For trades · 18 min read

How to Get Roofing Leads from Planning Applications: 2026 Data on Dormers, Re-roofs and Extension Roofs

How to get roofing leads nobody else is sharing: 14,116 planning applications a month imply roof work. Where they are, when the roof goes on, the letter.

PlanWatch Team Planning data team, PlanWatch Updated · First published General information, not legal advice
Check your patch Exclusive cover per trade · Mail only
Dormer · drawn for this guide
On this page 10 sections
  1. 01Why the planning register beats shared roofing leads
  2. 02What the register shows a roofer: the 2026 numbers
  3. 03Why most re-roofs never reach the register
  4. 04The four roofing jobs the register does show
  5. 05When the roof goes on: timing by application type
  6. 06Where the roofing work is: top 10 councils
  7. 07Step-by-step: how to get roofing leads from the planning register
  8. 08A roofing letter that wins the survey: sample outline
  9. 09How we counted
  10. 10Frequently Asked Questions
Short answer

The best roofing leads aren't bought, they're on the council planning register: every dormer, extension and listed-building re-roof that needs consent is published there, dated, months before the roof goes on. In PlanWatch's register (377 councils, May to September 2026), 14,116 applications a month implied roof work, about 2,374 a month involved a dormer, and 88.1% of decided roofing applications (those validated January to mid-May 2026) were approved. Find them, write to the owner by post citing the planning reference, and time your follow-up to when the roof is actually due.

Why the planning register beats shared roofing leads

Ask how roofers get jobs and you get the same four answers: word of mouth, the builder's phone book, storm call-outs and lead sites. Each one has the same flaw. By the time you hear about the job, someone else has too.

  • Shared lead sites pass one enquiry to more than one firm by design. You are racing other roofers to the same phone call, usually on price.
  • Storm-chasing is feast and famine. A wet, windy week fills the diary with patch repairs; a dry month empties it.
  • Builder referrals are steady but they're the builder's choice, not yours. On an extension, the roof usually goes to whoever the builder already uses.
  • Word of mouth is the best lead there is and the one you can't scale.

The planning register is different. Councils keep a public register of planning applications by law, and most publish it online. When a homeowner applies for a dormer, a two-storey extension or listed building consent to re-roof, the description, address, date and reference number go on that register. The owner has already paid for drawings, filed the forms and committed to the project. What they haven't done yet is pick a roofer.

Lead source Who else gets it When you hear about the job What you know before you quote
Shared lead site Other firms on the same lead When the homeowner fills in a form Whatever the homeowner typed
Storm call-out Whoever answers first After the damage Very little until you're on the ladder
Builder referral The builder's usual roofer When the shell is up What the builder tells you
Planning register Anyone willing to read it every week Weeks after the application, months before the roof The council's own description of the work, plus the drawings on the council portal

That last column is the edge. You can read what's being built before you write a word. If you'd rather not read 377 council portals yourself, PlanWatch's roofing leads from planning applications service does the reading, matching and deduplication for you. The rest of this guide shows you how to do it either way.

What the register shows a roofer: the 2026 numbers

We ran every application validated between 1 May and 30 September 2026 through the same matcher that builds PlanWatch's trade lists. That's 244,364 applications from 377 councils. Here is what it found for roofing.

Measure (May to Sep 2026) Count Per month
Applications that create roofing work (implied demand) 70,580 14,116
Share of all applications 28.88%
Applications that name a re-roof outright 1,729 346
Roofing-matched applications involving a dormer 11,871 about 2,374 (our division)
Loft conversion applications 14,496 2,899

Read the two headline numbers differently. The 14,116 is implied demand: applications for work that needs a roofer, mostly extensions, dormers and new builds, even though the description never says "roof". The 346 is applications whose own words name a re-roof or roof replacement. If someone tells you there are thousands of re-roof jobs on the register every month, they're counting the first number and selling the second.

