Loft conversions and re-roofs surface spray-foam problems — and the removal bill lands first.
Surveys for loft conversions and re-roofs are where legacy spray-foam gets discovered. The application tells you which roofs are about to be opened up.
205 matching applications hit the UK register in the last 30 days — filtered down to just the councils or postcode areas you cover.
Why the register beats every other lead source
Removals run £3,000–£12,000, and mortgage-driven urgency means fast decisions.
Exactly what we match for spray-foam removal specialists
This is the real matching table, not marketing. Every lead row you receive shows its trigger, demand window and confidence — and the reasoning is printed on the row so you can sanity-check every address before it's mailed.
| Trigger | Example from the register | Demand window | Confidence | Why it matters to you |
|---|---|---|---|---|
| Loft conversion / dormer | Loft conversion with rear dormer and 3 no. rooflights | now – 3 months | low | loft surveys frequently flag existing spray-foam insulation that must be removed first |
| Re-roof / roof replacement | Listed building consent to re-roof with natural slate | now – 2 months | medium | existing spray foam has to come off before or during a re-roof |
Actionable at survey stage — 0–3 months from the application appearing. Demand windows are measured from the expected decision date. Refused and withdrawn applications are dropped automatically. How the demand windows are built →
See what’s in your patch
Type the councils or postcode areas you actually work. We will run the last 90 days of the public register through the same trigger model your batches use and tell you how much matching demand is sitting in it right now.
Counts only. High and medium confidence matches, deduplicated to one line per application. The site addresses, planning references and per-row reasoning are what a subscription buys.
How it works
1. Pick your patch
The councils or postcode prefixes you cover — a town, a county, or several.2. We scan the register
Every month we cross live planning applications from 378 UK councils with the trigger model above and score the demand window.3. You get a mailing list
A deduped, mailing-house-ready CSV of "Owner/Occupier" addresses — one household, one letter, prior recipients suppressed automatically.Sample leads (anonymised)
| Trigger | Area | Property | Expected demand |
|---|---|---|---|
| Loft conversion / dormer | CO15 | A property near CO15 ●●● | now – 3 months |
| Re-roof / roof replacement | CO12 | A property near CO12 ●●● | now – 2 months |
Real batches show the full site address, planning reference, score and reasoning. Samples are illustrative.
The rules (non-negotiable)
Start your subscription
£149/month · spray-foam removal specialists · your patch
Exclusive cover available: one spray-foam insulation removal subscriber per patch — first come, first served. If your area is already taken, we'll tell you before you pay anything.
Other trades we cover
Window & door companies · Conservatory, orangery & garden room installers · Bricklayers & building contractors · Roofing contractors · Loft conversion companies · Kitchen companies · Landscapers & driveway contractors · Solar installers · Heat pump & heating engineers · Scaffolding firms · Skip hire & waste companies · Demolition & strip-out contractors · Tree surgeons & arborists
How to actually work these leads
A list is not a pipeline. What to send, when to send it, how many times to follow up and the compliance line we hold: how to turn planning applications into jobs →