PlanWatch Demand Radar · for electricians

Electrician leads, straight off the planning register.

First fix is booked months before anyone searches for an electrician — and the date is on the public register. Every extension, loft, garage conversion, new kitchen and new dwelling needs a circuit run, a board looked at, and a certificate at the end. That work is handed to whoever the builder rings unless the homeowner already has your name. The application tells you which houses, and roughly when first fix falls.

17,634 matching applications hit the UK register in the last 30 days, from the 376 council registers we read daily — filtered down to just the councils or postcode areas you cover.

See what’s in your patch

Enter a full postcode to search a 5 km business radius, or name the councils or postcode districts you cover. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

Last 90 days

Where the work is

Applications matching our rules for electricians in our busiest councils, filed in the 90 days to 30 Oct 2026. Open a council for its numbers.

  1. Buckinghamshire763
  2. Cornwall668
  3. Enfield641
  4. Leeds597
  5. Barnet571
  6. Redbridge469
  7. Bradford453
  8. Bromley422
Why the register

Why the register beats every other lead source

  1. Builders sub the electrics to their regular, so you never see the job being formed.

  2. Emergency call-outs pay the bills but do not fill a diary three months ahead.

  3. Every quote portal sells the same job to five sparks at once.

An extension first-and-second fix is a multi-day job; a rewire or a new dwelling is a great deal more, and the certificate work repeats.

The matching table

Exactly what we match for electricians

This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.

TriggerExample from the registerDemand windowConfidenceWhy it matters to you
Loft conversion / dormer Loft conversion with rear dormer and 3 no. rooflights 1 – 4 months high new habitable rooms need a circuit, sockets, lighting and smoke detection
Kitchen extension / open-plan kitchen Single storey rear extension to form open plan kitchen diner 1 – 4 months high a kitchen is the most circuit-heavy room in the house
Two-storey / first-floor extension Two storey side extension and single storey rear extension 1 – 5 months high first fix across a whole new floor, plus the consumer unit
Single-storey extension Householder Planning Application - Single storey rear and side extension 1 – 4 months high first fix for the new room, plus the circuits it adds to the board
Garage conversion Garage conversion to habitable accommodation now – 3 months high a garage becoming a habitable room needs a proper circuit, sockets and lighting
New dwelling(s) / self-build Planning Application for the erection of a two storey dwelling with garage 4 – 10 months high a new dwelling is a full electrical installation and certification
Outbuilding / annexe / detached garage Householder Planning Application - Detached garage. 1 – 5 months medium most annexes and garden buildings get a supply run to them — a bare store does not, hence medium
Open-plan / knock-through kitchen (no extension named) Internal alterations to form open plan kitchen and living space 1 – 4 months high an open-plan kitchen is rewired for the new layout
Extension (storeys unspecified) Proposed rear extension and internal alterations 1 – 5 months medium an extension always needs first fix, though the scope is unknown here
Change of use to residential / HMO Change of use from office (Class E) to 4 no. residential flats 3 – 9 months medium a building changing to residential is rewired and certified per unit
Renovation / alterations (catch-all) Refurbishment and alterations to existing dwelling 1 – 6 months medium renovations and remodels are where a house gets rewired

First fix lands roughly 1–4 months after consent on extensions and conversions; new dwellings run later, 4–10 months. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →

How it works

  1. 1. Pick your patch

    The councils or postcode prefixes you cover — a town, a county, or several.

  2. 2. We scan the register

    Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.

  3. 3. You get a mailing list

    A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.

Off the register

Recent applications for electricians, address hidden.

As filed with the council, newest first. Subscribers get the full site address, the planning reference and the reason it matched, for every one.

FiledCouncilThe work, as filedWhy it matched
30 Oct 2026 Buckinghamshire RG9 Householder application for single storey side extension and two storey rear extension with alterations Two-storey / first-floor extensionwork due 1 to 5 months from the decision
30 Oct 2026 Cornwall PL18 Pre application advice for erection of a replacement dwelling. New dwelling(s) / self-buildwork due 4 to 10 months from the decision
30 Oct 2026 Barnet N3 Conversion of the existing dwelling into 3no. self-contained flats including single storey side and rear extensions, first floor side extension following demolition of… Loft conversion / dormerwork due 1 to 4 months from the decision
30 Oct 2026 Redbridge E11 Loft conversion with a rear dormer. Two front roof light. New window to gable end. (Summary). Loft conversion / dormerwork due 1 to 4 months from the decision
30 Oct 2026 Bradford BD7 Front and rear dormer windows Loft conversion / dormerwork due 1 to 4 months from the decision
30 Oct 2026 Shropshire DY14 Demolition of a single storey timber framed building and construction of a new two storey extension Two-storey / first-floor extensionwork due 1 to 5 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

The rules (non-negotiable)

Postal outreach only. Mail only — no email, no SMS, no cold calls. Each letter should cite the planning reference and carry an opt-out address. The data is from the public planning register; we store no applicant names and address letters to "The Owner/Occupier".

