Demand Radar Dashboard
£149 / month
You handle the mailing. Download your address list and send it to your printer, or post your own letters.
Choose dashboardEvery dormer and loft conversion application in your area, the week it is validated. A loft application is the loft job itself, named in the text: dormer, hip-to-gable, mansard, roof-space conversion. Some are filed by a specialist already appointed — plenty are homeowner- or architect-filed with nobody attached, and speed decides who gets the survey visit.
2,876 matching applications hit the UK register in the last 30 days, from the 376 council registers we read daily — filtered down to just the councils or postcode areas you cover.
Enter a full postcode to search a 5 km business radius, or name the councils or postcode districts you cover. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.
Leave your details and we’ll be in touch today.
Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.
Applications matching our rules for loft conversion companies in our busiest councils, filed in the 90 days to 20 Nov 2026. Open a council for its numbers.
Homeowners appoint whoever surveys first once consent lands.
Your competitors' jobs are visible in the register — as are the ones still unclaimed.
Ad costs for "loft conversion [town]" keep climbing; the register is flat-rate.
Loft conversions run £40,000–£75,000. Even a thin patch produces steady declared demand.
This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.
| Trigger | Example from the register | Demand window | Confidence | Why it matters to you |
|---|---|---|---|---|
| Loft conversion / dormer | Loft conversion with rear dormer and 3 no. rooflights | now – 2 months | high | the application IS the loft job — a share are filed by an already-appointed specialist, which is printed on every row rather than hidden in the tier |
| Two-storey / first-floor extension | Two storey side extension and single storey rear extension | 3 – 8 months | low | some two-storey schemes take the roof space in the same programme — unconfirmed |
Actionable immediately — mail fast, because a share of applications already have a specialist attached. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →
The councils or postcode prefixes you cover — a town, a county, or several.
Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.
A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.
As filed with the council, newest first. Subscribers get the full site address, the planning reference and the reason it matched, for every one.
| Filed | Council | The work, as filed | Why it matched |
|---|---|---|---|
| 20 Nov 2026 | Barnet N20 | Alterations to roof involving increase in volume to existing rear dormers and installation of a roof lantern | Loft conversion / dormerwork due now to 2 months from the decision |
| 20 Nov 2026 | Redbridge IG8 | Installation of 6no. solar panels on flat roof of rear extenion and 9no solar panels on flat roof of rear dormer. (Summary). | Loft conversion / dormerwork due now to 2 months from the decision |
| 20 Nov 2026 | Bradford BD15 | Single storey side and rear extension , garage conversion. hip to gable conversion, raise in ridge height and dormer windows to front and rear | Loft conversion / dormerwork due now to 2 months from the decision |
| 20 Nov 2026 | Southwark SE21 | Construction for a slight enlargement of the existing rear dormer, to accommodate insulation, with zinc cladding replacing the existing lead; - replacement of the… | Loft conversion / dormerwork due now to 2 months from the decision |
| 20 Nov 2026 | Northumberland NE65 | Re-roof property with increased ridge height and new dormer windows to accommodate loft conversion. | Loft conversion / dormerwork due now to 2 months from the decision |
| 19 Nov 2026 | Enfield N18 | Rear dormer with front roof lights. | Loft conversion / dormerwork due now to 2 months from the decision |
Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.
Postal outreach only. Mail only — no email, no SMS, no cold calls. Each letter should cite the planning reference and carry an opt-out address. The data is from the public planning register; we store no applicant names and address letters to "The Owner/Occupier".
Both packages include your dashboard and a fresh monthly list of homes in your patch.
£149 / month
You handle the mailing. Download your address list and send it to your printer, or post your own letters.
Choose dashboard£215 / month
We design your card. Once you approve the proof, we print and post up to 50 cards a month to matching homes in your patch.
Request card distributionExclusive cover available: one loft conversions subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.
£149/month · loft conversion companies · your patch
Already a subscriber? Open your dashboard →
Questions before you sign up? Email business@planwatch.co.uk.
