On this page 7 sections
A typical 4.5kWp solar panel installation costs about £7,600 in Energy Saving Trust's current guide. Published supplier packages start around £5,000 for smaller panel-only systems, while larger installations with a battery can exceed £11,000. The useful comparison is the complete system for your roof, with every extra priced before you pay a deposit.
This guide is for comparing quotations and deciding what to buy. For roof, wall, balcony, plug-in and ground-mounted permission rules, use Do I Need Planning Permission for Solar Panels?. We checked the published prices below on 5 November 2026; they are not site quotations or a test of the suppliers' work.
How this page is funded. PlanWatch is independent and doesn't sell or install solar panels. This page may show an installer enquiry or links labelled Ad or Sponsored. If you use one, PlanWatch may receive a referral fee or commission at no extra cost to you. Payments do not determine the prices, comparisons or planning data on this page.
Published Solar Prices: Check The Equipment First
These examples describe different sizes and scopes. They show why the cheapest headline cannot tell you which quotation is better.
| Published source | System described | Price shown |
|---|---|---|
| E.ON Next | Six panels, 2.91kWp; hybrid inverter | From £4,995 |
| E.ON Next | Twelve panels, 5.82kWp; hybrid inverter | From £6,495 |
| Energy Saving Trust | Typical domestic installation, about 4.5kWp | About £7,600 |
| Octopus | Twelve panels with 10kWh smart battery | £11,115 |
Starting offers depend on the property and the supplier's terms. A hybrid inverter can make a system ready for a battery without including the battery itself. The table is a set of published examples, not a ranking or a range for identical installations.
Get A Quote You Can Compare Line By Line
Ask each installer to price the same roof layout, then use this checklist. An item marked “to be confirmed” is still an outstanding cost.
| Quote line | What to ask |
|---|---|
| Panels | Number, make, product warranty and total rated output in kWp |
| Inverter | Type, location, warranty and replacement arrangements |
| Battery, if wanted | Usable capacity in kWh, warranty, installation and any backup equipment |
| Access | Scaffolding, pavement licences where needed and removal |
| Roof | Fixings, weatherproofing, survey findings and who repairs defective covering |
| Electrics | Cable route, protective equipment, any consumer-unit changes and testing |
| Handover | Commissioning, certificates, grid paperwork, monitoring access and export-registration information |
| Price | VAT treatment, exclusions, deposit, staged payments and how variations are agreed |
Ask who takes responsibility for each part of the job. If the roof survey identifies repairs, obtain a price for those before assuming the installation can proceed on the original terms.
Compare Panels With And Without A Battery
Request two versions of the same panel layout. One should include the panels and inverter only; the other should identify the extra battery, equipment and work. Otherwise a lower battery-package price may simply buy fewer panels.
Check when the household uses electricity. Ask the installer to separate expected annual generation, electricity used at home, electricity exported and any electricity bought to charge the battery. A battery's capacity does not tell you how much money it saves, and storage does not automatically provide electricity during a power cut.
For a savings estimate, request the assumed roof direction, shading, electricity prices, export rate and household usage. Ask for the same estimate with a lower export rate and with less daytime use. That shows how much the result relies on assumptions rather than the equipment alone.
A Worked Budget: Find The Missing Costs
Suppose a quotation is £7,600, but a separate roof-repair quote is £1,000. The amount to fund is £8,600. If a battery option adds another £4,000, the total becomes £12,600.
The repair and battery figures are illustrative worksheet inputs, not national cost estimates. Replace them with written prices. Check whether the installer already includes the work before adding it again. A known roof repair belongs in the price; it should not disappear into a vague contingency.
HMRC's VAT guidance describes relief for qualifying installed energy-saving materials. Ask for the correct treatment on each quotation rather than applying one rate to equipment, roof repairs and every associated job.
Check The Roof And Permission Route Before The Deposit
For a house in England, many installations can use permitted-development rights, subject to the limits and conditions in Planning Portal's solar guidance. Check the actual mounting layout and any property restrictions. Listed homes and protected locations need particular attention. Rules elsewhere in the UK differ.
Our solar planning guide covers those rules in detail. This cost guide's job is to make sure the quotation identifies who checks permission, structural suitability, electrical compliance and any grid-connection requirements. They are separate questions, even when one installer coordinates them.
On a nearby application, open the drawings and decision notice. A solar array on a commercial roof or a ground-mounted scheme is not a direct precedent for your house. If nearby building work could shade the roof, compare its approved drawings with the installer's shading assumptions; see solar panels shadowed by a neighbour's loft.
What PlanWatch's recorded solar decisions show
Our read-only production extract on 5 November 2026 at 11:09 UTC covered applications received 1 January 2025 to 5 November 2026 inclusive. Among descriptions classified as solar, there were 518 approvals and 49 refusals: 91.4% of 567 known outcomes, across 152 councils. Lawful-development certificates were excluded from that percentage.
There were 5,631 matching planning applications in the window. The other 5,064 did not have a qualifying approval or refusal in the extract. We use a harvested decision where available and otherwise the recorded status; generic “Decided”, withdrawn and mixed outcomes are not approvals. Classification excludes identified prior approvals, condition discharges, amendments, tree and listed-building routes. Each application is assigned to the first matching project type, so mixed proposals may be grouped under another project.
This UK sample includes different solar schemes, rather than only domestic rooftops, and many installations need no application at all. It cannot predict your permission or demonstrate an installer's success. No council had 25 known solar outcomes in this sample, so we do not publish council-level percentages here. The receipt window is not a decision-date window.
Sources
Published costs, checked 5 November 2026: Energy Saving Trust solar panels, E.ON Next packages, Octopus installation packages. Supplier prices and terms can change; obtain a site quotation.
Official guidance: Planning Portal solar permission, HMRC VAT rates.
Approval data: PlanWatch's production planning records, extracted read-only on the date above using the project classifier and recorded decisions. Only approvals and refusals enter the percentage; lawful-development certificates are separate. Coverage is incomplete, descriptions can contain several works and repeat applications at one property remain separate records.
Frequently Asked Questions
How much do solar panels cost to install in 2026?
Energy Saving Trust gives about £7,600 for a typical 4.5kWp system. Smaller published packages start around £5,000, while larger battery packages can exceed £11,000. Compare the equipment and installation scope rather than treating those as identical systems.
What should a solar installation quote include?
Panels and rated output, inverter, any battery, access, roof fixings, cabling, electrical work, commissioning and handover documents. Get exclusions, VAT and payment stages in writing.
Is a battery included in the solar panel price?
Only when specified. Obtain prices with and without it on the same panel layout, and check usable capacity, warranty and any backup equipment.
Should I check planning before paying a solar deposit?
Yes. Confirm the actual roof layout and property restrictions, along with structural, electrical and grid requirements. A generic permitted-development statement does not check your property.
Going green? Get quotes from MCS-certified installers
We're onboarding accredited renewables installers now — leave your details and we'll match you locally.
Disclaimer: PlanWatch provides general information about UK planning processes. This content is not legal advice. Planning law is complex and varies by local authority. Consult a qualified planning consultant or solicitor for advice specific to your situation.