Planning leads that win the job before anyone else knows it exists.
Every loft, extension and knock-through is filed with the council weeks before the homeowner picks a firm. We read 376 council registers every day and keep a ready-to-post list of the homes in your patch.
Five steps, one product. Scroll, and watch a patch turn into letters.
01 — Your patch
Tell us your trade and the streets you cover.
Councils, postcode districts or a radius. We draw the patch and check it is still free in your trade before you pay anything.
Example: 1,089 filings in Enfield in the 90 days to 15 Oct 2026. 200 match loft conversions (illustrative).
02 — The list
Every home about to build, on one list.
We read the register every day, drop the refused and the withdrawn, keep one line per household and print the reason each one matched.
Real Enfield filings, September to October 2026.
03 — Pick
Open any home. Skip the ones you won’t quote for.
Every row opens with the work, why it’s on your list and the application as filed. Mark anything you won’t quote for as Not interested. You get addresses for post, never names or phone numbers.
04 — Post
Your letter lands while they’re still choosing.
Download the CSV for your printer, or choose Done for You and we’ll design, print and post your cards. Each batch carries its own QR code and batch number for your letters, so replies trace back to the letter that won them.
05 — Count the jobs
See which letters turned into work.
Van That’s Quick posted 500 letters across Hillingdon and traced 35 jobs back to them, at £285 a job on average.
£9,975 of new work from £894 of subscription. Thirty-five jobs at £285, against six months at £149. Every job was matched to its leaflet by QR code and batch number, so Van That’s Quick could tell a PlanWatch job apart from every other enquiry they took. Six months in, they’re still a client.
One letterA job traced by QR code and batch
01
Targeted from the register
The register named every Hillingdon home with an extension, loft or demolition approved. Those homes were about to fill a skip.
02
Tracked by QR code and batch
Each leaflet carried a campaign QR code and a batch reference. A scan or a quoted batch number meant the job came from PlanWatch.
03
Repeated every month
New applications land every week, so a fresh, deduplicated batch went out monthly. Never the same house twice.
Done for you
We do the spreadsheet. You do the quoting.
Exactly what you’d do yourself with a free evening, a council website and a spreadsheet, done every day for every council in your patch.
376council registers read every day
0refused or withdrawn applications on your list
1line per household, however many forms they file
0letters to homes you’ve already written to, or that opted out
24hto your first list, then a fresh batch every month
The register, 15 Oct 2026
Your list (lofts and extensions)
Patch check
Is your patch still yours to take?
Tell us what you do and where. We’ll run the last 90 days of the public register through the same rules your list uses and show you the demand for your trade sitting in it right now. No card, no trial, no obligation.
Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.
Want the full list and a monitor built for your firm?
Leave your details and we’ll be in touch today.
The rules
Straight about what you get, and what you don’t.
Post only
Addresses for letters to “The Owner/Occupier”. No phone numbers, no names, no doorstep lists.
One firm per trade per patch
Exclusive cover means we won’t sell your councils or postcodes to another firm in your trade while you hold them. Checked before you pay.
A limit on letters per home
We limit how many PlanWatch letters one household gets in a month, across every trade. Exclusive cover is never held back by that limit.
Demand Radar packages
Who’s posting your cards?
Both packages include your dashboard and a fresh monthly list of homes in your patch.
Demand Radar Dashboard
£149 / month
You handle the mailing. Download your address list and send it to your printer, or post your own letters.
One trade, your patch, billed monthly. No contract, no trial. One job covers it: Van That’s Quick’s first jobs averaged £285, and they won thirty-five.
An addressed list of every matching home in your patch, with the work filed and when your trade is needed
Your patch, your trade, nobody else: exclusive cover, checked before you pay
A CSV your printer or mailing house runs as it is
First list in 24 hours, then only the new homes every month. Never the same address twice
For planning alerts, keyword rules and API access across whole councils, see the Business plan.
Something we haven’t answered? Email business@planwatch.co.uk and a person will reply within one working day.