Yes, and we say so openly: the caveat is printed on every row rather than buried in a confidence tier. The ones with nobody appointed are decided by whoever arrives first, which is the whole reason to mail the week the application appears.
No, and that is deliberate. A rooflight on its own is usually an extension roof, not a loft job — an audit found nearly three in ten rooflight rows were exactly that. Only genuine loft language (dormer, hip-to-gable, mansard, conversion of the loft or roof space, raising the ridge) reaches this list.
Yes. Demand Radar Done for You costs £215 a month, including the £149 dashboard. Give us your branding and contact details and we design a card for you to approve. Printing and UK postage are included for up to 50 matching homes a month. If fewer homes qualify, we send fewer cards. We check your patch and agree the first mailing with you before taking payment.
Demand Radar Dashboard and Business both cost £149 a month. Demand Radar Dashboard supplies an addressed mailing list every month for one trade in your patch, with exclusive cover: it is for firms that write to homes. The Business plan is alerts, keyword rules, a dashboard and an API across any councils you name, with no addresses: it is for firms that want to know within hours of something reaching the register and contact people their own way. If you want letters through doors, Radar. If you want a feed, Business.
Published planning applications from the UK planning register — planning.data.gov.uk plus direct council sources, covering 378 local authorities. That register is public information. What you pay for is the trade-trigger matching, the demand-window timing, the deduplication and the suppression, not the raw fact of the applications.
There is no fixed cut-off date. We look back across the register and keep only the applications whose buying window for your trade is still upcoming, open or closing. In practice that means most of a first list is the last six months of live projects, plus a tail of larger builds from further back that are only now reaching your stage. Anything finished or already past its window is dropped, and each household appears once and is never sent to you twice — as is anything refused or withdrawn, unless your trade is architects and planning consultants, where a stalled application is the whole point. Whether that first list comes out bigger or smaller than the 90-day figure on the patch checker depends on how long your trade's buying window is, and it goes both ways. A long-window trade — glazing, kitchens, flooring — gets a much bigger first list, because consents from six or twelve months back are only now reaching its stage. A fast-window trade like skip hire or demolition gets a smaller one, because a nought-to-three-month window has already closed on a good share of what the checker counted. Either way later months are smaller than the first: they carry new applications only.
No, and that is deliberate. The register is published for planning transparency, not to build a calling list. We store no applicant names, so there is nothing to phone: letters are addressed to "The Owner/Occupier" at the property. Mail only — no email, no SMS, no cold calls — and every letter should cite the planning reference and carry an opt-out address. Firms that want a dialler list are not a fit for this product.
One planning application can be work for several trades, so we limit how many of our subscribers can post the same household in the same month. A shared-cover subscriber may see a few addresses held back until the next month, and the dashboard and batch email say how many. Exclusive cover is never held back by that limit: an exclusive subscriber always gets every address in their patch.
One subscriber per trade, per patch. The check runs before you pay: if another firm in your trade already holds those councils or postcode areas, we tell you at signup and take no money. Exclusivity is scoped to your trade only — a roofer and a window company can both hold the same town without clashing.
Yes. Billing is monthly and you can cancel at any time; cover runs to the end of the month you have paid for, then the patch is released for someone else. There is no minimum term and no contract to exit.
You go straight to secure checkout, and your first list is generated within 24 hours of activation rather than a month later. That first list is not a snapshot of the last few weeks: it carries every live application in your patch whose buying window for your trade is still upcoming, open or closing, which in practice is most of the last six months plus some larger builds from further back that are only now reaching your stage. Finished jobs are dropped and each address appears once. Refused and withdrawn applications are dropped too for every building trade — with one deliberate exception: on the architects and planning consultants list they ARE the list, because a refusal is the moment a household discovers it needs drawings. After that a fresh list arrives every month covering new applications only, so it will be smaller than the first. If your patch turns out to be thinner than you expected in that first month, tell us and we will sort it out.
Read firstIs it legal to write to homeowners about planning applications?
A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →
PlanWatch Demand Radar · leads sourced from the public UK planning register · postal outreach only. All trades · The guide