Construction leads · Manchester

Construction leads in Manchester: 320+ new in 90 days.

325 applications filed with Manchester council in the 90 days to 16 Nov 2026 mean work for at least one trade: extensions, lofts, new windows, roofs, driveways. Pick your trade below, see your numbers, and get the addresses posted to you every month.

filed in the 90 days to 16 Nov 2026
325
in the last 12 months
1,068
household & minor work granted, 2025
89.9%
Manchester · work for tradesby filing month
Applications filed with Manchester council that match at least one trade at high or medium confidence. Refused and withdrawn applications are left out. *November to 16 Nov 2026.
By trade

Planning leads in Manchester, trade by trade.

Manchester council took 2,495 planning applications in the 12 months to 16 Nov 2026. 1,068 of them (43%) mean work for at least one trade; the rest are adverts, trees, conditions and paperwork, and they never reach a list.

Of the main building trades, Manchester's register favours windows & doors (584), roofing (549) and builders & bricklayers (526): one application usually means work for several trades, so these overlap.

The most active postcode districts are M20 (207), M21 (122) and M14 (85).

About 129 trade-relevant applications a month over the last 5 full months, peaking in June 2026 with 174.

Applications that mean work, last 12 months

One application usually means work for several trades, so the rows overlap.

Where in Manchester, by postcode district

  • M20207
  • M21122
  • M1485
  • M2264
  • M1657
  • M1953
  • M850
  • M4049

Your trade in Manchester

Off the register

The latest building work filed in Manchester, address hidden.

As filed with the council, newest first, tagged with the trade whose list it lands on. Subscribers get the full site address and planning reference for every one.

  • 11 Nov 2026 M21 Builders Awaiting decision

    Erection of front porch and single-storey side and rear extension.

    ●● ●●●●●●●● ●●●●, M21
    Single-storey extension · work due now to 3 months from the decision
  • 11 Nov 2026 Landscaping & driveways Awaiting decision

    Temporary permission for the erection of five padel tennis courts (class F2(c)) and a one-storey ancillary administrative/storage building (class Sui Generis), with…

    ●● ●●●●●●●● ●●●●, ●●●
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 11 Nov 2026 M20 Roofing Awaiting decision

    Installation of permanent roof access and safety measures comprising a mansafe system, edge protection/guardrail system and designated maintenance walkways; installation…

    ●● ●●●●●●●● ●●●●, M20
    Re-roof / roof replacement · work due now to 2 months from the decision
  • 10 Nov 2026 M20 Loft conversions Awaiting decision

    Erection of single-storey rear extension, first floor extension to the rear and side and two storey extension to the side and rear dormer.

    ●● ●●●●●●●● ●●●●, M20
    Loft conversion / dormer · work due now to 2 months from the decision
  • 10 Nov 2026 M18 Landscaping & driveways Awaiting decision

    Change of use of vacant land to a burial ground/cemetery, including associated landscaping and access paths.

    ●● ●●●●●●●● ●●●●, M18
    Landscaping / driveway / external works · work due now to 3 months from the decision
  • 3 Nov 2026 M16 Loft conversions Awaiting decision

    Erection of single-storey rear extension and installation of rear dormer.

    ●● ●●●●●●●● ●●●●, M16
    Loft conversion / dormer · work due now to 2 months from the decision
  • 7 Sep 2026 M18 Kitchens Awaiting decision

    Extension to provide additional dining space.

    ●● ●●●●●●●● ●●●●, M18
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision
  • 26 Jun 2026 M14 Kitchens

    Two single storey extensions to side and rear of dwellinghouse to form dining room and covered area.

    ●● ●●●●●●●● ●●●●, M14
    Kitchen extension / open-plan kitchen · work due 1 to 4 months from the decision

Descriptions are the applicant’s own words from the public register. We leave out any row that names a person or carries a house number.

Timing

The plans are public weeks before Manchester decides.

A homeowner tells the council first. By the time they search for a firm, they’re already getting quotes. Your letter can land in the first week.

decided in time, incl. agreed extensions
93%
household & minor granted
89.9%
decisions in 2025
1,813

MHCLG planning statistics (PS2), Manchester, 2025. “Household & minor” is the government’s “other” category, which holds householder applications: 1,032 granted of 1,148. Manchester approval rates in full

  1. Day 0Plans filed with Manchester council

    The drawings go on the public register. That’s when we read them.

  2. Week 1Your letter lands

    Addressed to the Owner/Occupier, before the homeowner has rung anyone.

  3. About week 8The council decides

    The statutory target for household applications. Many take longer.

  4. ThenThey start ringing firms

    Your competitors meet them here. You wrote to them two months ago.

Patch check

Is your patch still yours to take?

Tell us what you do and where. We’ll run the last 90 days of the public register through the same rules your list uses and show you the demand for your trade sitting in it right now. No card, no trial, no obligation.

Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.

The rules

Straight about what you get, and what you don’t.

Post only

Addresses for letters to “The Owner/Occupier”. No phone numbers, no names, no doorstep lists.

One firm per trade per patch

Exclusive cover means we won’t sell your councils or postcodes to another firm in your trade while you hold them. Checked before you pay.

A limit on letters per home

We limit how many PlanWatch letters one household gets in a month, across every trade. Exclusive cover is never held back by that limit.

Price

£149 a month. Manchester, yours.

One trade, Manchester or any patch you choose, billed monthly. No contract, no trial. If someone in your trade already holds Manchester, we tell you before you pay.

  • An addressed list of every matching home in Manchester, with the work filed and when your trade is needed
  • Your patch, your trade, nobody else: exclusive cover, checked before you pay
  • A CSV your printer or mailing house runs as it is
  • First list in 24 hours, then only the new homes every month. Never the same address twice
Demand RadarExclusive patch
£149a month · one trade · your patch

Questions before you sign up? Email business@planwatch.co.uk.

Questions

Straight answers

Something we haven’t answered? Email business@planwatch.co.uk and a person will reply within one working day.

How many construction leads are there in Manchester?

325 in the 90 days to 16 Nov 2026 and 1,068 in the 12 months to the same date: planning applications filed with Manchester council that match at least one trade's rules at high or medium confidence. Refused and withdrawn applications are left out.

Which trades get the most work from planning applications in Manchester?

Over the last 12 months: skip hire & waste (696), electricians (684), flooring (612), plastering & decorating (612), windows & doors (584) and roofing (549). Most applications mean work for more than one trade: an extension needs a builder, a roofer, windows, electrics and plastering.

Where in Manchester is the most building work?

By postcode district, over the last 12 months: M20 (207), M21 (122), M14 (85), M22 (64) and M16 (57).

How quickly does Manchester council decide planning applications?

Manchester council decided 93% of its applications within the statutory period or an agreed extension of time in 2025, and granted 89.9% of its "other" decisions, the government category that holds householder applications (1,032 of 1,148, MHCLG PS2 figures). The target for a householder application is eight weeks, so a letter sent the week it is filed lands well before the decision.

Where does the data come from?

Manchester council's own public planning register, read every day. We match each application against the trade rules your list uses, drop refused and withdrawn applications, and keep one line per household. We never sell names or phone numbers.

How do I get the addresses?

Pick your trade and claim your patch: £149 a month for one trade. Your first list arrives within 24 hours, then only new homes every month, as a CSV for letters to "The Owner/Occupier". One firm per trade per patch.

Manchester filed 325 building applications in 90 days. Who wrote to them?

Check your patch in one field: no card, no sign-up. If it’s free in your trade, it’s yours for £149 a month.

PlanWatch for business · leads from the public UK planning register · postal outreach only, addressed to “The Owner/Occupier”. How it works