Construction leads · Bradford

Construction leads in Bradford: 630+ new in 90 days.

638 applications filed with Bradford council in the 90 days to 16 Nov 2026 mean work for at least one trade: extensions, lofts, new windows, roofs, driveways. Pick your trade below, see your numbers, and get the addresses posted to you every month.

filed in the 90 days to 16 Nov 2026
638
in the last 12 months
2,168
household & minor work granted, 2025
87.2%
Bradford · work for tradesby filing month
Applications filed with Bradford council that match at least one trade at high or medium confidence. Refused and withdrawn applications are left out. *November to 16 Nov 2026.
By trade

Planning leads in Bradford, trade by trade.

Bradford council took 3,237 planning applications in the 12 months to 16 Nov 2026. 2,168 of them (67%) mean work for at least one trade; the rest are adverts, trees, conditions and paperwork, and they never reach a list.

Of the main building trades, Bradford's register favours windows & doors (1,451), roofing (1,292) and builders & bricklayers (1,176): one application usually means work for several trades, so these overlap.

The most active postcode districts are LS29 (327), BD2 (139) and BD7 (138).

About 240 trade-relevant applications a month over the last 5 full months, peaking in September 2026 with 261.

Applications that mean work, last 12 months

One application usually means work for several trades, so the rows overlap.

Where in Bradford, by postcode district

  • LS29327
  • BD2139
  • BD7138
  • BD9136
  • BD20129
  • BD22113
  • BD18104
  • BD595

Your trade in Bradford

Off the register

The latest building work filed in Bradford, address hidden.

As filed with the council, newest first, tagged with the trade whose list it lands on. Subscribers get the full site address and planning reference for every one.

  • 16 Nov 2026 BD3 Builders Awaiting decision

    Construction of single storey rear extension of the following dimensions: Depth of proposed extension from rear wall of original dwellinghouse: 6.0 m Maximum height of…

    ●● ●●●●●●●● ●●●●, BD3
    Single-storey extension · work due now to 3 months from the decision
  • 16 Nov 2026 LS29 Windows & doors Awaiting decision

    Replacement of existing timber-framed windows with wood-effect uPVC windows

    ●● ●●●●●●●● ●●●●, LS29
    Replacement windows / doors · work due now to 2 months from the decision
  • 11 Nov 2026 LS29 Loft conversions Awaiting decision

    Demolition of garage and construction of a side extension incorporating front and rear dormers. Additional dormer to the opposite (east) side elevation. Single storey…

    ●● ●●●●●●●● ●●●●, LS29
    Loft conversion / dormer · work due now to 2 months from the decision
  • 11 Nov 2026 LS29 Loft conversions Awaiting decision

    Demolition of single storey rear extension. Construction of two storey infill side extension with rear dormer window- hip to gable roof extension with rear dormer window…

    ●● ●●●●●●●● ●●●●, LS29
    Loft conversion / dormer · work due now to 2 months from the decision
  • 9 Nov 2026 BD4 Landscaping & driveways Awaiting decision

    T1 Willow - Remove to access the pond to drain and regenerate the pond. T2 Lime - Remove to clear entrance for driveway. T3 Chestnut - Remove as it is a hazard to the…

    ●● ●●●●●●●● ●●●●, BD4
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 5 Nov 2026 BD20 Landscaping & driveways Awaiting decision

    Change of use of land to form a self-storage facility. Installation of 3No blocks of storage units with associated hard standing, roof mounted solar panels and timber…

    ●● ●●●●●●●● ●●●●, BD20
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 30 Sep 2026 LS29 Kitchens Awaiting decision

    Demolition of existing conservatory and construction of single storey rear extension. Installation of garage door and replacement of existing dining room window with…

    ●● ●●●●●●●● ●●●●, LS29
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision
  • 27 May 2026 BD2 Kitchens Awaiting decision

    Infilling the existing balcony to form a dining room extension to the rear

    ●● ●●●●●●●● ●●●●, BD2
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

Timing

The plans are public weeks before Bradford decides.

