Selling a House With No Planning Permission or Building Regs Sign-Off: What Your Buyer's Solicitor Will Ask and How to Fix It

Can you sell a house with an extension or loft that has no planning permission or building regs sign-off? Yes. The TA6 questions, 4 vs 10 years and four fixes.

Ben Thompson Planning Research Lead, PlanWatch Updated · First published General information, not legal advice
Check your postcode Free search · Paid instant alerts
NOTICE
Enforcement · drawn for this guide
On this page 11 sections
  1. 01What the buyer's solicitor is asking for, and why
  2. 02Step 1: gather the evidence
  3. 03Step 2: did it need permission at all?
  4. 04Step 3: is it immune from enforcement?
  5. 05Choose a route
  6. 06Timing against your chain
  7. 07What not to do
  8. 08Common myths
  9. 09Wales, Scotland and Northern Ireland
  10. 10Frequently Asked Questions
  11. 11Sources
Short answer

Yes, you can sell a house with an extension, loft or garage conversion that has no planning permission or building regulations sign-off: no law makes you fix it first. But you must answer the buyer's solicitor honestly on the TA6, and a buyer with a mortgage will need the problem resolved, insured or priced. Your four fixes are an existing lawful development certificate (£548 for a householder extension, if the work is lawful or immune), a retrospective planning application, a building regulations regularisation certificate, or indemnity insurance.

This guide covers England, as at 20 October 2026, and is written for the seller. If you are the buyer, read buying a house with no planning permission. Wales, Scotland and Northern Ireland differ and are covered in a box at the end.

What the buyer's solicitor is asking for, and why

Three documents drive the questions.

1. The TA6. The seller completes the Law Society's TA6 Property Information Form. The 6th edition replaced the 4th and 5th and has been mandatory for Conveyancing Quality Scheme firms for instructions on or after 30 March 2026 (Law Society TA6 page). Its explanatory notes cover planning permission, building regulations and competent person certificates at questions 5.1 and 5.2. They tell sellers to give their solicitor planning permissions and building control consents, and, if documents are lost or missing, to say so. The notes also say that "sellers should consult their solicitor if unsure whether work to the property required planning permission".

2. The lender's rules. If the buyer has a mortgage, the buyer's conveyancer follows the UK Finance Mortgage Lenders' Handbook (voluntary for lenders; each lender can add its own requirements). Part 1 paragraph 5.5 covers planning and building regulations (the live site blocks automated access, so here is an archived copy of Part 1 captured 6 March 2026). Para 5.5.1 says that where there is evidence of a breach but "in your professional judgment there is no reasonable prospect of enforcement action", and the conveyancer can provide an unqualified certificate of title, "we will not insist on indemnity insurance and you may proceed". Para 5.5.2 requires a report to the lender only where outstanding conditions will not be satisfied by completion and the conveyancer cannot give an unqualified certificate of title. That is the flexibility that makes some sales work on a short paper trail, and also why a conveyancer will need your evidence of age and compliance.

3. The local search. A CON29 search asks about formal action only. Q3.9 lists notices such as enforcement notices, breach of condition notices and planning contravention notices; Q3.8 asks only whether the council has "authorised ... any proceedings for the contravention of any provision contained in building regulations". An unauthorised extension that the council has never acted on does not show up, which is why the TA6 and the paperwork matter more than the search.

Step 1: gather the evidence

Before choosing a route, collect what exists:

Step 2: did it need permission at all?

Many "unauthorised" extensions turn out to have been lawful. Section 191(2) says operations are lawful if "no enforcement action may then be taken in respect of them (whether because they did not involve development or require planning permission or because the time for enforcement action has expired or for any other reason)" (TCPA s191(2)). So there are two ways in: the work needed no permission, or it is immune.

Permitted development. The work may have been permitted development when it was built, in which case no application was needed. Today's householder limits in Class A of the GPDO are, for example, a single-storey rear extension up to 3 m deep (4 m for a detached house) and up to 4 m high, and a two-storey extension up to 3 m deep and at least 7 m from the rear boundary (A.1(f) and (h)). Work done under an older version of the rules is judged by whether it needed permission when built, so ask a planning professional to check the rules that applied then. Our guide to planning permission for an extension has the current detail.

"Original house" starts in 1948. The GPDO allowances are measured from the "original" house, which article 2(1) of the GPDO defines, for a building existing on 1 July 1948, as the building "as existing on that date" and, for a building built on or after that date, as "as so built". The government's technical guidance puts it the same way. Work that was already there on 1 July 1948 is part of the original house, not an extension to it.

Slightly over a limit? Ask a planning professional whether reducing the extension would leave something the council would accept as lawful. Do not assume it works: permitted development does not apply "in connection with an existing building" where the building operations involved in constructing it are unlawful (GPDO art 3(5)(a)). A proposed lawful development certificate (s192) is the formal way to test a specific proposal. The fee is half the full application fee (MHCLG schedule: £274 for a householder extension, which is half of £548).

Step 3: is it immune from enforcement?

The rule. For a breach consisting of building works, no enforcement action may be taken after 10 years from the date the operations were substantially completed (England); for a change of use of a building to a single dwellinghouse, 10 years from the breach (TCPA s171B(1)(a) and (2)(a)). That is the position since 25 April 2024.

The transitional rule. You may read that "councils only have 4 years". That is now only partly true. SI 2024/452 reg 5 says the 10-year amendments "do not apply where ... the operations were substantially completed", or, for a change of use to a single dwelling, "the breach occurred, before the day on which that section comes into force", meaning 25 April 2024. So the old 4-year limit still applies to work substantially completed before 25 April 2024. It is not "breaches before 25 April 2024" in general: building work started before that date but completed after it is on the 10-year clock. The government's own enforcement guidance sets it out in PPG 17b-004.

What that means for a seller, as at 20 October 2026 (our derivation from the statute, not a quotation):

Operations substantially completed Limit Position
More than 4 years ago, and before 25 April 2024 4 years The period has run: the work is immune from planning enforcement
Within the last 4 years, but before 25 April 2024 4 years Not yet immune; it becomes immune when 4 years have run from completion
On or after 25 April 2024 10 years Not immune before 2034 at the earliest

Exceptions that stop the clock. Immunity does not help where:

  • There was deliberate concealment. The council can apply to a magistrates' court for a planning enforcement order (s171BA), which the court may make only if satisfied, on the balance of probabilities, that the breach was deliberately concealed to any extent and that making the order is just (s171BC). The courts have held that the s171B time limits do not start until a deliberately concealed breach is discovered (PPG 17b-004, citing Welwyn Hatfield and Jackson). A lawful development certificate cannot be granted while the time for a planning enforcement order has not expired (s191(3A)).
  • Enforcement action was already taken. Further action is allowed within 4 years of earlier action on the same breach (s171B(4)(b)), and the issue of an enforcement warning notice in England counts as enforcement action (s171A(2)(za)).
  • The building is listed. Unauthorised works to a listed building are a criminal offence (Listed Buildings Act s9), and the listed building enforcement power in s38 carries no time limit of its own. Demolition in a conservation area counted as "relevant demolition" has no limit either (s171B(2A)).

Immunity is a planning concept. It does not touch building regulations. Section 36 of the Building Act now lets a council act for 10 years from completion of the work, and the transitional rule saves only notices given before 1 October 2023, not older work (Building Act s36(4); SI 2023/993 reg 7). Our guide to planning enforcement time limits sets out the planning clock in full.

Proving the date. The burden is on you. The government's guidance says the applicant "is responsible for providing sufficient information to support an application", and that where the council has no contrary evidence there is "no good reason to refuse" if the applicant's own evidence is "sufficiently precise and unambiguous to justify the grant of a certificate on the balance of probability" (PPG 17c-006). An application must include "such evidence verifying the information included in the application as the applicant can provide" (DMPO art 39(2)(b)).

Statutory declarations. Statements from the builder, neighbours or the owner are often given as statutory declarations. The Statutory Declarations Act 1835 s18 lets a justice of the peace, notary public or other officer authorised to administer oaths take a declaration made voluntarily in the form in the Act's Schedule, and a knowingly false material statement in one is a criminal offence carrying up to two years' imprisonment or a fine (Perjury Act 1911 s5). It is also an offence, if done knowingly or recklessly (or, for documents and withholding information, with intent to deceive), to make a false or misleading statement, use a false or misleading document or withhold material information to obtain a lawful development certificate, punishable by up to two years' imprisonment or a fine on indictment (TCPA s194; see also PPG 17c-013).

Choose a route

Route What it does Cost and time The catch
Indemnity insurance Insures the buyer, lender and successors against loss if the council enforces Premium set by insurer (see planning indemnity insurance); quick Does not fix the work; conditions, notably no contact with the council
Existing lawful development certificate Confirms the work is lawful or immune. Conclusive once granted (s191(6)) £548 householder extension; £272 for outbuildings, gates and similar; decision due within 8 weeks You carry the evidence burden; planning only
Retrospective planning application Seeks permission for what is built (s73A) Same fee as a normal application (£548 householder extension); 8-week decision period (DMPO art 34) Proceeds on the footing that permission is needed; intentional breach counts against you; can be refused
Building regulations regularisation Gives the council's certificate that the work met the regulations applicable when built (reg 18) Set by each council's charging scheme Opening-up may be required; tells the council the work exists

Indemnity insurance

A lack-of-planning or building regulations indemnity policy is the fastest route. One published sample wording (CLS/ERGO, version dated 1 March 2016) pays for legal costs relating to an enforcement notice, the cost of altering or demolishing if required, and the fall in value caused by enforcement action, and runs "in perpetuity". Its statements of fact required that neither the seller nor the buyer "have communicated with the local planning authority" about building regulations irregularities, a general condition barred communicating about the insured risk with a third party without the insurer's consent, and it excluded loss from a retrospective building regulations application made without the insurer's consent. It dates from 2016, so use it only as an illustration of the types of condition, and read the wording of any actual policy. Full detail: planning indemnity insurance.

Existing lawful development certificate

This is the route for work that is lawful or immune. Section 191(4) says that if the council is "provided with information satisfying them of the lawfulness" of the operations, it "shall issue a certificate"; otherwise it must refuse. Planning merits are irrelevant, and a refusal is "not necessarily conclusive that something is not lawful": it may mean insufficient evidence so far (PPG 17c-009). You can appeal a refusal (PPG 17c-012). The certificate is a planning document: it "does not remove the need to comply with ... the Building Regulations 2010" (PPG 17c-004). Our guide to lawful development certificate costs covers fees across categories.

Retrospective application

Section 73A lets the council grant planning permission for "development carried out before the date of the application", including development carried out without planning permission, and the permission can take effect from the date the development was carried out (s73A(1) to (3)). It is an ordinary fee-paying application (PPG fees). Three cautions apply:

  • Intention counts against you. NPPF policy DM8(2): where unauthorised development was "intentional", based on evidence, "that fact should be given substantial weight in considering whether to grant planning permission" (NPPF 2026, DM8).
  • One go at the merits. An enforcement notice issued after a related application cannot be appealed on ground (a) ("permission ought to be granted"), unless the notice came more than two years after the application ceased to be under consideration (TCPA s174(2A) to (2AB)).
  • It is not always best. You may read that "retrospective permission is almost always the better option before selling". That is wrong where the work was permitted development or is already immune: an existing lawful development certificate fits those cases, rests on facts rather than planning judgement, and cannot be refused on merits. See retrospective planning permission for the full application process.

Regularisation

For missing building regulations sign-off on work from 11 November 1985 onward, the formal route is a regularisation certificate. It is not a rubber stamp: the council can require you to open up the work. See no building regulations completion certificate.

Timing against your chain

  • Lawful development certificate: the council must give notice of its decision within 8 weeks beginning with the day after receipt of a valid application, unless you agree a longer period in writing (DMPO art 39(10)). It must first acknowledge and validate the application (art 39(7) to (9)).
  • Retrospective application: 8 weeks for a householder application, or longer if agreed in writing (DMPO art 34).
  • Regularisation: regulation 18 sets no decision deadline of its own.
  • Indemnity: there is no statutory process, which is why it is common on short chains.

Start gathering evidence before you list, because the evidence takes longer than the form.

What not to do

  • Don't misstate the TA6. A seller who gives a wrong answer risks a claim for damages under section 2(1) of the Misrepresentation Act 1967, which applies unless the seller proves they "had reasonable ground to believe and did believe" the facts were true. If you do not know, say so: the Law Society says more "not known" options were added in the 6th edition (press release).
  • Don't ask your agent to leave it out. Under the Digital Markets, Competition and Consumers Act 2024, a trader's commercial practice is a misleading omission if it omits "information that the average consumer needs to take an informed transactional decision" (s227, in force since 6 April 2025).
  • Don't contact the council before agreeing a route. If an indemnity policy is an option, the sample conditions above show why: contact can put the cover at risk. Agree the route with the buyer's solicitor first.
  • Don't backdate or tidy evidence. Knowingly or recklessly making a false or misleading statement to obtain a certificate is an offence (TCPA s194).

Common myths

  • "Councils only have 4 years." Only for work substantially completed before 25 April 2024 (SI 2024/452 reg 5).
  • "No record means no permission." Not necessarily: check the archive, and consider permitted development and immunity (Step 2 and Step 3).
  • "Retrospective is always best." Not where an existing lawful development certificate fits.
  • "You must get an LDC before you can sell." It is optional: a person who wishes to ascertain lawfulness "may make an application" (s191(1)).

Wales, Scotland and Northern Ireland

Wales. The enforcement limit is 4 years for operations and for a change of use to a single dwelling, and 10 years for other breaches (TCPA s171B, which has separate Welsh limbs). The Building Act s36 limit became 10 years in Wales on 1 July 2026 (WSI 2025/1368). Lawful development certificates exist in Wales under the same s191. The £548 figure in this guide is England's fee schedule, so check the Welsh one.

Scotland. The planning enforcement limit is 4 years for operations and for a change of use to a single dwellinghouse, and 10 years for other breaches (TCP(S)A 1997 s124). The equivalent certificate is a certificate of lawfulness of existing use or development (s150). For building control, a warrant is needed before work starts, but a late application may be made any time before a completion certificate has been accepted (Building (Scotland) Act 2003 s8 and s15), and for work done without a warrant a completion certificate must certify compliance with the regulations as they stand when it is submitted (s17(4) to (6)).

Northern Ireland. The limit is 5 years for every breach (Planning Act (Northern Ireland) 2011 s132). The equivalent certificate is under s169. Building control is under the Building Regulations (Northern Ireland) 2012, including a regularisation certificate (reg 13).

Sources

Every legal statement above is taken from the provision linked at that point. The main primary sources:

This guide is general information, not legal advice. For a specific sale, ask your conveyancer, who will know what your buyer's lender requires.

Frequently Asked Questions

Can I sell a house with an extension that has no planning permission?

Yes. No law makes you fix it first. Answer the TA6 accurately; a buyer with a mortgage will need the issue resolved, insured or priced under para 5.5 of the Lenders' Handbook.

Do I need a lawful development certificate to sell my house?

No: s191(1) says you "may make an application". It is one way to give the buyer certainty. For a householder extension it costs £548 (from 1 April 2026) and should be decided within 8 weeks of a valid application.

The council has no record of planning permission for my extension. Does that mean it's unlawful?

Not necessarily. It may have been permitted development, the record may be in an archive, or it may be immune from enforcement. A certificate can confirm the answer.

Does the 4-year rule still apply when I sell?

Only to work substantially completed (or a single-dwelling change of use that occurred) before 25 April 2024 (SI 2024/452 reg 5). Otherwise 10 years in England. Wales and Scotland use 4; Northern Ireland uses 5.

My buyer's solicitor wants planning permission and building regs papers for a 20-year-old extension. What are my options?

Gather evidence, work out whether it was permitted development or is immune, and choose between a lawful development certificate, regularisation, a retrospective application or indemnity cover. Agree the route with the buyer's solicitor before contacting the council.

Can I sell a house with an unauthorised loft conversion?

Yes. Expect questions on both planning (Class B limits) and building regulations sign-off.

What happens if I give wrong answers on the TA6?

You risk a damages claim for misrepresentation (Misrepresentation Act 1967 s2(1)). Answer accurately, and use "not known" where that is the truth.

Property Planning Report

Buying this property? Get a Property Planning Report

One report, everything in this guide done for you: every planning application near the address, the property's own planning history, and the council's approval rate — with plain-English notes on what it means before you exchange.

Order a Property Planning Report

Disclaimer: PlanWatch provides general information about UK planning processes. This content is not legal advice. Planning law is complex and varies by local authority. Consult a qualified planning consultant or solicitor for advice specific to your situation.

Buying a home · 25 min Buying a House With No Planning Permission for the Extension: What to Check and What to Do Buying a house with an extension, loft or annexe that has no planning permission? Three questions decide your risk. England, October 2026, with sources. Buying a home · 16 min No Building Regulations Completion Certificate? What It Means, Regularisation and the New 10-Year Limit Missing a building regulations completion certificate? Councils can now act for 10 years, not 12 months. Regularisation, FENSA, indemnity and selling, explained. Applications and decisions · 14 min The 4-Year Rule Has Changed: Planning Enforcement Time Limits in England (the 10-Year Rule Explained) Is the 4-year planning rule still in place? In England it is 10 years for work finished or homes created from 25 April 2024. Dates, examples and the exceptions. Buying a home · 18 min Planning and Building Regulations Indemnity Insurance: What It Covers, What Voids It, and Who Pays What planning and building regulations indemnity insurance covers, what voids it, who pays and what lenders require, read from a real policy wording. England, October 2026. Your project · 14 min Lawful Development Certificate Cost and When It Is Worth It How lawful development certificate costs work, what an LDC proves, when homeowners should apply, and why it can protect a sale or remortgage. Applications and decisions · 11 min Retrospective Planning Permission: Applying After Building Without Consent Complete guide to retrospective planning permission in the UK. What happens if you build without planning permission, how to apply retrospectively, enforcement risks, and the enforcement time limits. Buying a home · 10 min Planning History: How to Check a Property's Records Check the planning history of a UK property by address or postcode. Find decisions, drawings, conditions and missing records, then verify them with the council. Applications and decisions · 4 min How To Find Approved Planning Drawings How to find approved planning drawings on a council portal, avoid old superseded plans, and check what was actually approved.

Planning near you

See every planning application a council has received, by area.

Planning near you

Check if this affects your area

Search your postcode to see planning applications near you — free, instant results. Know what’s happening before it’s too late.

  • Free search
  • Save a postcode free
  • Paid instant alerts
Free — no card needed

Save a postcode to your free PlanWatch account

Free accounts save one postcode so it is ready whenever you want to check what has been applied for nearby. Paid plans add instant email alerts for new applications near a saved postcode.

Free: search plus one saved postcode. We never sell your details, and you can remove your postcode at any time.

Find your council →