Three more figures matter for planning your outreach:

  • Most get approved. 88.1% of roofing-matched applications decided between January and mid-May 2026 were approved (11,631 decisions). In the May to September window the rate was 87.1% (6,842 decisions). So mailing at the application stage, before the decision, wastes very few letters.
  • Decisions take about 8 weeks. The median roofing-matched application was decided 56 days after validation, which is the statutory 8-week target. That's your head start: about two months between the application appearing and the homeowner having consent in hand.
  • There's no summer rush. On a like-for-like panel of 288 councils, roofing applications ran at 523 per working day in May and 501 in September, a 4% dip. Consented roof work arrives at a steady rate, which is exactly what storm work doesn't do. (We have no winter data yet, so we can't tell you about December.)

Why most re-roofs never reach the register

This is the part most "roofing leads from planning" pages leave out. A straightforward re-roof almost never needs planning permission.

In England, replacing a roof covering like for like is normally either not "development" at all or is covered by permitted development, as long as the roof doesn't get any higher and nothing projects more than 150mm beyond the existing slope. No application, no register entry. Building regulations can still apply to a re-roof even when planning doesn't, but building control notices aren't on the planning register. Scotland and Wales have their own permitted development rules, so check locally.

So when does a re-roof show up? When the building has no permitted development rights for it, or extra protection:

  • Listed buildings. Re-roofing a listed building often needs listed building consent. In our window, 7,605 listed-building applications were filed and 2,080 of them mentioned repair, re-roofing, repointing, render, chimneys, masonry, lead, guttering or restoration. Listed building consent was approved 90.8% of the time in our cohort, with a median of 64 days to decide. See our guide to planning permission for listed buildings.
  • Conservation areas where an Article 4 direction removes the right to change roof materials. Read conservation areas and planning.
  • Flats, maisonettes and commercial buildings, which don't get householder permitted development rights, so a re-roof that changes how the roof looks needs permission.
  • Material changes: a new roof shape, a raised ridge, slate to something else on a protected building.

Here is what those applications look like, word for word from council registers:

  • Buckinghamshire Council, July 2026: "Listed building consent for the conservation-led repair and reroofing of the existing roof covering"
  • South Downs National Park, May 2026: "Re-roof to existing principle building. Replacement of existing windows. Relining and replacement of chimney trays to western end of property. Repointing and repair works to eastern gable wall."
  • Derby City Council, July 2026: "Replacement of existing roof covering and roof lights"

These are rare (346 a month nationally across 377 councils is under one per council per month on average, our arithmetic) but they're valuable: heritage slate, clay tile and leadwork, where the specialist wins on skill rather than price.

One tip if you search the register yourself: search the descriptions for "reroof", "re-roof" and "roof covering", and include listed building consent applications. When we checked, 1,668 applications in the window mentioned re-roofing or replacing a roof covering, and 632 of them (38%) didn't reach roofing in our own matcher, because they were listed-building, commercial or excluded application types. Keyword filters miss these. A human reading the list won't.

The four roofing jobs the register does show

If re-roofs are the rare prize, where do the 14,116 a month come from? Four kinds of application.

1. Dormers and loft conversions: the roof is the job

A dormer is a roofing job from the first cut: opening the slope, new covering, flashings, lead cheeks, often rooflights to the front. 81.9% of the 14,496 loft applications in our window included a dormer, 41.7% mentioned rooflights or Velux windows, and 16.4% were hip-to-gable conversions, which rebuild a whole section of roof.

  • Croydon, May 2026: "Erection of rear dormer with Juliet balcony and two rooflights to front and side roof slopes."
  • Three Rivers District Council, May 2026: "Loft conversion including construction of new roof with increased ridge height with front and rear dormer windows."

