PlanWatch Demand Radar · for bricklayers & building contractors

Builder leads, straight off the planning register.

Approved extensions in your patch — before the homeowner has a builder. Footings and shell are the first trades on any extension. The consent date tells you exactly when that phone call is coming; the letter puts your name in the house before it does.

14,393 matching applications hit the UK register in the last 30 days, from the 376 council registers we read daily — filtered down to just the councils or postcode areas you cover.

See what’s in your patch

Enter a full postcode to search a 5 km business radius, or name the councils or postcode districts you cover. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

Last 90 days

Where the work is

Applications matching our rules for bricklayers & building contractors in our busiest councils, filed in the 90 days to 20 Nov 2026. Open a council for its numbers.

  1. Buckinghamshire678
  2. Cornwall549
  3. Enfield539
  4. Barnet539
  5. Leeds472
  6. Birmingham429
  7. Bromley342
  8. Bradford321
Why the register

Why the register beats every other lead source

  1. Word-of-mouth is great until the pipeline goes quiet.

  2. Lead portals resell the same job to every builder in the postcode.

  3. You cannot see which streets have live consents — we can.

Extension shells run £15,000–£60,000. The register lists every consented one in your area, with timing.

The matching table

Exactly what we match for bricklayers & building contractors

This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.

TriggerExample from the registerDemand windowConfidenceWhy it matters to you
Kitchen extension / open-plan kitchen Single storey rear extension to form open plan kitchen diner now – 3 months high kitchen extensions start with footings and shell
Two-storey / first-floor extension Two storey side extension and single storey rear extension now – 4 months high footings and two-storey shell start on consent
Single-storey extension Householder Planning Application - Single storey rear and side extension now – 3 months high footings and shell are the first trades on site
Garage conversion Garage conversion to habitable accommodation now – 3 months medium infill wall below the new window
Conservatory / orangery / porch / garden room Erection of a conservatory to rear now – 2 months medium dwarf walls and base come first
New dwelling(s) / self-build Planning Application for the erection of a two storey dwelling with garage 2 – 8 months medium new-build programmes run longer; shell after groundworks
Outbuilding / annexe / detached garage Householder Planning Application - Detached garage. now – 4 months medium masonry outbuildings start with the shell (timber ones do not — hence medium)
Open-plan / knock-through kitchen (no extension named) Internal alterations to form open plan kitchen and living space now – 3 months medium a knock-through is a structural opening with a beam — smaller than a shell, hence medium
Extension (storeys unspecified) Proposed rear extension and internal alterations now – 4 months medium extension confirmed but scale unknown
Listed building: render / repointing / stonework repair Listed Building Consent - South wall - current cement render will be removed and replaced with a traditional lime render now – 3 months medium repointing and masonry repair is lime-mortar brick and stone work
Change of use to residential / HMO Change of use from office (Class E) to 4 no. residential flats 3 – 9 months low structural alterations likely but unquantified
Renovation / alterations (catch-all) Refurbishment and alterations to existing dwelling 1 – 6 months low openings/structural work possible — unconfirmed

Single-storey shells start 0–3 months after consent; two-storey 0–4. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →

How it works

  1. 1. Pick your patch

    The councils or postcode prefixes you cover — a town, a county, or several.

  2. 2. We scan the register

    Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.

  3. 3. You get a mailing list

    A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.

Off the register

Recent applications for bricklayers & building contractors, address hidden.

As filed with the council, newest first. Subscribers get the full site address, the planning reference and the reason it matched, for every one.

FiledCouncilThe work, as filedWhy it matched
20 Nov 2026 Buckinghamshire HP12 Notification under The Town and Country Planning (General Permitted Development) Order 2015, Part 1 of Schedule 2 Class A for: single storey rear extension (depth… Single-storey extensionwork due now to 3 months from the decision
20 Nov 2026 Barnet EN5 Alterations to the existing single-storey rear extension, comprising new render, a raised parapet coping and revised openings with sliding doors and a new fixed glass… Single-storey extensionwork due now to 3 months from the decision
20 Nov 2026 Bromley BR1 Single storey rear extension. Single-storey extensionwork due now to 3 months from the decision
20 Nov 2026 Bradford BD15 Single storey side and rear extension , garage conversion. hip to gable conversion, raise in ridge height and dormer windows to front and rear Single-storey extensionwork due now to 3 months from the decision
20 Nov 2026 East Hertfordshire SG14 Prior approval application (Part 1, Class A) for construction of single storey rear extension; depth extending from the original rear wall by 7.00 metres, a maximum… Single-storey extensionwork due now to 3 months from the decision
20 Nov 2026 Cotswold GL7 Erection of single storey flat roofed extension to rear and first floor side extension over garage with associated works Single-storey extensionwork due now to 3 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

The rules (non-negotiable)

Postal outreach only. Mail only — no email, no SMS, no cold calls. Each letter should cite the planning reference and carry an opt-out address. The data is from the public planning register; we store no applicant names and address letters to "The Owner/Occupier".

