Bracknell Forest Approval Rate 86.3% | PlanWatch
Planning Approval Rates · South East

Planning Approval Rate in Bracknell Forest

Bracknell Forest is close to the England average for planning permission: it approves 86.3% of applications and decides 89.7% of them within the statutory time limit, ranking #202 of 310 English authorities. This page sets out how hard it is to get planning permission in Bracknell Forest, how quickly the council decides, and how it compares with its neighbours — from official government figures plus the live planning activity PlanWatch tracks across Bracknell Forest.

86.3%
approved
13.7%
refused
89.7%
decided in time
#202
of 310 in England

Source: official MHCLG planning statistics (PS2), 1 January 2025 to 31 December 2025. Based on 524 decisions (452 granted, 72 refused).

How Bracknell Forest compares

Bracknell Forest86.3%
South East average87.2%
England average87%

Bracknell Forest is about average for England.

How hard is it to get planning permission in Bracknell Forest?

Bracknell Forest is a little stricter than the median English authority, granting 86.3% of the applications it decides (rank 202nd of 310). That puts it close to the England average — 86.3% approved against an England average of 87%. Within South East it is the 44th most approving of 65 local planning authorities, where the regional average is 87.2%. Refusals are fairly frequent here: 72 of its 524 decisions were refusals (13.7%). On the split by scale it is about as likely to approve major schemes as small ones: 87% of major developments approved versus 90% of householder and other small-scale work, from 23 major decisions.

On timing it is about average on speed, deciding 89.7% of applications within the statutory period against 90.6% nationally. Its figures rest on a mid-sized caseload of 524 decisions over 1 January 2025 to 31 December 2025, where the typical English authority decides around 783. Among its South East neighbours it sits between Milton Keynes (86.6%, more approving) and Arun (85.6%, stricter). For context in South East, Fareham approves the most (98%) and Windsor and Maidenhead the least (68.9%).

Compare Bracknell Forest with nearby councils

Arun 85.6% approved Milton Keynes 86.6% approved Epsom and Ewell 85.4% approved

Approval rates for other authorities in South East. See the full South East league table.

Approval rate by development scale in Bracknell Forest

ScaleApproval rateDecisions
Major87%23
Minor72.7%110
Other (incl. householder)90%391

Live planning activity in Bracknell Forest

From the latest planning data PlanWatch holds (to 3 September 2026). These are the records we've collected — the freshness the annual government table lacks.

623
applications tracked
249
in the most recent 90 days of data

What people apply for in Bracknell Forest

Tree Works
224
Conditions
162
Householder
104
Full
47
Lawful Development Certificate
34
Non-Material Amendment
20
Other / Unknown
15
Prior Approval
11

Where planning activity concentrates in Bracknell Forest

RG42151 RG12119 GU4797 SL572 RG4544 SL427

Recent applications in Bracknell Forest

Proposed two storey extension to the front of the existing house.
117 NUTHURST, BRACKNELL, RG12 0UP · Under Consultation · 3 September 2026 · view official record
One of the limbs of the Oak tree is overhanging into our neighbours garden and is lower the other limbs on the crown of the tree. I would li…
TAMBORA, LONG HILL ROAD, ASCOT, SL5 8RE · Under Consultation · 3 September 2026 · view official record
T1 Horse chestnut - located in the front garden. Tree dimensions: Height 15 m Radial spread 9 m. The proposed work - To reduce the low prima…
2 NEW ROAD, SANDHURST, GU47 8EF · Under Consultation · 3 September 2026 · view official record
T19 Lime. Re-pollard at previous points. Lapsed pollard and is shading whole front of house.
THE LIMES, RANELAGH DRIVE, BRACKNELL, RG12 9DA · Under Consultation · 3 September 2026 · view official record
Application for a Lawful Development Certificate for loft conversion with rooflights to front and side, additional side facing window and an…
23 KING EDWARDS ROAD, ASCOT, SL5 8PD · Valid · 2 September 2026 · view official record
Prior approval for siting and appearance of a new agricultural building on land at Grove Farm House
GROVE FARM, LOWER SANDHURST ROAD, SANDHURST, GU47 8JG · Valid · 1 September 2026 · view official record

Track live decisions near a postcode on the PlanWatch Bracknell Forest page.

Embed this stat

Planning approval rate
Bracknell Forest
86.3%
approved
(452 of 524)
89.7%
decided in time
#202
of 310 in England
Source: PlanWatch / MHCLG PS2 statistics · planwatch.co.uk

Free to embed on your site with a credit link to PlanWatch:

Planning permission in Bracknell Forest: common questions

Is it hard to get planning permission in Bracknell Forest?

On the latest official figures Bracknell Forest is close to the England average and a little stricter than the median English authority, approving 86.3% of the 524 applications it decided over 1 January 2025 to 31 December 2025 against 87% for England.

What percentage of planning applications does Bracknell Forest approve or refuse?

Refusals are fairly frequent here: 86.3% approved and 13.7% refused — 452 granted and 72 refused of 524 decisions, with major schemes approved at 87% and householder and other work at 90%.

How quickly does Bracknell Forest decide planning applications?

On timing Bracknell Forest is about average on speed: 89.7% of applications were decided within the statutory period — eight weeks for most, thirteen for major schemes — against 90.6% nationally.

Is Bracknell Forest stricter than nearby councils?

Bracknell Forest's 86.3% approval rate makes it the 44th most approving of 65 authorities in South East, against a 87.2% regional average. Neighbouring Milton Keynes approves 86.6% and Arun 85.6%.

Can I use Bracknell Forest's approval rate to predict whether my application will be approved?

No — the approval rate is a historic average across every application Bracknell Forest decided, not a prediction for any individual application; your outcome depends on the site, the proposal, local planning policy and any objections.

Methodology & limits

Approval, refusal and in-time rates come from the government's official PS2 planning application statistics (Ministry of Housing, Communities & Local Government), covering 1 January 2025 to 31 December 2025. This dataset is England-only and published annually, so it lags live activity. Live figures are the applications PlanWatch has collected for Bracknell Forest and are not a complete council register. Refusal reasons and delegated-vs-committee splits are not published in this data.

This is a historic average, not a prediction. It cannot tell you whether your application will be approved — that depends on your site, proposal, local policy and any objections.

Download the data (JSON) · CSV · National league table · South East league table

Track live decisions in Bracknell Forest

Set a free alert and get emailed when a planning application near you is decided.

notifications_active See planning in Bracknell Forest

Related: tree surveys in Bracknell Forest · all applications