Not every dormer needs planning permission. In England many rear dormers are permitted development within volume limits (40 cubic metres of extra roof space on a terraced house, 50 on others), so they mostly reach the register when the owner asks for a lawful development certificate (11% of loft applications in our window were exactly that), when the dormer goes over those limits, when the house is in a conservation area or other protected area, or when the dormer faces the street. Our guide to planning permission for a dormer explains the limits.

The upsell roofers miss: once the scaffold is up for a dormer, the condition of the main roof is right in front of the homeowner. A letter that offers to quote both is quoting for a bigger job.

2. Extensions: the roof follows the shell

This is where most implied roofing demand comes from. Every single-storey extension needs a flat or pitched roof, and every two-storey extension ties a new roof into the old one.

  • Leicester City Council, May 2026: "Construction of two storey side extension, single storey rear extension; removal of two chimneys; alterations to dwelling house (Class C3)"

The roof lands 2 to 5 months after consent, and that gap is your opportunity. The builder is chosen first, and the builder normally brings their own roofer. A letter that's already on the homeowner's kitchen table when they're asked "who's doing the roof?" changes that.

3. Listed and protected re-roofs: the high-margin minority

Covered above. Fewer, slower to decide (median 64 days for listed building consent), but the application is the roofing job itself, and the homeowner is looking for someone who knows lime, lead and natural slate.

4. New houses, garages and outbuildings

New dwellings need a whole roof, but on a longer programme: 4 to 9 months after consent in our timing model. Detached garages, annexes and outbuildings need a small roof quickly, 1 to 4 months after consent. One caution if you're reading raw counts: our new-dwelling trigger also fires on some extensions described as works "to the dwellinghouse", which inflated roofing matches by 1,880 in the window. We say so in the methodology below.

When the roof goes on: timing by application type

A planning lead is only useful if your letter lands before the roof is booked. These are the demand windows PlanWatch uses to time roofing lists, measured from the date of consent. They're our working estimates from typical build programmes, not measured completion dates.

Application type Typical wording Roof work lands (months after consent) How sure we are
Re-roof or roof replacement "Re-roof", "replacement of existing roof covering", listed building consent for reroofing 0 to 2 High: the application is the job
Loft conversion or dormer "Rear dormer", "hip to gable", "loft conversion" 0 to 3 High: the roof structure is the first trade
Single-storey extension "Single storey rear extension" 2 to 4 High: flat or pitched roof follows the shell
Two-storey or first-floor extension "Two storey side extension", "first floor extension" 3 to 5 High: new roof over the extension follows the shell
Extension, storeys not stated "Erection of extension" 2 to 5 Medium
Garage, annexe or outbuilding "Detached garage", "annexe" 1 to 4 Medium: small roof, built quickly
New dwelling(s) "Erection of two dwellings" 4 to 9 Medium: longer programme
Rooflights only "Installation of two rooflights" 0 to 3 Low: often fitted by others

Add the decision time. These windows start at consent. The median roofing-matched application was decided 56 days after validation, so from the day an application appears on the register, a dormer roof is typically 2 to 5 months away and a two-storey extension roof 5 to 7 months away (our arithmetic, adding about two months to each window). That's why mailing early isn't too early: it's the only way to be the name they already have.

Where the roofing work is: top 10 councils

Roofing demand follows housing stock and household budgets. Six of the top ten councils are London boroughs, where loft and dormer work is concentrated.

# Council Roofing-matched applications (May to Sep 2026) Per month Loft applications per month
1 Buckinghamshire 1,122 224.4 47
2 Enfield 1,043 208.6 113.4
3 Cornwall 895 179 not in top 10
4 Leeds 854 170.8 47.6
5 Redbridge 819 163.8 56.8
6 Barnet 798 159.6 64.6
7 Bromley 755 151 47.4
8 Bradford 711 142.2 44.8
9 Ealing 614 122.8 44.2
10 Brent 607 121.4 43.8

Enfield is the standout for dormer work. It had 567 loft applications in five months, 113.4 a month, nearly twice the next council (Barnet, 323). Say you're a roofer covering Enfield: that's more than 25 loft applications a week to read (our arithmetic), and nationally four in five loft applications include a dormer.

