For trades · 20 min read

Is It Legal to Write to Homeowners About Planning Applications? Yes, If Your Letter Does These 6 Things

Yes, by post, if you do it right. The 6 things a UK planning-lead letter must do under UK GDPR, a notice to copy, and why calls and emails differ.

PlanWatch Team Planning data team, PlanWatch Updated · First published General information, not legal advice
Check your patch Exclusive cover per trade · Mail only
Letter · drawn for this guide
On this page 12 sections
  1. 01Why “It's on the Public Register” Is Only Half the Answer
  2. 02Letters vs Calls, Texts and Emails: Where PECR Draws the Line
  3. 03Your Legal Basis: Legitimate Interests, Not Consent
  4. 04The 6 Things Every Planning Letter Must Do
  5. 05Copy This: A “Why You Received This Letter” Notice
  6. 06Mailing Preference Service, the CAP Code and How Often to Write
  7. 07England, Wales, Scotland and Northern Ireland
  8. 08How PlanWatch Demand Radar Is Built Around These Rules
  9. 09When to Get Professional Help
  10. 10How We Counted
  11. 11Sources
  12. 12Frequently Asked Questions
Short answer

Yes. Posting a letter to “The Owner/Occupier” about a public planning application can be lawful in the UK, but only if the letter does 6 things: say who you are, say where the address came from, explain why you are writing, give a clear way to stop, honour every “stop”, and stay honest. “It's on the public register” is not a free pass: an address plus a planning reference can identify a household, so UK GDPR applies. And it has to be post. Calls, texts and emails to applicants fall under separate, stricter rules.

Plenty of lead services will tell you writing to planning applicants is “completely legal, no consent needed” and stop there. The first half is broadly right. The bit they leave out is the bit that decides whether this stays a profitable channel or turns into complaints. This guide covers all of it, in plain English, with a notice you can copy. It is general information, not legal advice.

If you want the whole playbook (timing, what to say, how to measure), read how to get leads from planning applications. This page is the legal half.

Why “It's on the Public Register” Is Only Half the Answer

Every UK council keeps a planning register by law. In England it is section 69 of the Town and Country Planning Act 1990 and article 40 of the Development Management Procedure Order 2015, which require a register of applications and decisions open to public inspection. Councils may put it online, and almost all do.

The register exists for transparency and consultation: so neighbours can see what is proposed and comment within the consultation period. It was not created as a marketing list. That does not stop you using it, but it shapes the rules.

What the register shows

A typical entry on a council portal shows:

  • the site address and the planning reference
  • a description of the work, in the council's words
  • dates (received, validated, decision) and the status
  • often the applicant's name and the agent's (architect's) name and address
  • plans, drawings and supporting documents

Anyone can search planning applications near them or check a property's planning history. The scale is big. PlanWatch's own register (377 councils, May to Sep 2026) logged 244,364 applications in five months: 48,873 a month on average. About one in five (18.9%) were classed as householder applications, the extensions, lofts and alterations most trades want.

Why UK GDPR still applies

Personal data is anything that relates to an identifiable living person, directly or indirectly. A householder application is, in practice, “this person's home and their building plans”. Even without a name, an address plus a planning reference links straight back to the applicant on the council portal. So treat the address on your list as personal data, and your letter as direct marketing under UK GDPR.

The ICO's direct marketing guidance makes the point directly: information being publicly available does not mean you are free to use it for direct marketing. You can use it. You just have to use it within the rules below.

Letters vs Calls, Texts and Emails: Where PECR Draws the Line

There are two sets of rules, and which one bites depends on the channel.

  • UK GDPR and the Data Protection Act 2018 cover the personal data, whatever the channel.
  • PECR (the Privacy and Electronic Communications Regulations 2003) adds extra rules for electronic marketing: email, texts, calls. It does not cover post.

That is the whole reason a letter is the safe channel and a phone call is not.