Price

Start your subscription

Exclusive cover available: one domestic electrical work subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.

£149/month · electricians · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Won't the builder already have an electrician?

Often, yes — which is exactly why the letter goes to the homeowner rather than the builder, and why it goes out while the job is still on paper. On a domestic project the homeowner is frequently the one appointing the trades, and on the ones where they are not, your name is at least in the folder they hand over.

Demand Radar or the Business plan — which one do I need?

Same price, different product. Demand Radar posts you an addressed mailing list every month for one trade in your patch, with exclusive cover: it is for firms that write to homes. The Business plan is alerts, keyword rules, a dashboard and an API across any councils you name, with no addresses: it is for firms that want to know within hours of something reaching the register and contact people their own way. If you want letters through doors, Radar. If you want a feed, Business.

Where does the data come from?

Published planning applications from the UK planning register — planning.data.gov.uk plus direct council sources, covering 378 local authorities. That register is public information. What you pay for is the trade-trigger matching, the demand-window timing, the deduplication and the suppression, not the raw fact of the applications.

How far back does the first list go?

There is no fixed cut-off date. We look back across the register and keep only the applications whose buying window for your trade is still upcoming, open or closing. In practice that means most of a first list is the last six months of live projects, plus a tail of larger builds from further back that are only now reaching your stage. Anything finished or already past its window is dropped, and each household appears once and is never sent to you twice — as is anything refused or withdrawn, unless your trade is architects and planning consultants, where a stalled application is the whole point. Whether that first list comes out bigger or smaller than the 90-day figure on the patch checker depends on how long your trade's buying window is, and it goes both ways. A long-window trade — glazing, kitchens, flooring — gets a much bigger first list, because consents from six or twelve months back are only now reaching its stage. A fast-window trade like skip hire or demolition gets a smaller one, because a nought-to-three-month window has already closed on a good share of what the checker counted. Either way later months are smaller than the first: they carry new applications only.

Why postal outreach only? Can I get phone numbers?

No, and that is deliberate. The register is published for planning transparency, not to build a calling list. We store no applicant names, so there is nothing to phone: letters are addressed to "The Owner/Occupier" at the property. Mail only — no email, no SMS, no cold calls — and every letter should cite the planning reference and carry an opt-out address. Firms that want a dialler list are not a fit for this product.

How many other PlanWatch letters will the same household get?

One planning application can be work for several trades, so we limit how many of our subscribers can post the same household in the same month. A shared-cover subscriber may see a few addresses held back until the next month, and the dashboard and batch email say how many. Exclusive cover is never held back by that limit: an exclusive subscriber always gets every address in their patch.

How does exclusivity work?

One subscriber per trade, per patch. The check runs before you pay: if another firm in your trade already holds those councils or postcode areas, we tell you at signup and take no money. Exclusivity is scoped to your trade only — a roofer and a window company can both hold the same town without clashing.

Can I cancel?

Yes. Billing is monthly and you can cancel at any time; cover runs to the end of the month you have paid for, then the patch is released for someone else. There is no minimum term and no contract to exit.

What happens when I sign up today?

You go straight to secure checkout, and your first list is generated within 24 hours of activation rather than a month later. That first list is not a snapshot of the last few weeks: it carries every live application in your patch whose buying window for your trade is still upcoming, open or closing, which in practice is most of the last six months plus some larger builds from further back that are only now reaching your stage. Finished jobs are dropped and each address appears once. Refused and withdrawn applications are dropped too for every building trade — with one deliberate exception: on the architects and planning consultants list they ARE the list, because a refusal is the moment a household discovers it needs drawings. After that a fresh list arrives every month covering new applications only, so it will be smaller than the first. If your patch turns out to be thinner than you expected in that first month, tell us and we will sort it out.

By council

Electrician leads by council, and every other trade.

Other trades we cover

Read firstIs it legal to write to homeowners about planning applications?

How to actually work these leads

A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →

PlanWatch Demand Radar · leads sourced from the public UK planning register · postal outreach only. All trades · The guide