 3. You get a mailing list

    A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.

Off the register

Recent applications for roofing contractors, address hidden.

As filed with the council, newest first. Subscribers get the full site address, the planning reference and the reason it matched, for every one.

FiledCouncilThe work, as filedWhy it matched
20 Nov 2026 Buckinghamshire HP12 Notification under The Town and Country Planning (General Permitted Development) Order 2015, Part 1 of Schedule 2 Class A for: single storey rear extension (depth… Single-storey extensionwork due 2 to 4 months from the decision
20 Nov 2026 Barnet N20 Alterations to roof involving increase in volume to existing rear dormers and installation of a roof lantern Loft conversion / dormerwork due now to 3 months from the decision
20 Nov 2026 Redbridge IG8 Installation of 6no. solar panels on flat roof of rear extenion and 9no solar panels on flat roof of rear dormer. (Summary). Loft conversion / dormerwork due now to 3 months from the decision
20 Nov 2026 Bromley BR1 Single storey rear extension. Single-storey extensionwork due 2 to 4 months from the decision
20 Nov 2026 Bradford BD15 Single storey side and rear extension , garage conversion. hip to gable conversion, raise in ridge height and dormer windows to front and rear Loft conversion / dormerwork due now to 3 months from the decision
20 Nov 2026 Northumberland TD15 Single storey extension to north of existing kitchen. Slated pitched roof and rendered walls to match existing. New opening / window to sitting room. New double doors to… Single-storey extensionwork due 2 to 4 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

The rules (non-negotiable)

Postal outreach only. Mail only — no email, no SMS, no cold calls. Each letter should cite the planning reference and carry an opt-out address. The data is from the public planning register; we store no applicant names and address letters to "The Owner/Occupier".

Demand Radar packages

Who’s posting your cards?

Both packages include your dashboard and a fresh monthly list of homes in your patch.

Demand Radar Dashboard

£149 / month

You handle the mailing. Download your address list and send it to your printer, or post your own letters.

Choose dashboard

Demand Radar Done for You

£215 / month

We design your card. Once you approve the proof, we print and post up to 50 cards a month to matching homes in your patch.

Request card distribution
Price

Set up your dashboard

Exclusive cover available: one roofing work subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.

£149/month · roofing contractors · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Can you design and post the cards for me?

Yes. Demand Radar Done for You costs £215 a month, including the £149 dashboard. Give us your branding and contact details and we design a card for you to approve. Printing and UK postage are included for up to 50 matching homes a month. If fewer homes qualify, we send fewer cards. We check your patch and agree the first mailing with you before taking payment.

Demand Radar or the Business plan — which one do I need?

Demand Radar Dashboard and Business both cost £149 a month. Demand Radar Dashboard supplies an addressed mailing list every month for one trade in your patch, with exclusive cover: it is for firms that write to homes. The Business plan is alerts, keyword rules, a dashboard and an API across any councils you name, with no addresses: it is for firms that want to know within hours of something reaching the register and contact people their own way. If you want letters through doors, Radar. If you want a feed, Business.

Where does the data come from?

Published planning applications from the UK planning register — planning.data.gov.uk plus direct council sources, covering 378 local authorities. That register is public information. What you pay for is the trade-trigger matching, the demand-window timing, the deduplication and the suppression, not the raw fact of the applications.

How far back does the first list go?

There is no fixed cut-off date. We look back across the register and keep only the applications whose buying window for your trade is still upcoming, open or closing. In practice that means most of a first list is the last six months of live projects, plus a tail of larger builds from further back that are only now reaching your stage. Anything finished or already past its window is dropped, and each household appears once and is never sent to you twice — as is anything refused or withdrawn, unless your trade is architects and planning consultants, where a stalled application is the whole point. Whether that first list comes out bigger or smaller than the 90-day figure on the patch checker depends on how long your trade's buying window is, and it goes both ways. A long-window trade — glazing, kitchens, flooring — gets a much bigger first list, because consents from six or twelve months back are only now reaching its stage. A fast-window trade like skip hire or demolition gets a smaller one, because a nought-to-three-month window has already closed on a good share of what the checker counted. Either way later months are smaller than the first: they carry new applications only.

Why postal outreach only? Can I get phone numbers?

No, and that is deliberate. The register is published for planning transparency, not to build a calling list. We store no applicant names, so there is nothing to phone: letters are addressed to "The Owner/Occupier" at the property. Mail only — no email, no SMS, no cold calls — and every letter should cite the planning reference and carry an opt-out address. Firms that want a dialler list are not a fit for this product.

How many other PlanWatch letters will the same household get?

One planning application can be work for several trades, so we limit how many of our subscribers can post the same household in the same month. A shared-cover subscriber may see a few addresses held back until the next month, and the dashboard and batch email say how many. Exclusive cover is never held back by that limit: an exclusive subscriber always gets every address in their patch.

How does exclusivity work?

One subscriber per trade, per patch. The check runs before you pay: if another firm in your trade already holds those councils or postcode areas, we tell you at signup and take no money. Exclusivity is scoped to your trade only — a roofer and a window company can both hold the same town without clashing.

Can I cancel?

Yes. Billing is monthly and you can cancel at any time; cover runs to the end of the month you have paid for, then the patch is released for someone else. There is no minimum term and no contract to exit.

What happens if I sign up today for the dashboard?

You go straight to secure checkout, and your first list is generated within 24 hours of activation rather than a month later. That first list is not a snapshot of the last few weeks: it carries every live application in your patch whose buying window for your trade is still upcoming, open or closing, which in practice is most of the last six months plus some larger builds from further back that are only now reaching your stage. Finished jobs are dropped and each address appears once. Refused and withdrawn applications are dropped too for every building trade — with one deliberate exception: on the architects and planning consultants list they ARE the list, because a refusal is the moment a household discovers it needs drawings. After that a fresh list arrives every month covering new applications only, so it will be smaller than the first. If your patch turns out to be thinner than you expected in that first month, tell us and we will sort it out.

By council

Roofing leads by council, and every other trade.

Other trades we cover

Read firstHow roofers find work in planning applicationsIs it legal to write to homeowners about planning applications?

How to actually work these leads

A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →

PlanWatch Demand Radar · leads sourced from the public UK planning register · postal outreach only. All trades · The guide