Can you design and post the cards for me?
Yes. Demand Radar Done for You costs £215 a month, including the £149 dashboard. Give us your branding and contact details and we design a card for you to approve. Printing and UK postage are included for up to 50 matching homes a month. If fewer homes qualify, we send fewer cards. We check your patch and agree the first mailing with you before taking payment.
Demand Radar or the Business plan — which one do I need?
Demand Radar Dashboard and Business both cost £149 a month. Demand Radar Dashboard supplies an addressed mailing list every month for one trade in your patch, with exclusive cover: it is for firms that write to homes. The Business plan is alerts, keyword rules, a dashboard and an API across any councils you name, with no addresses: it is for firms that want to know within hours of something reaching the register and contact people their own way. If you want letters through doors, Radar. If you want a feed, Business.
Where does the data come from?
Published planning applications from the UK planning register — planning.data.gov.uk plus direct council sources, covering 378 local authorities. That register is public information. What you pay for is the trade-trigger matching, the demand-window timing, the deduplication and the suppression, not the raw fact of the applications.
How far back does the first list go?
There is no fixed cut-off date. We look back across the register and keep only the applications whose buying window for your trade is still upcoming, open or closing. In practice that means most of a first list is the last six months of live projects, plus a tail of larger builds from further back that are only now reaching your stage. Anything finished or already past its window is dropped, and each household appears once and is never sent to you twice — as is anything refused or withdrawn, unless your trade is architects and planning consultants, where a stalled application is the whole point. Whether that first list comes out bigger or smaller than the 90-day figure on the patch checker depends on how long your trade's buying window is, and it goes both ways. A long-window trade — glazing, kitchens, flooring — gets a much bigger first list, because consents from six or twelve months back are only now reaching its stage. A fast-window trade like skip hire or demolition gets a smaller one, because a nought-to-three-month window has already closed on a good share of what the checker counted. Either way later months are smaller than the first: they carry new applications only.
Why postal outreach only? Can I get phone numbers?
No, and that is deliberate. The register is published for planning transparency, not to build a calling list. We store no applicant names, so there is nothing to phone: letters are addressed to "The Owner/Occupier" at the property. Mail only — no email, no SMS, no cold calls — and every letter should cite the planning reference and carry an opt-out address. Firms that want a dialler list are not a fit for this product.
How many other PlanWatch letters will the same household get?
One planning application can be work for several trades, so we limit how many of our subscribers can post the same household in the same month. A shared-cover subscriber may see a few addresses held back until the next month, and the dashboard and batch email say how many. Exclusive cover is never held back by that limit: an exclusive subscriber always gets every address in their patch.
How does exclusivity work?
One subscriber per trade, per patch. The check runs before you pay: if another firm in your trade already holds those councils or postcode areas, we tell you at signup and take no money. Exclusivity is scoped to your trade only — a roofer and a window company can both hold the same town without clashing.
Can I cancel?
Yes. Billing is monthly and you can cancel at any time; cover runs to the end of the month you have paid for, then the patch is released for someone else. There is no minimum term and no contract to exit.
What happens if I sign up today for the dashboard?
You go straight to secure checkout, and your first list is generated within 24 hours of activation rather than a month later. That first list is not a snapshot of the last few weeks: it carries every live application in your patch whose buying window for your trade is still upcoming, open or closing, which in practice is most of the last six months plus some larger builds from further back that are only now reaching your stage. Finished jobs are dropped and each address appears once. Refused and withdrawn applications are dropped too for every building trade — with one deliberate exception: on the architects and planning consultants list they ARE the list, because a refusal is the moment a household discovers it needs drawings. After that a fresh list arrives every month covering new applications only, so it will be smaller than the first. If your patch turns out to be thinner than you expected in that first month, tell us and we will sort it out.
By council
Construction leads by council: this quarter’s numbers, trade by trade.
PlanWatch for business · leads sourced from the public UK planning register · postal outreach only, addressed to “The Owner/Occupier”. How it works in detail