Channel Main rules For register-sourced prospects?
Letter to “The Owner/Occupier” UK GDPR: legitimate interests, a privacy notice, right to object. CAP Code for the copy Yes, done properly
Letter to the applicant by name As above, plus Mailing Preference Service screening under industry codes Possible, but more risk for no real gain
Marketing email PECR: prior consent from individuals (the “soft opt-in” only covers your own customers) No: you do not have consent
Text, WhatsApp, messaging PECR: same consent rule as email No
Live sales call PECR: must screen against the Telephone Preference Service and honour objections No: the register gives no phone numbers, and finding them adds risk
Recorded or automated call PECR: prior consent No
Unaddressed leaflets No personal data used. Royal Mail's door-to-door opt-out applies to its leaflet service Fine, but untargeted

Two traps catch trades out:

  1. Looking people up. Taking a name from the register and then finding a phone number, email or social profile is data matching. It adds personal data you were never meant to have and puts you squarely in PECR territory. Don't.
  2. Sole-trader agents. If you want to contact the architect or agent on an application at their published business address, remember PECR treats sole traders and some partnerships like individuals for email and text, so they need to have consented first. Marketing emails to limited companies and LLPs do not need prior consent, but they must say who you are and give a valid address for opting out, and you must stop if asked. A letter is still the cleanest route.

You do not need the homeowner's consent to send a relevant letter. You do need a lawful basis, and for postal marketing it is almost always legitimate interests (UK GDPR Article 6(1)(f)). The ICO accepts this for post, because PECR's consent rules do not apply.

What changed in 2026

The Data (Use and Access) Act 2025 added wording to Article 6 of UK GDPR saying that processing for direct marketing can be a legitimate interest. It came into force on 5 February 2026. It is a helpful signpost, not a shortcut. Direct marketing is not one of the new “recognised legitimate interests” that skip the balancing test. It is listed only as an example of processing that may be a legitimate interest, and the ICO's updated guidance still expects you to run the three-part test below and record the result. You cannot simply declare something a legitimate interest.

The three-part test

Before you mail, run the ICO's three questions and write the answers down (one page is fine; the ICO publishes a template):

  1. Purpose. Is there a legitimate interest? Telling a household that has just applied for building work about relevant local services: yes.
  2. Necessity. Do you need this data for it? An address and the planning reference are the minimum to send a letter and explain it. Names, phone numbers and documents are not needed.
  3. Balancing. Do the household's interests override yours? This is where you win or lose. The ICO asks whether people would reasonably expect their information to be used this way.

What tips the balance your way

  • Relevance. A roofer writing about a dormer is relevant. A conservatory firm writing about a tree application is not.
  • One letter, not a campaign. A single, well-timed letter has a low impact. A series of letters pushes the balance the other way.
  • No names, no extra data. “The Owner/Occupier”, the address and the reference.
  • Transparency. The letter says plainly where the address came from. A letter that cites the planning reference makes the source obvious instead of creepy.
  • An easy way out. A clear, free, immediate opt-out, honoured for good.

The case that shows where regulators push

In 2020 the ICO issued an enforcement notice against Experian over offline marketing data on millions of UK adults who had not been told. On appeal, the First-tier Tribunal (2023) and the Upper Tribunal (2024) largely sided with Experian on legitimate interests, accepting it can support offline marketing even where some people might be surprised. What survived was the duty to tell people: the First-tier Tribunal still found Experian should have sent Article 14 privacy notices to people it had not told, and it did not accept the cost of doing so as an excuse, even though it stopped short of ordering fresh notices. For trades the lesson is simple: the legal basis is rarely the problem. Failing to tell people is.

The 6 Things Every Planning Letter Must Do

This is the checklist. If your letter does all six, you are on the right side of the line.

1. Go by post, to “The Owner/Occupier”

Post keeps you outside PECR. Addressing the occupier, not a named applicant, keeps the personal data to a minimum. Quote the planning reference so the reader knows exactly why they are hearing from you.

