Construction leads · Cambridge

Construction leads in Cambridge: 290+ new in 90 days.

295 applications filed with Cambridge City Council in the 90 days to 21 Oct 2026 mean work for at least one trade: extensions, lofts, new windows, roofs, driveways. Pick your trade below, see your numbers, and get the addresses posted to you every month.

filed in the 90 days to 21 Oct 2026
295
in the last 12 months
825
household & minor work granted, 2025
92.9%
Cambridge · work for tradesby filing month
Applications filed with Cambridge City Council that match at least one trade at high or medium confidence. Refused and withdrawn applications are left out. *October to 21 Oct 2026.
By trade

Planning leads in Cambridge, trade by trade.

Cambridge City Council took 1,700 planning applications in the 12 months to 21 Oct 2026. 825 of them (49%) mean work for at least one trade; the rest are adverts, trees, conditions and paperwork, and they never reach a list.

Of the main building trades, Cambridge's register favours windows & doors (330), roofing (281) and builders & bricklayers (280): one application usually means work for several trades, so these overlap.

The most active postcode districts are CB1 (242), CB4 (168) and CB2 (166).

About 109 trade-relevant applications a month over the last 5 full months, peaking in July 2026 with 146.

Applications that mean work, last 12 months

One application usually means work for several trades, so the rows overlap.

Where in Cambridge, by postcode district

  • CB1242
  • CB4168
  • CB2166
  • CB3139
  • CB569
  • CB221

Your trade in Cambridge

Off the register

The latest building work filed in Cambridge, address hidden.

As filed with the council, newest first, tagged with the trade whose list it lands on. Subscribers get the full site address and planning reference for every one.

  • 20 Oct 2026 CB3 Windows & doors Awaiting decision

    Replacement of existing conservatory with a glazed conservatory of similar form, erection of a detached outbuilding for use as a home gym, replacement of two existing…

    ●● ●●●●●●●● ●●●●, CB3
    Conservatory / orangery / porch / garden room · work due 1 to 4 months from the decision
  • 15 Oct 2026 CB1 Builders Awaiting decision

    Single storey flat roof infill extension with roof light to the front.

    ●● ●●●●●●●● ●●●●, CB1
    Single-storey extension · work due now to 3 months from the decision
  • 15 Oct 2026 CB1 Roofing Awaiting decision

    Part two storey and part single storey rear extension. Roof extension with rear dormers and 2 skylights to the front elevation. Erection of bin store and cycle shelter…

    ●● ●●●●●●●● ●●●●, CB1
    Loft conversion / dormer · work due now to 3 months from the decision
  • 14 Oct 2026 CB1 Roofing Awaiting decision

    Single storey rear extension, part first & second storey rear extension, plus pitched roof over existingflat roof

    ●● ●●●●●●●● ●●●●, CB1
    Single-storey extension · work due 2 to 4 months from the decision
  • 14 Oct 2026 CB4 Loft conversions Awaiting decision

    Single storey side infill and rear extension, replacement of the existing first-floor outrigger roof with a dual-pitched roof and rear loft dormer. Roof lights to the…

    ●● ●●●●●●●● ●●●●, CB4
    Loft conversion / dormer · work due now to 2 months from the decision
  • 8 Oct 2026 Landscaping & driveways Awaiting decision

    Deed of Variation under Section 106A of the Town & Country Planning Act 1990 (as amended) to modify: (a) Paragraph 1 of Schedule 9, Part 1, and (b) Paragraph 1 of…

    ●● ●●●●●●●● ●●●●, ●●●
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 3 Aug 2026 CB1 Kitchens Awaiting decision

    Enlargement of a doorway in a partition wall within the kitchen in rear single storey extension.

    ●● ●●●●●●●● ●●●●, CB1
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision
  • 23 Jul 2026 CB4 Kitchens Awaiting decision

    Removal of existing lean to roof and the erection of a single storey side extension to the kitchen to provide decant area and additional storage areas.

