Right to light survey — how much should it cost?
Our neighbour's extension is going ahead and we're considering a right to light claim. We've had two quotes for a survey: £1,800 and £4,200…
Our neighbour's extension is going ahead and we're considering a right to light claim. We've had two quotes for a survey: £1,800 and £4,200…
Standard delay is 5-10 working days after validation. If it's been two weeks, chase them. Sometimes it's a technical glitch with the back-e…
Really helpful, thanks. I've asked both for breakdowns.
There's also the option of a Certificate of Existing Lawful Use (CELU) rather than a CLU, depending on how long the extension has been ther…