Don't write off a quieter patch. The median council handles 102 applications of all kinds a month, and roofing-matched applications are 28.88% of the total nationally, so a typical council still turns up a steady weekly list of extension and loft roofs. For the bigger picture across every trade, see our UK planning application statistics for 2026.

Step-by-step: how to get roofing leads from the planning register

This is the process for a roofer working the register by hand. It's mail only, for reasons explained in step 4. PlanWatch's Demand Radar for roofers automates steps 1 to 3 and hands you a ready-to-print list; the cross-trade playbook, How to get leads from planning applications, goes deeper on each stage.

  1. Pick your patch

    day one

    • List the councils you actually cover. A roofing patch is usually two to four councils, not a county.
    • Find each council's planning search page, or use PlanWatch's council pages such as Leeds or Cornwall to see what's being filed.
    • Check whether a busy London borough like Enfield or Redbridge borders your patch: they file more loft work than most whole counties.
  2. Pull the right applications

    every week

    • Search new applications validated since your last check. Monday is the busiest validation day, so a Tuesday or Wednesday routine catches the week's biggest batch.
    • Search the descriptions for: dormer, loft, hip to gable, mansard, roof extension, ridge, re-roof, reroof, roof covering, two storey, first floor, single storey, rear extension.
    • Include listed building consent applications and read their descriptions, because keyword tools miss heritage re-roofs.
    • Expect a lag: PlanWatch sees the median application 5 days after validation, and 65.4% within a week. Council portals vary.
  3. Qualify each address

    same day

    • Open the drawings on the council portal. Roof pitch, covering, flat roof area and leadwork tell you what you'd be pricing.
    • Drop anything refused or withdrawn, retrospective (the work's already done), or a certificate for existing work.
    • Note the timing window from the table above, so you know whether to mail now or hold the address.
    • Keep one line per household. Owners often file more than one form for the same project.
  4. Write and post the letter

    within days of validation

    • Post only, addressed to "The Owner/Occupier". No phone calls, emails, texts or doorstep visits.
    • The register gives you an address, not a phone number or email, and you shouldn't go looking for one. Marketing calls to numbers on the Telephone Preference Service are unlawful under PECR, and marketing emails and texts to individuals need prior consent.
    • Cite the council and planning reference so the homeowner knows exactly why you're writing.
    • Include who you are, where you got their address and a clear opt-out (see the letter outline below).
  5. Follow up once, on the roof's timing

    when the window opens

    • If you send a second letter, make it one, and time it to when the roof is actually due: 2 to 4 months after consent for a single-storey extension, 3 to 5 for two-storey.
    • Check the council register first: if the application was refused or withdrawn, don't send it.
    • Never write again to an address that opted out, from either letter.
  6. Measure cost per job

    every month

    • Put a QR code or a batch reference on every letter so you can tell a register job from a referral. Each Demand Radar batch carries its own QR code and batch number for exactly this.
    • Track letters sent, enquiries, surveys, quotes and jobs won, and work out cost per job: (letters × print and postage + any list cost) ÷ jobs won.
    • Compare that number with what a shared lead or an ad click costs you per job won, not per enquiry.
    • For reference, PlanWatch's own published case study is a waste-removal firm in Hillingdon, not a roofer: 500 letters, with 35 jobs traced back to them by QR code and batch number. Your trade, patch and letter will give you your own number, which is why you measure it.

A roofing letter that wins the survey: sample outline

A good planning-lead letter is short, specific and honest about where the address came from. Here is the outline we'd use for a dormer application. Swap the details for your own.

To: The Owner/Occupier

Re: Your planning application [council] [reference]: rear dormer and rooflights

We noticed your application on [council]'s public planning register. Dormers are our main work: we've built [number] in [area] in the last [period], including the leadwork and the tie-in to the main roof.

