Tameside Planning Approval Rate 87% (2026) | PlanWatch
Planning Approval Rates · North West

Planning Approval Rate in Tameside

Tameside is close to the England average for planning permission: it approves 87% of applications and decides 96.1% of them within the statutory time limit, ranking #185 of 310 English authorities. This page sets out how hard it is to get planning permission in Tameside, how quickly the council decides, and how it compares with its neighbours — from official government figures plus the live planning activity PlanWatch tracks across Tameside Metropolitan Borough Council.

87%
approved
13%
refused
96.1%
decided in time
#185
of 310 in England

Source: official MHCLG planning statistics (PS2), 1 January 2025 to 31 December 2025. Based on 569 decisions (495 granted, 74 refused).

How Tameside compares

Tameside87%
North West average88.3%
England average87%

Tameside is about average for England.

How hard is it to get planning permission in Tameside?

Tameside is a little stricter than the median English authority, granting 87% of the applications it decides (rank 185th of 310). That puts it close to the England average — 87% approved against an England average of 87%. Within North West it is the 20th most approving of 35 local planning authorities, where the regional average is 88.3%. Refusals are fairly frequent here: 74 of its 569 decisions were refusals (13%). On the split by scale it is about as likely to approve major schemes as small ones: 90.5% of major developments approved versus 89% of householder and other small-scale work, from 21 major decisions.

On timing it is a little faster than average, deciding 96.1% of applications within the statutory period against 90.6% nationally. Its figures rest on a mid-sized caseload of 569 decisions over 1 January 2025 to 31 December 2025, where the typical English authority decides around 783. Among its North West neighbours it sits between Manchester (87.2%, more approving) and Cheshire East (86.9%, stricter). For context in North West, Cumberland approves the most (96.8%) and Warrington the least (76.2%).

Compare Tameside with nearby councils

Cheshire East 86.9% approved Manchester 87.2% approved Wirral 86.9% approved

Approval rates for other authorities in North West. See the full North West league table.

Approval rate by development scale in Tameside

ScaleApproval rateDecisions
Major90.5%21
Minor82%167
Other (incl. householder)89%381

Live planning activity in Tameside Metropolitan Borough Council

From the latest planning data PlanWatch holds (to 4 September 2026). These are the records we've collected — the freshness the annual government table lacks.

679
applications tracked
272
in the most recent 90 days of data

What people apply for in Tameside Metropolitan Borough Council

Householder
190
Full
187
Conditions
98
Change of Use
59
Demolition
49
Tree Works
43
Prior Approval
17
Non-Material Amendment
13

Where planning activity concentrates in Tameside Metropolitan Borough Council

SK14162 M34140 OL699 SK1577 M4353 OL752

Recent applications in Tameside Metropolitan Borough Council

Proposed Single Storey Rear Extension and Rear Dormer Loft Conversion
25 Blue Bell Close Hyde Tameside SK14 4HU · Awaiting decision · 4 September 2026 · view official record
Single storey rear extension. The length of the extension from the rear of the original house 4.00m. Maximum height of the extension 4.00m. …
13 Windermere Road Hyde Tameside SK14 4PU · Decided · 4 September 2026 · view official record
Tree Works
Tameside General Hospital Fountain Street Ashton-under-lyne Tameside OL6 9RW · Awaiting decision · 3 September 2026 · view official record
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation ou…
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP · Awaiting decision · 3 September 2026 · view official record
Full discharge of Condition 3 (Storage and Collection of Refuse) of planning reference 26/00088/FUL
345 Oldham Road Ashton-under-lyne Tameside OL7 9NE · Awaiting decision · 3 September 2026 · view official record
Single storey detached outbuilding
74 Thompson Road Denton Tameside M34 2PN · Awaiting decision · 3 September 2026 · view official record

Track live decisions near a postcode on the PlanWatch Tameside page.

Embed this stat

Planning approval rate
Tameside
87%
approved
(495 of 569)
96.1%
decided in time
#185
of 310 in England
Source: PlanWatch / MHCLG PS2 statistics · planwatch.co.uk

Free to embed on your site with a credit link to PlanWatch:

Planning permission in Tameside: common questions

Is it hard to get planning permission in Tameside?

On the latest official figures Tameside is close to the England average and a little stricter than the median English authority, approving 87% of the 569 applications it decided over 1 January 2025 to 31 December 2025 against 87% for England.

What percentage of planning applications does Tameside approve or refuse?

Refusals are fairly frequent here: 87% approved and 13% refused — 495 granted and 74 refused of 569 decisions, with major schemes approved at 90.5% and householder and other work at 89%.

How quickly does Tameside decide planning applications?

On timing Tameside is a little faster than average: 96.1% of applications were decided within the statutory period — eight weeks for most, thirteen for major schemes — against 90.6% nationally.

Is Tameside stricter than nearby councils?

Tameside's 87% approval rate makes it the 20th most approving of 35 authorities in North West, against a 88.3% regional average. Neighbouring Manchester approves 87.2% and Cheshire East 86.9%.

Can I use Tameside's approval rate to predict whether my application will be approved?

No — the approval rate is a historic average across every application Tameside decided, not a prediction for any individual application; your outcome depends on the site, the proposal, local planning policy and any objections.

Methodology & limits

Approval, refusal and in-time rates come from the government's official PS2 planning application statistics (Ministry of Housing, Communities & Local Government), covering 1 January 2025 to 31 December 2025. This dataset is England-only and published annually, so it lags live activity. Live figures are the applications PlanWatch has collected for Tameside Metropolitan Borough Council and are not a complete council register. Refusal reasons and delegated-vs-committee splits are not published in this data.

This is a historic average, not a prediction. It cannot tell you whether your application will be approved — that depends on your site, proposal, local policy and any objections.

Download the data (JSON) · CSV · National league table · North West league table

Track live decisions in Tameside

Set a free alert and get emailed when a planning application near you is decided.

notifications_active See planning in Tameside

Related: tree surveys in Tameside · all applications