Driveway and landscaping applications — plus every big build that will wreck a garden.
Explicit landscaping and access applications are immediate work. Behind them: every extension and new dwelling ends with a garden reinstatement 3–12 months later. Both are in the register.
9,969 matching applications hit the UK register in the last 30 days — filtered down to just the councils or postcode areas you cover.
Why the register beats every other lead source
Driveways run £5,000–£20,000; full garden schemes far more. The register hands you both the now and the later.
Exactly what we match for landscapers & driveway contractors
This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.
| Trigger | Example from the register | Demand window | Confidence | Why it matters to you |
|---|---|---|---|---|
| Landscaping / driveway / external works | New driveway and dropped kerb with associated hard and soft landscaping | now – 3 months | high | the application is the external/landscaping work itself |
| Swimming pool / outdoor leisure | Erection of outbuilding and construction of outdoor swimming pool | now – 4 months | medium | pool builds re-land the whole garden around them |
| Two-storey / first-floor extension | Two storey side extension and single storey rear extension | 4 – 9 months | medium | the garden is reinstated after the build |
| Single-storey extension | Householder Planning Application - Single storey rear and side extension | 3 – 8 months | medium | the garden is reinstated after the build |
| New dwelling(s) / self-build | Planning Application for the erection of a two storey dwelling with garage | 6 – 12 months | medium | gardens and drives are finished last |
| Extension (storeys unspecified) | Proposed rear extension and internal alterations | 3 – 8 months | low | garden reinstatement likely — unconfirmed |
Landscaping/driveway applications are immediate; post-build reinstatement lands 3–12 months after consent. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →
See what’s in your patch
Type the councils or postcode areas you actually work. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.
Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.
How it works
1. Pick your patch
The councils or postcode prefixes you cover — a town, a county, or several.2. We scan the register
Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.3. You get a mailing list
A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.Sample leads (anonymised)
| Trigger | Area | Property | Expected demand |
|---|---|---|---|
| Landscaping / driveway / external works | CO15 | A property near CO15 ●●● | now – 3 months |
| Swimming pool / outdoor leisure | CO12 | A property near CO12 ●●● | now – 4 months |
| Two-storey / first-floor extension | CO13 | A property near CO13 ●●● | 4 – 9 months |
| Single-storey extension | CO16 | A property near CO16 ●●● | 3 – 8 months |
Real batches show the full site address, planning reference, score and reasoning. Samples are illustrative.
The rules (non-negotiable)
Start your subscription
£149/month · landscapers & driveway contractors · your patch
Exclusive cover available: one landscaping and driveways subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.
Other trades we cover
Window & door companies · Conservatory, orangery & garden room installers · Bricklayers & building contractors · Roofing contractors · Spray-foam removal specialists · Loft conversion companies · Kitchen companies · Solar installers · Heat pump & heating engineers · Scaffolding firms · Skip hire & waste companies · Demolition & strip-out contractors · Tree surgeons & arborists
How to actually work these leads
A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →