Permission in Principle (PiP): How It Works, Costs, Time Limits & Council Data

Permission in Principle in England costs £531 per 0.1 ha, has a 5-week decision target, and lasts 3 years (5 on brownfield registers). Full rules and data.

Benjamin Alexander Planning Researcher Updated · First published General information, not legal advice
Check your postcode Free search · Paid alerts within hours
RECEIVED
Application · drawn for this guide
On this page 8 sections
  1. 01What Permission in Principle is (and is not)
  2. 02Two routes to PiP — and strict exclusions
  3. 03Stage 1 (PiP) vs Stage 2 (TDC) vs Outline vs Full Planning Permission
  4. 04Costs, timelines, and how both stages work
  5. 05PiP decisions observed in PlanWatch
  6. 06Wales, Scotland, and Northern Ireland
  7. 07Frequently Asked Questions
  8. 08Official Sources
Short answer

Permission in Principle (PiP) is an England-only, two-stage route for small housing-led sites that costs £531 per 0.1 hectare (from 1 April 2026), has a 5-week council decision target, and lasts 3 years on application (or 5 years via a Brownfield Land Register). Stage 1 decides only location, land use, and the amount of development, and is not planning permission. You cannot start building until you win Stage 2, Technical Details Consent (TDC), which assesses design, access, drainage, ecology, and neighbour impact.

To compare PiP with standard planning routes, see our outline vs full planning permission guide and UK planning permission cost guide.

What Permission in Principle is (and is not)

The legal basis sits in sections 58A and 59A of the Town and Country Planning Act 1990 (inserted by the Housing and Planning Act 2016) and the Town and Country Planning (Permission in Principle) Order 2017 (SI 2017/402), as amended by SI 2017/1309, which opened the application route on 1 June 2018.

PiP separates principle from technical design so small builders and landowners can test a plot before commissioning detailed drawings or specialist surveys. Under Planning Practice Guidance 58-012, Stage 1 considers only three matters:

  1. Location — whether the site fits Local Plan and national policy for housing (settlement limits, Green Belt, flood zones, sustainability).
  2. Land use — whether residential use (or housing-led mixed use where housing takes the majority of floorspace, PPG 58-049) is acceptable.
  3. Amount of development — the minimum and maximum net number of dwellings (PiP Order art 5A(2)–(3)).

Permission in Principle is not planning permission and must never be confused with full planning permission. Councils cannot attach conditions to a grant of PiP (PPG 58-020), cannot require a Section 106 agreement at Stage 1 (PPG 58-022), and cannot demand local-list drawings or surveys beyond the national form, site location plan, and fee (art 5D). Only Stage 2: Technical Details Consent (TDC) has the legal effect of granting planning permission (TCPA 1990 s.70(2ZZB); PPG 58-003).

Two routes to PiP — and strict exclusions

Under TCPA 1990 s.59A, PiP arises in two ways:

  • By application to the council (3-year duration): Open since 1 June 2018 for minor housing-led schemes on either brownfield or greenfield land (PPG 58-004). Lasts 3 years unless the council directs otherwise (s.59A(8)).
  • Via Part 2 of a Brownfield Land Register (5-year duration): Councils can allocate previously developed Part 1 register sites into Part 2, which grants PiP directly for 5 years (s.59A(7)) and can include major schemes. Standard Local Plan allocations do not automatically carry PiP (PPG 58-008).

Under article 5B of the Permission in Principle Order 2017 (SI 2017/402 art 5B), a council cannot grant PiP on application for four excluded categories:

  • Major development: 10 or more houses, 1,000 m² or more of floorspace, or a site of 1 hectare or more.
  • Householder development: extensions or alterations to an existing home or incidental curtilage works. A new, separate dwelling in a garden is not householder development and can qualify — see building a house in your garden.
  • Habitats development: proposals likely to have a significant effect on a protected European or habitats site requiring appropriate assessment (a major hurdle in nutrient-neutrality zones, since mitigation conditions cannot be attached at Stage 1).
  • EIA development: all Schedule 1 EIA development, plus Schedule 2 development unless screened out of EIA (art 5B(2)).

Stage 1 (PiP) vs Stage 2 (TDC) vs Outline vs Full Planning Permission

Feature Stage 1: Permission in Principle Stage 2: Technical Details Consent Outline + Reserved Matters Full Planning Permission
What it decides Location, land use, min/max dwellings only All technical detail (design, access, layout, scale, drainage, ecology) Principle + non-reserved matters; reserved matters later Everything in one application
Is it planning permission? No — cannot start work Yes — grants planning permission Yes (conditional; reserved matters needed to start) Yes — start once pre-commencement conditions are met
Eligibility Minor housing-led sites only (England) Sites with a live, unexpired PiP Erection of buildings (any scale; not change of use) Any development, any scale
2026 England fee £531 per 0.1 ha (or part) Full fee: £610 per dwelling (<10 homes) Outline: £610 per 0.1 ha (<0.5 ha); Reserved Matters: full fee on top £610 per dwelling (<10 homes); £659 (10–50)
Decision target 5 weeks 5 weeks (minor); 10 weeks (major); 16 (EIA) 8 weeks (minor); 13 weeks (major) 8 weeks (minor); 13 weeks (major)
Consultation Min. 14 days (site notice + website) Standard 21 days Standard 21 days Standard 21 days
Time limit 3 years (application) / 5 years (brownfield Part 2) to apply for TDC Standard 3 years to start once TDC is granted 3 years to apply for reserved matters; 2 years from final approval to start 3 years from grant to start (England)
Conditions, S106, CIL & BNG None at Stage 1 All apply at TDC (unless exempt) Conditions, S106, BNG at outline; CIL at reserved matters All apply at decision / start

Fees reflect the MHCLG planning fee schedule from 1 April 2026 and rise every 1 April by CPI under regulation 18A of the Fees Regulations 2012.

Costs, timelines, and how both stages work

Stage 1: Submitting and deciding PiP

You file the national PiP form, a red-line site location plan, and the fee: £531 for a plot up to 0.1 ha, £1,593 for 0.25 ha (3 × £531), or £2,655 for 0.5 ha (5 × £531). Once validated, the council posts a site notice and website notice for at least 14 days (art 5G) and cannot decide before that window closes (art 5S(6)).

The statutory decision target is 5 weeks unless you agree a written extension (art 5S(2)), and under the 2026 delegation regulations (SI 2026/854 reg 4, Schedule 1), officers determine PiP applications rather than planning committee. If refused, you have 6 months to appeal (art 5V); resubmissions pay the full fee again since the "free go" ended on 6 December 2023 (SI 2023/1197 reg 5).

Stage 2: Technical Details Consent (TDC)

Once PiP is granted, TCPA 1990 s.70(2ZZA) requires the council to determine Stage 2 TDC in accordance with the PiP — it cannot reopen the principle of housing during the 3-year (or 5-year) duration. You submit full architectural drawings, site surveys, and the full planning fee (£610 per dwelling for 1–9 homes: £2,440 for 4 homes, £5,490 for 9 homes). Minor TDC carries a 5-week target (DMPO art 34(2)(aa)).

Conditions, Section 106 obligations, CIL liability, and 10% Biodiversity Net Gain (BNG) all apply at TDC — though for applications made on or after 6 August 2026, sites of 0.2 hectares or less without onsite priority habitat are exempt from BNG (Exemptions Regulations 2024 reg 7A, inserted by SI 2026/790). Under PPG 58-026, you cannot apply for TDC after PiP expires; if TDC is refused while PiP is still live, the PiP survives and you can reapply.

Because PiP runs with the land (TCPA 1990 s.75), owners often secure PiP and sell the plot so a buyer can design their own TDC scheme. Buyers should still check the remaining expiry window and technical constraints (highways, drainage, trees, heritage) that Stage 1 did not test.

PiP decisions observed in PlanWatch

To see how PiP appears on real English council registers, PlanWatch audited its local planning register snapshot on 14 November 2026 (covering 271,286 rows with received dates up to 6 October 2026, a 24-month window from 14 November 2024 to 14 November 2026, and 39,927 latest-per-application decision-harvest checks recorded on 13 August 2026).

Snapshot observation (England, measured 14 Nov 2026) Count Notes
All PiP mentions 1,211 Initial PiP filings plus Technical Details Consent and condition follow-ups
Likely initial PiP applications 1,029 Candidate heuristic matching /PIP references, explicit PiP types, or leading "Permission in Principle" descriptions while excluding follow-ups
Known decided outcomes 173 Initial PiP candidates with a recognised outcome (146 with a harvested decision date)
Known approved (PiP granted) 81 Stage 1 PiP granted only — not full planning permission and not an official grant rate
Outcome not recorded in snapshot 856 Still pending on 13 Aug 2026, generic "Decided" portal label, or unsupported/rate-limited portal

Across 17 portal software families in the snapshot, councils label PiP inconsistently. On Idox portals (858 of the 1,029 initial candidates), PiP applications often appear under generic stored types such as Full, Outline, Minor Development, or Unknown, while references vary from /PIP, /PLP, /PIPN, and /PIPS to generic codes (PA26/..., PL/2026/...) that require reading the description. Observed filings clustered in spring–summer 2026 (including 151 in March, 150 in May, 191 in June, and 196 in July), reflecting expanding scrape coverage rather than a sudden national surge.

Important Coverage & Data Notice
These figures are observed snapshot records only (measured 14 November 2026; latest received date 6 October 2026; decision checks from 13 August 2026). They are not complete council totals, not a national census, and not a PiP approval rate. Because 856 of 1,029 initial candidates lack a confirmed outcome in this snapshot and portal coverage varies by vendor, PlanWatch does not publish council-by-council PiP totals or a PiP grant-rate league table. Always verify received dates, stage, and decision notices directly on the council's planning register.