Demand Radar packages

Who’s posting your cards?

Both packages include your dashboard and a fresh monthly list of homes in your patch.

Demand Radar Dashboard

£149 / month

You handle the mailing. Download your address list and send it to your printer, or post your own letters.

Choose dashboard

Demand Radar Done for You

£215 / month

We design your card. Once you approve the proof, we print and post up to 50 cards a month to matching homes in your patch.

Request card distribution
Price

Set up your dashboard

Exclusive cover available: one brickwork and building work subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.

£149/month · bricklayers & building contractors · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Can you design and post the cards for me?

Yes. Demand Radar Done for You costs £215 a month, including the £149 dashboard. Give us your branding and contact details and we design a card for you to approve. Printing and UK postage are included for up to 50 matching homes a month. If fewer homes qualify, we send fewer cards. We check your patch and agree the first mailing with you before taking payment.

Demand Radar or the Business plan — which one do I need?

Demand Radar Dashboard and Business both cost £149 a month. Demand Radar Dashboard supplies an addressed mailing list every month for one trade in your patch, with exclusive cover: it is for firms that write to homes. The Business plan is alerts, keyword rules, a dashboard and an API across any councils you name, with no addresses: it is for firms that want to know within hours of something reaching the register and contact people their own way. If you want letters through doors, Radar. If you want a feed, Business.

Where does the data come from?

Published planning applications from the UK planning register — planning.data.gov.uk plus direct council sources, covering 378 local authorities. That register is public information. What you pay for is the trade-trigger matching, the demand-window timing, the deduplication and the suppression, not the raw fact of the applications.

How far back does the first list go?

There is no fixed cut-off date. We look back across the register and keep only the applications whose buying window for your trade is still upcoming, open or closing. In practice that means most of a first list is the last six months of live projects, plus a tail of larger builds from further back that are only now reaching your stage. Anything finished or already past its window is dropped, and each household appears once and is never sent to you twice — as is anything refused or withdrawn, unless your trade is architects and planning consultants, where a stalled application is the whole point. Whether that first list comes out bigger or smaller than the 90-day figure on the patch checker depends on how long your trade's buying window is, and it goes both ways. A long-window trade — glazing, kitchens, flooring — gets a much bigger first list, because consents from six or twelve months back are only now reaching its stage. A fast-window trade like skip hire or demolition gets a smaller one, because a nought-to-three-month window has already closed on a good share of what the checker counted. Either way later months are smaller than the first: they carry new applications only.

Why postal outreach only? Can I get phone numbers?

No, and that is deliberate. The register is published for planning transparency, not to build a calling list. We store no applicant names, so there is nothing to phone: letters are addressed to "The Owner/Occupier" at the property. Mail only — no email, no SMS, no cold calls — and every letter should cite the planning reference and carry an opt-out address. Firms that want a dialler list are not a fit for this product.

How many other PlanWatch letters will the same household get?

One planning application can be work for several trades, so we limit how many of our subscribers can post the same household in the same month. A shared-cover subscriber may see a few addresses held back until the next month, and the dashboard and batch email say how many. Exclusive cover is never held back by that limit: an exclusive subscriber always gets every address in their patch.

How does exclusivity work?

One subscriber per trade, per patch. The check runs before you pay: if another firm in your trade already holds those councils or postcode areas, we tell you at signup and take no money. Exclusivity is scoped to your trade only — a roofer and a window company can both hold the same town without clashing.

Can I cancel?

Yes. Billing is monthly and you can cancel at any time; cover runs to the end of the month you have paid for, then the patch is released for someone else. There is no minimum term and no contract to exit.

What happens if I sign up today for the dashboard?

You go straight to secure checkout, and your first list is generated within 24 hours of activation rather than a month later. That first list is not a snapshot of the last few weeks: it carries every live application in your patch whose buying window for your trade is still upcoming, open or closing, which in practice is most of the last six months plus some larger builds from further back that are only now reaching your stage. Finished jobs are dropped and each address appears once. Refused and withdrawn applications are dropped too for every building trade — with one deliberate exception: on the architects and planning consultants list they ARE the list, because a refusal is the moment a household discovers it needs drawings. After that a fresh list arrives every month covering new applications only, so it will be smaller than the first. If your patch turns out to be thinner than you expected in that first month, tell us and we will sort it out.

By council

Builder leads by council, and every other trade.

Other trades we cover

Read firstIs it legal to write to homeowners about planning applications?

How to actually work these leads

A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →

PlanWatch Demand Radar · leads sourced from the public UK planning register · postal outreach only. All trades · The guide