2. Say who you are and where the address came from

Article 14 of UK GDPR applies whenever you get personal data from somewhere other than the person. You must tell them, among other things, who you are and how to contact you, your purpose and legal basis, the legitimate interest you rely on, the source of the data (including that it came from a publicly accessible source), how long you keep it, and their rights.

Timing matters. If you use the data to write to someone, you must tell them at the latest in that first letter. Separately, the ICO's guidance gives one month from obtaining the data as the outside limit, and the safe reading is that both apply. Practical upshot: put the notice on the letter, and mail a list within a month of getting it rather than sitting on it.

3. Explain why you are writing

One or two lines: what you do, why this application made you write, and that your basis is legitimate interests. Keep it human. “We noticed your planning application for a rear dormer and we fit dormers locally” does more work than a paragraph of legal wording.

4. Give a clear, separate way to stop

Article 21(4) says the right to object to direct marketing must be “explicitly brought to the attention” of the person at the latest at the first communication, and presented clearly and separately from other information. In practice: its own box or paragraph, not buried in a footer, with an email, phone number or postal address that actually works.

5. Honour every “stop”, for good

The right to object to direct marketing is absolute. Once someone objects, you must stop using their data for marketing: no argument, no reason needed, no “just one more”. Keep a do-not-mail list (address and date only) and check it before every mailing. That record is the one thing you should keep after you delete the rest of the list.

6. Keep the copy honest

Your letter is advertising, so the CAP Code applies, and consumer protection law (the Digital Markets, Competition and Consumers Act 2024) bans misleading and aggressive practices. That means:

  • No council look. No crests, no “Planning Notice” headings, no official-looking envelopes, nothing that implies the council sent it or endorses you. You read a public register; say so.
  • Obviously marketing. The reader should know at a glance it is a firm offering a service.
  • No false urgency or claims. No “your project must start by…”, no fake “approved contractor” badges, no prices you will not honour.

And keep sensitive details out

Council descriptions occasionally reveal health or family circumstances, for example adaptations for a disabled relative. Never repeat those in a letter, and never open planning documents to personalise one. The Basildon case (see “What to learn from Basildon” below) shows why.

Copy This: A “Why You Received This Letter” Notice

Here is an example notice block you can adapt. Print it on the first page, in its own bordered box, in readable type (9pt or larger). It is an example to adapt to your business, not a guaranteed-compliant form: check it against your own set-up.

Why you are getting this letter

[Your business name], [your full postal address], is writing because planning application [reference] for this address is on [council name]'s public planning register. We took the address from that register [optional: using a mailing list compiled by PlanWatch, planwatch.co.uk]. The letter is addressed to the occupier and we have not used anyone's name. We will use the address only to send this letter about [type of work].

We rely on legitimate interests: we think a letter about local [type of work] services is relevant to a household with building plans, and we have weighed that against your privacy.

You can say no. You can object to marketing at any time, free and without giving a reason. Tell us at [email] / [phone] / [postal address] and we will not write to you again.

We keep the address for [period, e.g. 30 days] and then delete it, except on our do-not-mail list if you ask us to stop. You can ask what we hold about you and have it corrected or deleted. You can complain to us, or to the Information Commissioner's Office at ico.org.uk or on 0303 123 1113.

If your list came from PlanWatch

Add two lines to the “You can say no” paragraph:

  • “Or go to planwatch.co.uk/stop-mail and enter code [Notice code]. Your address will then come off every firm's PlanWatch-sourced list, not just ours.”
  • “Full details of where your address came from: planwatch.co.uk/letter-notice.”

The stop-mail page and the full letter notice are live, and every row in a PlanWatch list carries its own Notice code for this box. Keep the heading “Why you are getting this letter”: the stop-mail page tells households to look for their code in a box with that heading. PlanWatch supplies the code and the two pages, not the notice text itself, so the wording above is yours to adapt.

