Planning Approval Rates · North West

Planning Approval Rate in Wirral

Wirral is close to the England average for planning permission: it approves 86.9% of applications and decides 93.9% of them within the statutory period or an agreed extension of time, ranking #188 of 310 English authorities. This is the approval-rate record for Wirral: how hard it is to get planning permission, how quickly the council decides, and how it compares with its neighbours, from official government statistics.

Looking for a particular application rather than the statistics? Search Wirral planning applications by postcode on PlanWatch.

Wirral1 January 2025 to 31 December 2025
86.9%

810 of 932 decisions approved

86.9%
approved
13.1%
refused
93.9%
decided in time, incl. agreed extensions
#188
of 310 in England

Source: official MHCLG planning statistics (PS2), 1 January 2025 to 31 December 2025. Based on 932 decisions (810 granted, 122 refused).

How Wirral compares

Wirral86.9%
North West average88.3%
England average87%

Wirral is about average for England.

Approval rate by development scale in Wirral

ScaleApproval rateDecisions
Major95%20
Minor77.6%170
Other (incl. householder)88.8%742

How hard is it to get planning permission in Wirral?

Wirral is a little stricter than the median English authority, granting 86.9% of the applications it decides (rank 188th of 310). That puts it close to the England average — 86.9% approved against an England average of 87%. Within North West it is the 22nd most approving of 35 local planning authorities, where the regional average is 88.3%. Refusals are fairly frequent here: 122 of its 932 decisions were refusals (13.1%). On the split by scale it is somewhat more lenient on major schemes than on small ones: 95% of major developments approved versus 88.8% of householder and other small-scale work, from 20 major decisions.

On timing it is a little faster than average, deciding 93.9% of applications within the statutory period or an agreed extension of time against 90.6% nationally. Its figures rest on a mid-sized caseload of 932 decisions over 1 January 2025 to 31 December 2025, where the typical English authority decides around 783. Among its North West neighbours it sits between Cheshire East (86.9%, more approving) and Wigan (86.8%, stricter). For context in North West, Cumberland approves the most (96.8%) and Warrington the least (76.2%).

Compare Wirral with nearby councils

Approval rates for other authorities in North West. See the full North West league table.

Live data

Live planning activity in Wirral Metropolitan Borough Council

From the latest planning data PlanWatch holds (to 23 November 2026). These are the records we've collected — the freshness the annual government table lacks.

761
applications tracked
315
in the most recent 90 days of data

Where planning activity concentrates in Wirral Metropolitan Borough Council

CH6278 CH4876 CH6070 CH6367 CH4163 CH4354

What people apply for in Wirral Metropolitan Borough Council

Full291
Householder279
Change of Use59
Conditions43
Advertisement34
Tree Works18
Non-Material Amendment10
Outline10

Recent applications in Wirral Metropolitan Borough Council

  • TEST

    Birkenhead Town Hall, Wirral, CH41 1ND · Registered · view official record

  • ERECTION OF TWO STOREY SIDE EXTENSION, TWO STOREY REAR EXTENSION WITH TERRACE, RAISED PATIO TO REAR, SINGLE STOREY DETACHED POOLHOUSE TO SID…

    10 Abbey Road, West Kirby, Wirral, CH48 7EW · Registered · view official record

  • Demolition of existing detached garage and erection of 1.5 storey side extension, attached garage to alternate side and proposed front porch…

    35 Pipers Lane, Heswall, Wirral, CH60 9HZ · Registered · view official record

  • Proposed single storey flat roof rear extension

    9 Hilton Grove, West Kirby, Wirral, CH48 5HB · Registered · view official record

  • Rear dormer roof extensions to first floor and loft, to accommodate a new bathroom and additional Bedroom.

    14 Palm Hill, Oxton, Prenton, Wirral, CH43 5SP · Registered · view official record

  • Full Planning & Listed Building Consent for conversion of Grade 2* former Place of Worship (St George’s URC) (Class F1) into 3 no. residenti…

    ST GEORGES CHURCH St Georges Way, Thornton Hough, Wirral, CH63 1JJ · Registered · view official record

This is a sample, not the full register. Search Wirral planning applications by postcode.

For your site

Embed this stat

Planning approval rate
Wirral
86.9%
approved
(810 of 932)
93.9%
in time, incl. extensions
#188
of 310 in England
Source: PlanWatch / MHCLG PS2 statistics · planwatch.co.uk

Free to embed on your site with a credit link to PlanWatch:

FAQ

Planning permission in Wirral: common questions

Is it hard to get planning permission in Wirral?

On the latest official figures Wirral is close to the England average and a little stricter than the median English authority, approving 86.9% of the 932 applications it decided over 1 January 2025 to 31 December 2025 against 87% for England.

What percentage of planning applications does Wirral approve or refuse?

Refusals are fairly frequent here: 86.9% approved and 13.1% refused — 810 granted and 122 refused of 932 decisions, with major schemes approved at 95% and householder and other work at 88.8%.

How quickly does Wirral decide planning applications?

On timing Wirral is a little faster than average: 93.9% of applications were decided within the statutory period (eight weeks for most, thirteen for major schemes) or an agreed extension of time, against 90.6% nationally.

Is Wirral stricter than nearby councils?

Wirral's 86.9% approval rate makes it the 22nd most approving of 35 authorities in North West, against a 88.3% regional average. Neighbouring Cheshire East approves 86.9% and Wigan 86.8%.

Can I use Wirral's approval rate to predict whether my application will be approved?

No — the approval rate is a historic average across every application Wirral decided, not a prediction for any individual application; your outcome depends on the site, the proposal, local planning policy and any objections.

Methodology & limits

Approval, refusal and in-time rates come from the government's official PS2 planning application statistics (Ministry of Housing, Communities & Local Government), covering 1 January 2025 to 31 December 2025. This dataset is England-only and published annually, so it lags live activity. The in-time rate counts decisions made within the statutory period or an agreed extension of time. Live figures are the applications PlanWatch has collected for Wirral Metropolitan Borough Council and are not a complete council register. Refusal reasons and delegated-vs-committee splits are not published in this data.

This is a historic average, not a prediction.

It cannot tell you whether your application will be approved — that depends on your site, proposal, local policy and any objections.

Track new planning applications in Wirral

Get emailed within hours when a new planning application near you reaches the register. Search free · alerts with a 7-day free trial.

Search Wirral planning applications by postcode

Related: Wirral planning applications