While the scaffold is up for the dormer, it's the cheapest moment you'll ever have to sort the rest of the roof. We'll survey both and give you one price for the dormer roof and one for the main roof, so you can decide.

[Guarantee, insurance, trade body membership if you have them. Two photos of local dormers.]

Call [number] or scan the code to book a free survey. Quote reference [batch number].

About this letter: we're [business name, address]. We got your address from the council's public planning register. If you'd rather not hear from us again, write to us at [address] or [opt-out route] and we won't contact you again.

Three rules make the difference between a letter that works and a letter that gets you a complaint:

  1. Cite the planning reference. It shows the letter is relevant, not junk mail, and it's the reason you can write at all.
  2. Say where the address came from and how to opt out, on the first letter. UK GDPR gives people an absolute right to object to direct marketing, and it has to be brought to their attention at the first communication. If you use a PlanWatch list, each address comes with a notice code for the letter's privacy box, the household can opt out of every PlanWatch subscriber's future lists at /stop-mail, and the full notice for the household is at /letter-notice.
  3. Honour every opt-out, for good. Keep your own stop list and check it before every mailing.

For the full legal picture, including legitimate interests, the Mailing Preference Service and the rules in Scotland and Wales, read is it legal to write to homeowners about planning applications? This is general information, not legal advice.

Want the list without the legwork? Demand Radar for roofers is £149 a month: a monthly, deduplicated, mailing-house-ready list of addresses with roofing-relevant planning applications in your patch, refused and withdrawn applications already dropped, each household once. With exclusive cover, only one roofing firm gets your patch, and we check it's free before you pay. PlanWatch doesn't print or post the letters; your printer or mailing house runs the file as it is. See roofing leads from planning applications in your area. Scaffolders, see the sister guide to how to find scaffolding work in planning applications; every trade's version is on PlanWatch for trades.

How we counted

  • Source: PlanWatch's own planning register, pulled on 20 October 2026. Main window: applications validated between 1 May and 30 September 2026, 244,364 applications from 377 councils. Council coverage grew to its current size only in May 2026, which is why the window starts there.
  • Matching: the same classifier that builds Demand Radar lists, counting only high and medium confidence matches. "Roofing-matched" (70,580) means the application implies roofing work. "Names a re-roof" (1,729) means it matched through the re-roof trigger itself; that's a lower bound, because when another trigger fires first it takes the credit.
  • Known over-count: the new-dwelling trigger also fires on some extensions described as works "to the dwellinghouse". 1,880 roofing matches came only from such a hit, so the implied-demand figure is slightly high. Without them it would be 68,700 (our subtraction).
  • Approval rates are approved ÷ (approved + refused). Most applications in the window were still pending, so the main rate uses applications validated from January to mid-May 2026, checked on 13 August 2026 (11,631 roofing decisions).
  • Days to decision come from that same harvest (10,158 roofing applications with dates), so they're censored at both ends: quick decisions recorded before the check and slow ones still open after it are missing.
  • Application type is often inferred from the description rather than supplied by the council.
  • Seasonality uses a strict panel of 288 councils with data in every month, divided by working days (England and Wales bank holidays).
  • Timing windows are PlanWatch's demand-window estimates from typical build programmes, not measured completions.
  • "Our arithmetic" marks figures we derived by simple division or addition from the counts above: dormers a month (11,871 ÷ 5), re-roofs per council (346 ÷ 377), Enfield lofts a week, and the validation-to-roof ranges.
  • Example descriptions are verbatim council text, chosen from random samples. We show the council and month only, never an address, reference or name.

Frequently Asked Questions

Do re-roofs need planning permission?

Usually not. In England a like-for-like re-roof is normally either not development at all or permitted development, as long as the roof gets no higher and nothing sticks out more than 150mm from the slope. Listed buildings, many conservation areas (through Article 4 directions), flats and commercial buildings are the exceptions, which is why only about 346 applications a month in PlanWatch's register name a re-roof outright.