A homeowner tells the council first. By the time they search for a firm, they’re already getting quotes. Your letter can land in the first week.

decided in time, incl. agreed extensions
82.8%
household & minor granted
87.2%
decisions in 2025
2,330

MHCLG planning statistics (PS2), Bradford, 2025. “Household & minor” is the government’s “other” category, which holds householder applications: 1,476 granted of 1,693. Bradford approval rates in full

  1. Day 0Plans filed with Bradford council

    The drawings go on the public register. That’s when we read them.

  2. Week 1Your letter lands

    Addressed to the Owner/Occupier, before the homeowner has rung anyone.

  3. About week 8The council decides

    The statutory target for household applications. Many take longer.

  4. ThenThey start ringing firms

    Your competitors meet them here. You wrote to them two months ago.

Patch check

Is your patch still yours to take?

Tell us what you do and where. We’ll run the last 90 days of the public register through the same rules your list uses and show you the demand for your trade sitting in it right now. No card, no trial, no obligation.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

The rules

Straight about what you get, and what you don’t.

Post only

Addresses for letters to “The Owner/Occupier”. No phone numbers, no names, no doorstep lists.

One firm per trade per patch

Exclusive cover means we won’t sell your councils or postcodes to another firm in your trade while you hold them. Checked before you pay.

A limit on letters per home

We limit how many PlanWatch letters one household gets in a month, across every trade. Exclusive cover is never held back by that limit.

Price

£149 a month. Bradford, yours.

One trade, Bradford or any patch you choose, billed monthly. No contract, no trial. If someone in your trade already holds Bradford, we tell you before you pay.

  • An addressed list of every matching home in Bradford, with the work filed and when your trade is needed
  • Your patch, your trade, nobody else: exclusive cover, checked before you pay
  • A CSV your printer or mailing house runs as it is
  • First list in 24 hours, then only the new homes every month. Never the same address twice
Demand RadarExclusive patch
£149a month · one trade · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Something we haven’t answered? Email business@planwatch.co.uk and a person will reply within one working day.

How many construction leads are there in Bradford?

638 in the 90 days to 16 Nov 2026 and 2,168 in the 12 months to the same date: planning applications filed with Bradford council that match at least one trade's rules at high or medium confidence. Refused and withdrawn applications are left out.

Which trades get the most work from planning applications in Bradford?

Over the last 12 months: electricians (1,475), skip hire & waste (1,463), windows & doors (1,451), flooring (1,319), plastering & decorating (1,319) and roofing (1,292). Most applications mean work for more than one trade: an extension needs a builder, a roofer, windows, electrics and plastering.

Where in Bradford is the most building work?

By postcode district, over the last 12 months: LS29 (327), BD2 (139), BD7 (138), BD9 (136) and BD20 (129).

How quickly does Bradford council decide planning applications?

Bradford council decided 82.8% of its applications within the statutory period or an agreed extension of time in 2025, and granted 87.2% of its "other" decisions, the government category that holds householder applications (1,476 of 1,693, MHCLG PS2 figures). The target for a householder application is eight weeks, so a letter sent the week it is filed lands well before the decision.

Where does the data come from?

Bradford council's own public planning register, read every day. We match each application against the trade rules your list uses, drop refused and withdrawn applications, and keep one line per household. We never sell names or phone numbers.

How do I get the addresses?

Pick your trade and claim your patch: £149 a month for one trade. Your first list arrives within 24 hours, then only new homes every month, as a CSV for letters to "The Owner/Occupier". One firm per trade per patch.

Bradford filed 638 building applications in 90 days. Who wrote to them?

Check your patch in one field: no card, no sign-up. If it’s free in your trade, it’s yours for £149 a month.

PlanWatch for business · leads from the public UK planning register · postal outreach only, addressed to “The Owner/Occupier”. How it works