Planning Applications in
Melton
Melton is part of the East Midlands region. Search any postcode in Melton to see recent planning applications near you — including extensions, new builds, demolitions, and change of use applications.
Search Melton Planning Applications
Search any Melton postcode above, then save it to a free PlanWatch account so it is ready next time. Paid plans add instant email alerts for new applications near a saved postcode.
Planning Application Types in Melton
Based on 302 applications tracked between 2025-08-20 and 2026-08-28.
Full
39% of all applications
Tree Works
24% of all applications
Householder
17% of all applications
Conditions
9% of all applications
Change of Use
5% of all applications
Non-Material Amendment
3% of all applications
Melton Planning Statistics
Data period: 2025-08-20 to 2026-08-28 · Updated 2 September 2026
What PlanWatch Is Tracking in Melton
PlanWatch currently holds 302 Melton planning records across 178 unique postcode locations, with tracked application dates from 2025-08-20 to 2026-08-28. The most common categories in this dataset are Full (117), Tree Works (73), Householder (51).
Use this page to start with a postcode search, then open the official council record for the decision notice, drawings, consultation deadline and any later conditions. That matters because a short application description rarely shows the details neighbours and buyers care about: side windows, roof forms, access, drainage, tree works, opening hours or amended plans.
Recent Planning Applications in Melton
Latest applications submitted to Melton council.
Single storey rear extension.
The Chestnuts 46 Middle Lane Nether Broughton Leicestershire LE14 3HD
Large willow tree, needs a tidy up, one large overhanging branch removed and dead wood removed
8A Penn Lane Stathern Leicestershire LE14 4JA
Single storey rear extension projecting 5m from the rear elevation of the original dwelling
7 Granby Drive Bottesford Leicestershire NG13 0BT
T1 Beech tree Reduce to a height of no more than 11metres from ground level, the reduction will be only secondary limbs and to suitable growth points. Raise the crown to a height of 5metres from ground level all the way round the tree to reduce overshadowing a number of gardens.
20 Firwood Road Melton Mowbray Leicestershire LE13 1SA
T1 Conifer Reduce height to no less than 7metre from ground level and pul the sides in by 1.5metres and shape. T2 Pine Reduce in height to no less than 8metre from ground level and pull sides back from house by 2metres all the way round. T3 Reduce sycamore tree in rear garden to no less than 9metres from ground level. All work will be too BS3998 2010 and done by qualified and experienced tree surgeons.
The Cottage 3 The Green Stonesby Leicestershire LE14 4QE
Official Planning Portal
View and search planning applications directly on the Melton council website.
Visit Melton planning portal →Objecting to a Planning Application in Melton
Melton Council can only weigh objections that raise a material planning consideration. Personal disputes, loss of a view and property value are not material and are set aside. These are the grounds that do count, with what Melton's planning officers will expect you to evidence for each.
Then write the objection letter, or check what counts as a material consideration before you start. Objections normally have to reach Melton Council inside the 21-day consultation window.
Frequently Asked Questions — Melton Planning
How do I check planning applications in Melton?
How do I object to a planning application in Melton?
How long does planning permission take in Melton?
Can I get alerts for new planning applications in Melton?
What planning applications don't need permission in Melton?
Can planning applications affect my property value in Melton?
Save a Melton postcode to your free PlanWatch account
Free accounts save one postcode in Melton so it is ready whenever you want to check what has been applied for nearby. Paid plans add instant email alerts for new applications near a saved postcode.
Free: search plus one saved postcode. We never sell your details, and you can remove your postcode at any time.
Read the planning guides →Nearby Councils in East Midlands
Explore planning applications in other East Midlands councils.
Planning Guides for Melton Residents
Do I Need Planning Permission For...?
Specialist Topics
Common Planning Situations
Data Sources
- Planning application data: planning.data.gov.uk
- Melton council planning portal — pa.melton.gov.uk
- Planning Inspectorate (PINS) appeal decisions
- Data last refreshed: 2 September 2026
For local trades
The biggest jobs in Melton are announced weeks before anyone is hired
A conservatory, an extension, a re-roof — it starts life on this page as a planning application, weeks before the homeowner picks a firm. PlanWatch reads every application and turns them into a monthly, addressed lead list for exactly one firm per trade per area.
£149/month · exclusive per trade, per area · delivered as an addressed mailing list, refreshed monthly