Construction leads · Bristol

Construction leads in Bristol: 640+ new in 90 days.

646 applications filed with Bristol council in the 90 days to 16 Nov 2026 mean work for at least one trade: extensions, lofts, new windows, roofs, driveways. Pick your trade below, see your numbers, and get the addresses posted to you every month.

filed in the 90 days to 16 Nov 2026
646
in the last 12 months
2,086
busiest postcode district
BS9
Bristol · work for tradesby filing month
Applications filed with Bristol council that match at least one trade at high or medium confidence. Refused and withdrawn applications are left out. *November to 16 Nov 2026.
By trade

Planning leads in Bristol, trade by trade.

Bristol council took 3,807 planning applications in the 12 months to 16 Nov 2026. 2,086 of them (55%) mean work for at least one trade; the rest are adverts, trees, conditions and paperwork, and they never reach a list.

Of the main building trades, Bristol's register favours windows & doors (1,114), roofing (962) and builders & bricklayers (780): one application usually means work for several trades, so these overlap.

The most active postcode districts are BS9 (294), BS8 (279) and BS6 (261).

About 235 trade-relevant applications a month over the last 5 full months, peaking in July 2026 with 257.

Applications that mean work, last 12 months

One application usually means work for several trades, so the rows overlap.

Where in Bristol, by postcode district

  • BS9294
  • BS8279
  • BS6261
  • BS3178
  • BS7159
  • BS5132
  • BS16127
  • BS4126

Your trade in Bristol

Off the register

The latest building work filed in Bristol, address hidden.

As filed with the council, newest first, tagged with the trade whose list it lands on. Subscribers get the full site address and planning reference for every one.

  • 12 Nov 2026 BS6 Builders Awaiting decision

    Single storey rear extension to form larger kitchen / family room. Box dormer to facilitate loft conversion.

    ●● ●●●●●●●● ●●●●, BS6
    Kitchen extension / open-plan kitchen · work due now to 3 months from the decision
  • 11 Nov 2026 BS14 Builders Awaiting decision

    Two storey side extension, single storey rear extension, loft conversion with dormer, detached garden building, demolition of existing garage.

    ●● ●●●●●●●● ●●●●, BS14
    Two-storey / first-floor extension · work due now to 4 months from the decision
  • 10 Nov 2026 BS4 Landscaping & driveways Awaiting decision

    Construction of a new single storey rear extension to provide an additional bedroom. Internal reconfiguration works on the first floor including the creation of an…

    ●● ●●●●●●●● ●●●●, BS4
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 10 Nov 2026 BS9 Windows & doors Awaiting decision

    Erection of a garden room within curtilage of a listed building.

    ●● ●●●●●●●● ●●●●, BS9
    Conservatory / orangery / porch / garden room · work due 1 to 4 months from the decision
  • 9 Nov 2026 BS9 Loft conversions Awaiting decision

    Removal of single storey side extension. Proposed 2 storey side extension. Extension of front dormer.

    ●● ●●●●●●●● ●●●●, BS9
    Loft conversion / dormer · work due now to 2 months from the decision
  • 5 Nov 2026 BS3 Landscaping & driveways Awaiting decision

    Change of use and conversion of Rock Cottage from an office use (Class E.g.i) to four residential units (use class C3). Alterations to existing boundary walls…

    ●● ●●●●●●●● ●●●●, BS3
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 8 Sep 2026 BS6 Kitchens

    Demolition of existing rear single story kitchen and construction of full width single story extension with flat roof.

    ●● ●●●●●●●● ●●●●, BS6
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision
  • 7 Sep 2026 BS10 Kitchens

    A rear extension to create a kitchen diner, this will replace the existing outbuildings.

    ●● ●●●●●●●● ●●●●, BS10
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

Timing

The plans are public weeks before Bristol decides.

A homeowner tells the council first. By the time they search for a firm, they’re already getting quotes. Your letter can land in the first week.

  1. Day 0Plans filed with Bristol council

    The drawings go on the public register. That’s when we read them.

  2. Week 1Your letter lands

    Addressed to the Owner/Occupier, before the homeowner has rung anyone.

  3. About week 8The council decides

    The statutory target for household applications. Many take longer.

  4. ThenThey start ringing firms

    Your competitors meet them here. You wrote to them two months ago.

Patch check

Is your patch still yours to take?

Tell us what you do and where. We’ll run the last 90 days of the public register through the same rules your list uses and show you the demand for your trade sitting in it right now. No card, no trial, no obligation.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

The rules

Straight about what you get, and what you don’t.

Post only

Addresses for letters to “The Owner/Occupier”. No phone numbers, no names, no doorstep lists.

One firm per trade per patch

Exclusive cover means we won’t sell your councils or postcodes to another firm in your trade while you hold them. Checked before you pay.

A limit on letters per home

We limit how many PlanWatch letters one household gets in a month, across every trade. Exclusive cover is never held back by that limit.

Price

£149 a month. Bristol, yours.

One trade, Bristol or any patch you choose, billed monthly. No contract, no trial. If someone in your trade already holds Bristol, we tell you before you pay.

  • An addressed list of every matching home in Bristol, with the work filed and when your trade is needed
  • Your patch, your trade, nobody else: exclusive cover, checked before you pay
  • A CSV your printer or mailing house runs as it is
  • First list in 24 hours, then only the new homes every month. Never the same address twice
Demand RadarExclusive patch
£149a month · one trade · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Something we haven’t answered? Email business@planwatch.co.uk and a person will reply within one working day.

How many construction leads are there in Bristol?

646 in the 90 days to 16 Nov 2026 and 2,086 in the 12 months to the same date: planning applications filed with Bristol council that match at least one trade's rules at high or medium confidence. Refused and withdrawn applications are left out.

Which trades get the most work from planning applications in Bristol?

Over the last 12 months: skip hire & waste (1,195), electricians (1,188), windows & doors (1,114), flooring (1,046), plastering & decorating (1,046) and roofing (962). Most applications mean work for more than one trade: an extension needs a builder, a roofer, windows, electrics and plastering.

Where in Bristol is the most building work?

By postcode district, over the last 12 months: BS9 (294), BS8 (279), BS6 (261), BS3 (178) and BS7 (159).

How quickly does Bristol council decide planning applications?

The statutory target for a householder application is eight weeks in England and Wales and two months in Scotland. A letter sent the week an application is filed in Bristol lands well before the decision, and long before the homeowner starts ringing round.

Where does the data come from?

Bristol council's own public planning register, read every day. We match each application against the trade rules your list uses, drop refused and withdrawn applications, and keep one line per household. We never sell names or phone numbers.

How do I get the addresses?

Pick your trade and claim your patch: £149 a month for one trade. Your first list arrives within 24 hours, then only new homes every month, as a CSV for letters to "The Owner/Occupier". One firm per trade per patch.

Near Bristol

Construction leads in the councils around Bristol.

Counts are refreshed daily from the register and dated 16 Nov 2026. In the 90-day count, “new” means filed from 19 Aug 2026 to 16 Nov 2026.

Bristol filed 646 building applications in 90 days. Who wrote to them?

Check your patch in one field: no card, no sign-up. If it’s free in your trade, it’s yours for £149 a month.

PlanWatch for business · leads from the public UK planning register · postal outreach only, addressed to “The Owner/Occupier”. How it works