How to word the rest of the letter

The notice handles the law. The rest of the letter is where you win the job: name the work in the application, show one relevant past job, give one clear next step. Here are real descriptions from the register (council text only, no addresses) and what a good opening line would pick up on:

  • Croydon, May 2026: “Erection of rear dormer with Juliet balcony and two rooflights to front and side roof slopes.” A roofer or loft firm leads with dormers and rooflights.
  • Bromley, May 2026: “Demolition of existing conservatory and construction of single storey rear extension”. A demolition or groundworks firm leads with clearing the conservatory safely.
  • Leeds, May 2026: “Two storey side extension; single storey rear extension; porch to front; rooflights to front and rear”. A builder or scaffolder leads with phasing a two-storey job.
  • City of Edinburgh Council, May 2026: “Replace existing timber windows with new white PVC window profiles to match existing.” A window fitter leads with matching profiles.

Refer to the work in your own words. Don't paste the whole description, and never mention anything personal it contains.

Mailing Preference Service, the CAP Code and How Often to Write

Mailing Preference Service (MPS)

The MPS lets people register to receive less personally addressed advertising mail. Screening against it is not a legal requirement. It is a condition of the Data & Marketing Association's code for its members, and the CAP Code expects marketers to check lists against relevant suppression files. The ICO's direct marketing guidance says you should check names and addresses against it before mailing.

Because MPS is built around mail addressed to named people, it is generally understood not to cover letters addressed only to “The Occupier”. That is one more reason the occupier format is the cleaner choice. But a household on MPS has told the world it dislikes addressed advertising mail, which is relevant to your balancing test. If someone says they are registered, treat it as an objection and stop.

CAP Code basics for planning letters

  • Make it obviously a marketing letter from a business.
  • Don't imply council, government or Planning Portal involvement or endorsement.
  • Back up any claim you make (“fully insured”, “20 years' experience”, “rated 5 stars”).
  • Respect the person's request to stop.

How often to write

One relevant letter per application is the safest pattern, and it is also where most of the response comes from if the timing is right. A single follow-up is a judgement call: note why in your one-page assessment, and send nothing more after any objection. A monthly drip to the same house is where the balance tips against you.

The other frequency problem is across firms. A household that files one application can hear from a roofer, a scaffolder, a builder and a window firm in the same month. That is why a cap on letters per household matters, and why one firm per trade per area is better for everyone, including you. Our trade guides go deeper on timing: how roofers get work, how scaffolders find work and how demolition firms find work.

England, Wales, Scotland and Northern Ireland

Data-protection law is UK-wide: UK GDPR, the Data Protection Act 2018 and PECR apply in all four nations, and the ICO regulates everywhere. What differs is the planning system and the register.

Nation Planning law and register What it means for your letter
England Town and Country Planning Act 1990; register under s.69 and DMPO 2015 art. 40 Same rules as above. Cite the council by name, for example Croydon or Leeds
Wales Town and Country Planning Act 1990 as applied in Wales; Development Management Procedure (Wales) Order 2012 Same data-protection rules. Each council keeps its own register, such as Cardiff
Scotland Town and Country Planning (Scotland) Act 1997; Development Management Procedure (Scotland) Regulations 2013 Same data-protection rules. Different planning terms, so describe the work in plain words. See City of Edinburgh
Northern Ireland Planning Act (Northern Ireland) 2011; 11 councils handle most applications Same data-protection rules. Most councils share a regional planning portal, such as Belfast

PlanWatch's register reads councils in all four nations. Whatever the nation, name the council whose register you used, because that is your “source” under Article 14.