Wales, Scotland, and Northern Ireland

  • Wales: English PiP does not exist (TCPA 1990 s.59A(1); s.70(2A)). Use outline or full planning permission.
  • Scotland: Planning Permission in Principle (PPiP) under section 59 of the Town and Country Planning (Scotland) Act 1997 is a separate regime closer to English outline permission, available for major sites and followed by Approval of Matters Specified in Conditions (AMSC). Scottish /PPP cases are excluded from PlanWatch's English figures.
  • Northern Ireland: No PiP route; uses outline and full planning permission under the Planning Act (Northern Ireland) 2011.

Official Sources

Frequently Asked Questions

Is Permission in Principle the same as full planning permission?

No. Permission in Principle (PiP) is not planning permission and does not let you start building. It decides only location, land use, and the amount of housing development. You must obtain Technical Details Consent (TDC) in a second application before work starts.

How much does Permission in Principle cost in England in 2026?

From 1 April 2026, the statutory fee for a Permission in Principle application in England is £531 per 0.1 hectare (or part of 0.1 hectare) of site area. Stage 2 Technical Details Consent is charged separately at the full planning fee: £610 per dwelling for fewer than 10 homes.

How long does Permission in Principle last?

Permission in Principle granted on application lasts 3 years unless the council directs another period. Permission in Principle arising from Part 2 of a Brownfield Land Register lasts 5 years. You cannot submit a Technical Details Consent application after PiP expires.

How long does a council take to decide Permission in Principle?

The statutory target for Stage 1 Permission in Principle is 5 weeks from validation, including a minimum 14-day public consultation via site notice and council website. Minor Stage 2 Technical Details Consent also carries a 5-week target (10 weeks for major brownfield-register schemes).

Can I use Permission in Principle for an extension or 10+ homes?

No. Under article 5B of the Permission in Principle Order 2017, councils cannot grant PiP on application for householder development, major development (10 or more houses, 1,000 square metres or more of floorspace, or a site of 1 hectare or more), habitats development, or Schedule 1 EIA development.

Does Permission in Principle apply in Wales, Scotland, or Northern Ireland?

No. English Permission in Principle under section 59A of the Town and Country Planning Act 1990 applies to land in England only. Wales and Northern Ireland use outline and full planning permission. Scotland has "Planning Permission in Principle" (PPiP), which is a different regime closer to English outline permission.

Disclaimer: PlanWatch provides general information about UK planning processes. This content is not legal advice. Planning law is complex and varies by local authority. Consult a qualified planning consultant or solicitor for advice specific to your situation.

Applications and decisions · 15 min Outline vs Full Planning Permission vs Permission in Principle: Which Do You Need? Outline vs full vs permission in principle in England: what each decides, 2026 fees, time limits, reserved matters, CIL and biodiversity net gain. Applications and decisions · 8 min Reserved Matters Planning: What It Means After Outline Permission Reserved matters planning under TCPA 1990 s.92: access, appearance, landscaping, layout and scale, 3-year/2-year deadlines, and neighbour objections. Applications and decisions · 11 min How Much Does Planning Permission Cost? New £575 Fee From 8 December 2026 Planning fees rise on 8 December 2026: the householder fee goes from £548 to £575, outbuildings £272 to £285, new homes £752 each. Apply before then to pay less. Every new fee, with real totals. Applications and decisions · 14 min Planning Application Expiry Date: How Long Does Planning Permission Last, What Counts as Starting Work, and Does It Transfer to a New Owner? Planning permission in England lasts 3 years unless the decision notice says otherwise. What counts as starting work, outline expiry, renewal, and new owners. Applications and decisions · 18 min Can I Build a House in My Garden? Planning Rules, Costs and How Neighbours Object Building a house in your garden in England: what the August 2026 NPPF says, what officers test, fees, CIL, BNG, and grounds that work for objectors. Applications and decisions · 11 min Section 106 Agreements Explained: Developer Contributions & Planning Obligations What is a Section 106 agreement? Complete guide to planning obligations, developer contributions for affordable housing, infrastructure, and how S106 affects planning applications in England.

Planning near you

See every planning application a council has received, by area.

Planning near you

Check Your Area

Search planning applications by postcode to see recent residential proposals and decisions on your council's register.

  • Free search
  • Save a postcode free
  • Paid alerts within hours
Free — no card needed

Save a postcode to your free PlanWatch account

Free accounts save one postcode so it is ready whenever you want to check what has been applied for nearby. Paid plans add email alerts for new applications near a saved postcode, sent within hours of them reaching the council register.

Free: search plus one saved postcode. We never sell your details, and you can remove your postcode at any time.

Find your council →