    ●● ●●●●●●●● ●●●●, CB4
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

Timing

The plans are public weeks before Cambridge decides.

A homeowner tells the council first. By the time they search for a firm, they’re already getting quotes. Your letter can land in the first week.

decided on time
92.1%
household & minor granted
92.9%
decisions in 2025
1,034

MHCLG planning statistics (PS2), Cambridge, 2025. “Household & minor” is the government’s “other” category, which holds householder applications: 696 granted of 749. Cambridge approval rates in full

  1. Day 0Plans filed with Cambridge City Council

    The drawings go on the public register. That’s when we read them.

  2. Week 1Your letter lands

    Addressed to the Owner/Occupier, before the homeowner has rung anyone.

  3. About week 8The council decides

    The statutory target for household applications. Many take longer.

  4. ThenThey start ringing firms

    Your competitors meet them here. You wrote to them two months ago.

Patch check

Is your patch still yours to take?

Tell us what you do and where. We’ll run the last 90 days of the public register through the same rules your list uses and show you the demand for your trade sitting in it right now. No card, no trial, no obligation.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

The rules

Straight about what you get, and what you don’t.

Post only

Addresses for letters to “The Owner/Occupier”. No phone numbers, no names, no doorstep lists.

One firm per trade per patch

Exclusive cover means we won’t sell your councils or postcodes to another firm in your trade while you hold them. Checked before you pay.

A limit on letters per home

We limit how many PlanWatch letters one household gets in a month, across every trade. Exclusive cover is never held back by that limit.

Price

£149 a month. Cambridge, yours.

One trade, Cambridge or any patch you choose, billed monthly. No contract, no trial. If someone in your trade already holds Cambridge, we tell you before you pay.

  • An addressed list of every matching home in Cambridge, with the work filed and when your trade is needed
  • Your patch, your trade, nobody else: exclusive cover, checked before you pay
  • A CSV your printer or mailing house runs as it is
  • First list in 24 hours, then only the new homes every month. Never the same address twice
Demand RadarExclusive patch
£149a month · one trade · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Something we haven’t answered? Email business@planwatch.co.uk and a person will reply within one working day.

How many construction leads are there in Cambridge?

295 in the 90 days to 21 Oct 2026 and 825 in the 12 months to the same date: planning applications filed with Cambridge City Council that match at least one trade's rules at high or medium confidence. Refused and withdrawn applications are left out.

Which trades get the most work from planning applications in Cambridge?

Over the last 12 months: skip hire & waste (384), electricians (358), windows & doors (330), flooring (319), plastering & decorating (319) and tree surgery (319). Most applications mean work for more than one trade: an extension needs a builder, a roofer, windows, electrics and plastering.

Where in Cambridge is the most building work?

By postcode district, over the last 12 months: CB1 (242), CB4 (168), CB2 (166), CB3 (139) and CB5 (69).

How quickly does Cambridge City Council decide planning applications?

Cambridge City Council decided 92.1% of its applications within the statutory time limit in 2025, and granted 92.9% of its "other" decisions, the government category that holds householder applications (696 of 749, MHCLG PS2 figures). The target for a householder application is eight weeks, so a letter sent the week it is filed lands well before the decision.

Where does the data come from?

Cambridge City Council's own public planning register, read every day. We match each application against the trade rules your list uses, drop refused and withdrawn applications, and keep one line per household. We never sell names or phone numbers.

How do I get the addresses?

Pick your trade and claim your patch: £149 a month for one trade. Your first list arrives within 24 hours, then only new homes every month, as a CSV for letters to "The Owner/Occupier". One firm per trade per patch.

Cambridge filed 295 building applications in 90 days. Who wrote to them?

Check your patch in one field: no card, no sign-up. If it’s free in your trade, it’s yours for £149 a month.

PlanWatch for business · leads from the public UK planning register · postal outreach only, addressed to “The Owner/Occupier”. How it works