How PlanWatch Demand Radar Is Built Around These Rules

Demand Radar is PlanWatch's monthly lead list for trades: a deduplicated, mailing-house-ready list of addresses with relevant planning applications, for one trade in a patch you choose, for £149 a month. It is built with the rules on this page in mind:

  • Owner/Occupier, no names. Applicant names are not stored or supplied. Every row is addressed to “The Owner/Occupier”, with the planning reference so your letter can say why you are writing.
  • Mail only. Every list comes with the same instruction: “Mail only — no email, no SMS, no cold calls. Each letter should cite the planning reference and carry an opt-out address.”
  • A Notice code on every row, for your letter's notice box, so a household can opt out without typing its address.
  • A household stop list. A household that uses planwatch.co.uk/stop-mail comes off every firm's future PlanWatch lists, not just yours. It applies to the next batch and to any list downloaded after the request, even one generated earlier.
  • A household notice at planwatch.co.uk/letter-notice explaining where the address came from, why, and the household's rights.
  • Your own suppression list, applied before every batch, for objectors and anyone you must not mail.
  • Exclusive cover: one firm per trade per area if you choose it, checked before you pay, and a cap on letters per household each month across every trade.
  • Refused and withdrawn applications dropped, so you are not writing about a project that is not happening.

What it does not do: PlanWatch does not print or post your letters, and it does not write your legal assessment for you. You send the letter, so you are responsible for what it says and for honouring objections. The notice above is the quickest way to get that right. None of this is a statement that any set-up, ours included, is legally compliant or solicitor-approved: our own compliance work is ongoing, and you should check your letters against your own business. PlanWatch's own published case study, on the Demand Radar page, is 500 letters in Hillingdon traced to 35 jobs.

When to Get Professional Help

Plenty of trades sending one relevant letter per application, with a clear notice, handle this themselves using the ICO's guidance. Get advice from a data-protection solicitor or consultant in these situations.

Before you start if

  • you plan to buy or build lists covering thousands of households a month
  • you want to merge register data with other data (phone numbers, social media, credit or property data)
  • you want to write to named applicants or use details from planning documents

Straight away if

  • you receive a complaint from the ICO or a letter from a solicitor
  • someone says you kept writing after they asked you to stop
  • you find you have mailed a household using sensitive details from an application

What to learn from Basildon

Basildon Borough Council was fined £150,000 by the ICO, later halved to £75,000 on appeal, after publishing a planning statement online that contained sensitive information about a family, including disability details. It was a council and an older law, but the point carries over: planning content can carry sensitive personal information. Use the address and the type of work, nothing more.

How We Counted

  • Source: PlanWatch's own planning register, pulled 20 October 2026: applications validated between 1 May and 30 September 2026, from 377 councils.
  • Volumes: 244,364 applications in the five months. The monthly figure of 48,873 is that total divided by five (our arithmetic). Council coverage grew to 377 only in May 2026, so earlier months are not comparable and are left out.
  • Householder share: 46,220 applications (18.9%) were classed as householder. For most rows the application type is inferred by our scrapers from the description, so treat this as approximate.
  • Example descriptions: drawn at random from the window and checked by hand. Rows were filtered out automatically if they contained a name or title, a street or house name, a postcode, a reference number, or any health, disability, child or family wording. Text is the council's description, verbatim.
  • Law: summarised from UK GDPR (Articles 6, 14 and 21), PECR, the Data (Use and Access) Act 2025, the planning legislation named above and ICO direct marketing guidance, as at October 2026. Case summaries are from published reports, not the full judgments.

Sources

Primary law and regulator guidance this page relies on (checked October 2026):

Frequently Asked Questions

Is it legal to write to homeowners about planning applications?

Yes, a posted letter to “The Owner/Occupier” about a public planning application can be lawful in the UK. UK GDPR still applies, so you need a lawful basis (usually legitimate interests), you must say where you got the address, give a clear way to stop, and honour every objection.

Do I need consent to send a letter to someone who applied for planning permission?

Usually not. Post is outside PECR, the rules that require consent for marketing emails and texts, and legitimate interests is the likely basis for a relevant letter. You still have to pass the legitimate interests balancing test, tell people where their address came from and let them opt out.

