Demand Radar Dashboard
£149 / month
You handle the mailing. Download your address list and send it to your printer, or post your own letters.
Choose dashboardHomeowners who will need new windows and doors — months before they search for you. Every extension, loft conversion and garage conversion ends with a glazing package. Explicit window-replacement applications name the job itself. We post you the addresses while the shortlist is still empty.
17,142 matching applications hit the UK register in the last 30 days, from the 376 council registers we read daily — filtered down to just the councils or postcode areas you cover.
Enter a full postcode to search a 5 km business radius, or name the councils or postcode districts you cover. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.
Leave your details and we’ll be in touch today.
Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.
Applications matching our rules for window & door companies in our busiest councils, filed in the 90 days to 20 Nov 2026. Open a council for its numbers.
Portals sell the same enquiry to five of your competitors at once.
By the time a homeowner googles "windows near me", the builder has often nominated a supplier.
Canvassing streets blind wastes letters on homes with no project.
A typical replacement or new-glazing package runs £5,000–£25,000. One converted letter can cover a year of Radar.
This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.
| Trigger | Example from the register | Demand window | Confidence | Why it matters to you |
|---|---|---|---|---|
| Replacement windows / doors | Replacement of existing timber windows with UPVC double glazed units | now – 2 months | high | explicit fenestration work in the application itself |
| Loft conversion / dormer | Loft conversion with rear dormer and 3 no. rooflights | 2 – 5 months | high | rooflights and dormer glazing follow the structural work |
| Rooflights / skylights | Single storey rear extension with 2no. rooflights | 1 – 4 months | high | rooflights are a named glazing item in the application |
| Kitchen extension / open-plan kitchen | Single storey rear extension to form open plan kitchen diner | 2 – 5 months | high | kitchen extensions are typically finished with bifolds/rooflights |
| Two-storey / first-floor extension | Two storey side extension and single storey rear extension | 4 – 7 months | high | glazing is ordered once the shell is weathertight |
| Single-storey extension | Householder Planning Application - Single storey rear and side extension | 3 – 6 months | high | bifolds/windows/doors go in once weathertight |
| Garage conversion | Garage conversion to habitable accommodation | 1 – 3 months | high | garage door is replaced with a window/infill unit |
| Conservatory / orangery / porch / garden room | Erection of a conservatory to rear | 1 – 4 months | high | the structure is mostly glazing |
| New dwelling(s) / self-build | Planning Application for the erection of a two storey dwelling with garage | 5 – 10 months | medium | glazing package late in a new-build programme |
| Outbuilding / annexe / detached garage | Householder Planning Application - Detached garage. | 2 – 5 months | medium | doors/glazing to finish |
| Extension (storeys unspecified) | Proposed rear extension and internal alterations | 3 – 6 months | medium | glazing follows, scale unknown |
| Change of use to residential / HMO | Change of use from office (Class E) to 4 no. residential flats | 3 – 9 months | low | conversions usually need fenestration work, but scope/timing vary widely |
| Renovation / alterations (catch-all) | Refurbishment and alterations to existing dwelling | 1 – 6 months | low | alterations often include fenestration — unconfirmed |
Fenestration applications are actionable immediately; extension glazing lands 3–6 months after consent. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →
The councils or postcode prefixes you cover — a town, a county, or several.
Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.
A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.
As filed with the council, newest first. Subscribers get the full site address, the planning reference and the reason it matched, for every one.
| Filed | Council | The work, as filed | Why it matched |
|---|---|---|---|
| 20 Nov 2026 | Buckinghamshire HP12 | Notification under The Town and Country Planning (General Permitted Development) Order 2015, Part 1 of Schedule 2 Class A for: single storey rear extension (depth… | Single-storey extensionwork due 3 to 6 months from the decision |
| 20 Nov 2026 | Barnet N20 | Alterations to roof involving increase in volume to existing rear dormers and installation of a roof lantern | Loft conversion / dormerwork due 2 to 5 months from the decision |
| 20 Nov 2026 | Redbridge IG8 | Installation of 6no. solar panels on flat roof of rear extenion and 9no solar panels on flat roof of rear dormer. (Summary). | Loft conversion / dormerwork due 2 to 5 months from the decision |
| 20 Nov 2026 | Bromley BR1 | Single storey rear extension. | Single-storey extensionwork due 3 to 6 months from the decision |
| 20 Nov 2026 | Bradford BD15 | Single storey side and rear extension , garage conversion. hip to gable conversion, raise in ridge height and dormer windows to front and rear | Loft conversion / dormerwork due 2 to 5 months from the decision |
| 20 Nov 2026 | Shropshire SY3 | Proposed conservatory. | Conservatory / orangery / porch / garden roomwork due 1 to 4 months from the decision |
Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.