How soon after approval does the roof go on?

It depends on the job. PlanWatch's demand windows put re-roofs at 0 to 2 months after consent, dormers and loft conversions at 0 to 3, single-storey extensions at 2 to 4, two-storey extensions at 3 to 5 and new houses at 4 to 9. Add roughly two months for the decision itself: the median roofing-matched application was decided 56 days after validation.

Are dormer applications roofing jobs?

Yes. A dormer cuts into the roof, needs new covering, flashing and usually leadwork, and often leaves the rest of the roof open for a re-roof while the scaffold is up. 81.9% of loft applications in PlanWatch's register include a dormer, and 16.8% of all roofing-matched applications involve one.

Can I contact the homeowner by phone?

Don't. Planning registers don't give you a phone number, unsolicited marketing calls to numbers on the Telephone Preference Service are unlawful under PECR, and marketing emails or texts to individuals need their prior consent. Write by post to The Owner/Occupier, cite the planning reference and give a clear way to opt out.

How many roofing jobs are on the register in my area?

Nationally, 14,116 applications a month implied roof work between May and September 2026, across 377 councils. The busiest council was Buckinghamshire at 224.4 a month, followed by Enfield (208.6) and Cornwall (179). The median council handles 102 applications of all kinds a month, so most patches produce a steady list rather than a flood.

Is it legal to write to homeowners about their planning application?

A relevant letter by post is generally possible under UK GDPR's legitimate interests basis, because PECR does not cover post. The conditions matter: tell the household where you got their address, give a clear opt-out at the first letter and honour it. This is general information, not legal advice.

When is the best time to send a roofing letter?

Early. Monday is the busiest validation day (24.2% of the week) and PlanWatch sees the median application 5 days after validation, so a weekly routine that mails new applications within the week reaches homeowners months before the roof is due and before the builder has booked a roofer.

All For trades guides
For trades · 20 min Is It Legal to Write to Homeowners About Planning Applications? Yes, If Your Letter Does These 6 Things Yes, by post, if you do it right. The 6 things a UK planning-lead letter must do under UK GDPR, a notice to copy, and why calls and emails differ. For trades · 19 min How to Find Scaffolding Work in Planning Applications, Months Before the Builder Books Scaffold 12,664 planning applications a month create scaffold work. How to find scaffolding jobs on the register, which need scaffold, and how to get there first. For trades · 18 min How to Find Demolition Work in Planning Applications: 2026 Data, Rules and Timing 3,245 UK planning applications a month name demolition. Where they are, how fast they get decided, the Part 11 rules, and how to win the job first. For trades · 18 min UK Planning Application Statistics 2026: 48,873 a Month, by Council, Trade and Season How many planning applications are there in the UK? 48,873 a month across 377 councils. Original 2026 data by council, trade and month. Free to quote. Your project · 13 min Do I Need Planning Permission for a Dormer? Class B Rules in Full Dormer permitted development in England: the 40/50 cubic metre Class B limits, the principal elevation rule, the 0.2m eaves setback and when you need permission. Your project · 5 min Do I Need Planning Permission for a Loft Conversion? Clear guide to loft conversion planning permission in England, covering permitted development volume limits, dormers, rooflights, balconies, conservation areas, and building regulations. Protected places · 9 min Planning Permission for Listed Buildings: Consent, Rules & What You Can Change Complete guide to listed building consent in the UK. What you can and can't do to a Grade I, II* or II listed building, how to apply, and penalties for unauthorised works.
For local trades

See what your patch had this month

Every week, new dormers, extensions and listed-building re-roofs are validated in your councils, months before anyone books a roofer. Check how many roofing applications your patch produced, and whether exclusive roofing cover there is still free.

  • Exclusive cover: one firm per trade
  • Refused and withdrawn dropped
  • Mail only, no cold calls