Can I phone, text or email people who applied for planning permission?

Treat it as a no. Marketing emails and texts to individuals need prior consent under PECR, which you will not have, and live sales calls must be screened against the Telephone Preference Service. The register normally does not publish applicants' phone numbers or emails, and hunting them down adds a second data-protection problem.

Is the planning register public data I can use freely?

No. The register is public so people can see and comment on proposed development, not so it can be used for marketing without limits. The ICO's view is that publicly available information is not free to use for direct marketing just because it is public. You can use it, but only within UK GDPR.

What must a marketing letter about a planning application say?

Who you are and how to contact you, that the address came from the named council's public planning register (with the reference), why you are writing and your legal basis, how long you keep the address, a clear and separate way to stop further letters, and that the person can complain to you or to the ICO.

What if a homeowner asks me to stop?

Stop, for good. The right to object to direct marketing is absolute under Article 21 of UK GDPR, so you cannot argue or ask for a reason. Add the address to a do-not-mail list that you check before every mailing. If the letter came from a PlanWatch list, the household can also use planwatch.co.uk/stop-mail to come off every firm's PlanWatch-sourced lists.

Does the Mailing Preference Service apply to letters addressed to “The Occupier”?

The Mailing Preference Service is built around personally addressed mail, so it is generally understood not to cover mail addressed only to “The Occupier”. Screening against it is a condition of industry codes, not a legal requirement. A household that has registered has still told the world it dislikes addressed advertising, so respect it if they tell you.

Can I use the applicant's name from the planning register?

You can find names on many council portals, but we recommend you do not use them. A named letter uses more personal data, brings Mailing Preference Service screening into play under industry codes, and can feel like being watched. “The Owner/Occupier” with the planning reference is clearer about why you are writing and carries less risk.

Do I need to pay the ICO data protection fee to send planning letters?

Possibly. Many businesses that handle personal data must pay the ICO's annual data protection fee, but there are exemptions, including for some marketing of your own business. The ICO has a short online self-assessment that tells you whether you need to pay.

Disclaimer: PlanWatch provides general information about UK planning processes. This content is not legal advice. Planning law is complex and varies by local authority. Consult a qualified planning consultant or solicitor for advice specific to your situation.

All For trades guides
For trades · 18 min How to Get Roofing Leads from Planning Applications: 2026 Data on Dormers, Re-roofs and Extension Roofs How to get roofing leads nobody else is sharing: 14,116 planning applications a month imply roof work. Where they are, when the roof goes on, the letter. For trades · 19 min How to Find Scaffolding Work in Planning Applications, Months Before the Builder Books Scaffold 12,664 planning applications a month create scaffold work. How to find scaffolding jobs on the register, which need scaffold, and how to get there first. For trades · 18 min How to Find Demolition Work in Planning Applications: 2026 Data, Rules and Timing 3,245 UK planning applications a month name demolition. Where they are, how fast they get decided, the Part 11 rules, and how to win the job first. For trades · 18 min UK Planning Application Statistics 2026: 48,873 a Month, by Council, Trade and Season How many planning applications are there in the UK? 48,873 a month across 377 councils. Original 2026 data by council, trade and month. Free to quote. Near you · 7 min What's Being Built Near Me? View Planning Applications Free Find out what's being built near you: search planning applications free by postcode, check submitted or approved plans, view drawings and set alerts. Applications and decisions · 5 min Planning Application Consultation Period: How Long Do You Have? Guide to planning consultation periods, neighbour letters, site notices, late comments, amended plans and how to respond before the deadline.

Planning near you

See every planning application a council has received, by area.

For local trades

See what your patch had this month

See how many planning applications in your patch match your trade, and whether exclusive cover for your trade is still free there, before you write a single letter.

  • Exclusive cover: one firm per trade
  • Refused and withdrawn dropped
  • Mail only, no cold calls