Postal outreach only. Mail only — no email, no SMS, no cold calls. Each letter should cite the planning reference and carry an opt-out address. The data is from the public planning register; we store no applicant names and address letters to "The Owner/Occupier".
Both packages include your dashboard and a fresh monthly list of homes in your patch.
£149 / month
You handle the mailing. Download your address list and send it to your printer, or post your own letters.
Choose dashboard£215 / month
We design your card. Once you approve the proof, we print and post up to 50 cards a month to matching homes in your patch.
Request card distributionExclusive cover available: one window and door installation subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.
£149/month · window & door companies · your patch
Already a subscriber? Open your dashboard →
Questions before you sign up? Email business@planwatch.co.uk.
The triggers are tuned to householder work — extensions, conversions, replacements. Large multi-dwelling schemes are deliberately demoted because they buy through national supply chains.
Yes. Demand Radar Done for You costs £215 a month, including the £149 dashboard. Give us your branding and contact details and we design a card for you to approve. Printing and UK postage are included for up to 50 matching homes a month. If fewer homes qualify, we send fewer cards. We check your patch and agree the first mailing with you before taking payment.
Demand Radar Dashboard and Business both cost £149 a month. Demand Radar Dashboard supplies an addressed mailing list every month for one trade in your patch, with exclusive cover: it is for firms that write to homes. The Business plan is alerts, keyword rules, a dashboard and an API across any councils you name, with no addresses: it is for firms that want to know within hours of something reaching the register and contact people their own way. If you want letters through doors, Radar. If you want a feed, Business.
Published planning applications from the UK planning register — planning.data.gov.uk plus direct council sources, covering 378 local authorities. That register is public information. What you pay for is the trade-trigger matching, the demand-window timing, the deduplication and the suppression, not the raw fact of the applications.
There is no fixed cut-off date. We look back across the register and keep only the applications whose buying window for your trade is still upcoming, open or closing. In practice that means most of a first list is the last six months of live projects, plus a tail of larger builds from further back that are only now reaching your stage. Anything finished or already past its window is dropped, and each household appears once and is never sent to you twice — as is anything refused or withdrawn, unless your trade is architects and planning consultants, where a stalled application is the whole point. Whether that first list comes out bigger or smaller than the 90-day figure on the patch checker depends on how long your trade's buying window is, and it goes both ways. A long-window trade — glazing, kitchens, flooring — gets a much bigger first list, because consents from six or twelve months back are only now reaching its stage. A fast-window trade like skip hire or demolition gets a smaller one, because a nought-to-three-month window has already closed on a good share of what the checker counted. Either way later months are smaller than the first: they carry new applications only.
No, and that is deliberate. The register is published for planning transparency, not to build a calling list. We store no applicant names, so there is nothing to phone: letters are addressed to "The Owner/Occupier" at the property. Mail only — no email, no SMS, no cold calls — and every letter should cite the planning reference and carry an opt-out address. Firms that want a dialler list are not a fit for this product.
One planning application can be work for several trades, so we limit how many of our subscribers can post the same household in the same month. A shared-cover subscriber may see a few addresses held back until the next month, and the dashboard and batch email say how many. Exclusive cover is never held back by that limit: an exclusive subscriber always gets every address in their patch.
One subscriber per trade, per patch. The check runs before you pay: if another firm in your trade already holds those councils or postcode areas, we tell you at signup and take no money. Exclusivity is scoped to your trade only — a roofer and a window company can both hold the same town without clashing.
Yes. Billing is monthly and you can cancel at any time; cover runs to the end of the month you have paid for, then the patch is released for someone else. There is no minimum term and no contract to exit.
You go straight to secure checkout, and your first list is generated within 24 hours of activation rather than a month later. That first list is not a snapshot of the last few weeks: it carries every live application in your patch whose buying window for your trade is still upcoming, open or closing, which in practice is most of the last six months plus some larger builds from further back that are only now reaching your stage. Finished jobs are dropped and each address appears once. Refused and withdrawn applications are dropped too for every building trade — with one deliberate exception: on the architects and planning consultants list they ARE the list, because a refusal is the moment a household discovers it needs drawings. After that a fresh list arrives every month covering new applications only, so it will be smaller than the first. If your patch turns out to be thinner than you expected in that first month, tell us and we will sort it out.
Read firstIs it legal to write to homeowners about planning applications?
A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →
PlanWatch Demand Radar · leads sourced from the public UK planning register · postal outreach only. All trades · The guide