- 01Appeal or resubmit: the decision table
- 02Step 1: Read the reasons for refusal
- 03Option A: Amend and resubmit
- 04Option B: Appeal
- 05Option C: Both at once, and the risks
- 06Costs awards
- 07When the council will not look again: sections 70A and 70B
- 08After a dismissed appeal
- 09If you are the neighbour or a buyer
- 10Wales, Scotland and Northern Ireland
- 11Frequently Asked Questions
- 12Further Reading
Appeal if you think the council got its own policies wrong. Amend and resubmit if a changed design would answer the reasons for refusal, because on applications made since 1 April 2026 an appeal is decided on the plans and evidence the council already saw. An appeal costs nothing and must be received within 12 weeks (householder) or 6 months (other applications) of the decision notice. A resubmission costs the full fee again (£548 for a householder extension), because the "free go" ended on 6 December 2023. Rules as at October 2026, for England.
Appeal or resubmit: the decision table
| Amend and resubmit | Appeal | Both at once | |
|---|---|---|---|
| Cost | Full application fee again (£575 householder extension from 8 Dec 2026) | No appeal fee | Fee plus risk of wasted effort |
| Can you change the scheme? | Yes | Not under the expedited route; the Inspector looks at the application the council decided | Resubmission only |
| Decision period | 8 weeks (non-major) or 13 weeks (major), unless you agree longer | Median 11.6 weeks for householder appeals, 17.1 weeks for full appeals (June 2026) | Whichever decides first |
| Deadline | None as such | 12 weeks, or 6 months; 28 days with enforcement | Appeal clock keeps running |
| Best when | The refusal reason is fixable by design | You think the reasons are wrong in policy or fact | Rarely; the council can decline the second application |
Step 1: Read the reasons for refusal
The decision notice must "state clearly and precisely their full reasons for the refusal, specifying all policies and proposals in the development plan which are relevant to the decision" (DMPO art 35(1)(b)). Pull the officer's report too: it shows what the case officer thought and whether a committee went against that advice. Our decision notice guide explains the notice, and can planning permission be refused covers the usual reasons.
Option A: Amend and resubmit
The Planning Inspectorate's own guidance says: "If an applicant thinks that amending their application will overcome the LPA's reasons for refusal, they should make a new planning application" (procedural guide, para 3.1.1). The national planning guidance says an applicant should first consider "re-engaging with the local planning authority to discuss whether any changes to the proposal would make it more acceptable" (PPG Appeals 16-011).
The fee. You may read that your first resubmission within 12 months is free. It no longer is. Regulation 9 of the Fees Regulations 2012, which gave a free second application, was omitted from 6 December 2023. A transitional saving in regulation 19 applies only to second applications whose 12-month period had already begun but not ended on that date, so it cannot help anyone refused in 2026. Fees now rise every 1 April by CPI, capped at 10% (Fees Regulations 2012 reg 18A). From 1 April 2026 the householder fee is £548 for an extension or alteration to one house and £272 for ancillary operations within the curtilage such as outbuildings (MHCLG schedule). Do not rely on older PlanWatch or council pages for fees.
Timing. While the period for appealing the refusal is still running, the council may decline to determine a new application it thinks is the same or substantially the same as the refused one, even if you have not appealed (s70B(4)-(5)). A genuinely revised design is much less likely to be caught.
Talk to the officer first. Councils may charge for pre-application advice (PPG 20-004). It cannot "pre-empt the democratic decision making process", though it may be a material consideration (PPG 20-011). Ask the case officer what, specifically, would change their view.
Speed. A non-major application must be decided within 8 weeks and a major one within 13, or any longer period agreed in writing (DMPO art 34, summarised in the procedural guide, para 4.3). Nationally, councils decided 93% of householder applications within 8 weeks or the agreed time in the year to June 2026 (MHCLG, April to June 2026).
Option B: Appeal
For the procedure step by step, see how to appeal a planning decision.
Deadlines. The Planning Inspectorate must receive an appeal against the refusal of a householder or minor commercial application within 12 weeks of the date on the decision notice, and most other appeals within 6 months, including appeals against conditions on a householder permission and non-determination appeals (DMPO art 37(2) and (8)). If an enforcement notice on the same or substantially the same development was served in the two years before the application, or is served during the appeal period, the limit can be 28 days (art 37(2)(b)-(c); GOV.UK householder appeals). You may read that appeals can be lodged "within 6 months" for any refusal. That applies to non-householder refusals. Late appeals are not accepted (procedural guide). There is no fee for appealing.
The 2026 change. The Town and Country Planning (Appeals) (Written Representations Procedure) (England) (Amendment and Saving Provision) Regulations 2026 (SI 2026/122) took effect on 1 April 2026. Their explanatory note says the expedited procedure "will now be used to determine the majority of appeals made under section 78(1)". In practice:
- Which appeals? Appeals under section 78(1) against refusals (and conditions) on applications made on or after 1 April 2026, including prior approval refusals and refused retrospective applications (procedural guide, para 9.1.3). Householder appeals on applications from 2009 to March 2026 were already on the expedited route (SI 2026/122 reg 2(2)). Non-determination appeals and listed building appeals follow the longer route (para 9.1.5). If your application was made before 1 April 2026, the older guidance applies.
- No new evidence. The appellant "is not able to submit evidence at appeal not previously considered by the LPA" (para 7.3.1). Limited exceptions apply for a material change in circumstances, such as a change in policy, a relevant court judgment or a relevant appeal decision (para 7.3.4).
- No improved drawings. If an amendment would overcome the reasons for refusal, the applicant "should submit a revised planning application"; if an appeal is pursued anyway, the Inspectorate "will disregard any new evidence" (para 7.3.6). GOV.UK's appeal page also says not to "add new evidence that should have gone in the application".
- The Inspector reads what the council had: the application, decision notice, committee minutes and officer report, the appeal form and the council's questionnaire (para 7.3.2).
- Neighbours cannot comment again. Their application-stage comments are forwarded to the Inspector and no new ones are taken (PPG 16-015; procedural guide, para 8.4). You may read that neighbours get another say at appeal. Not in a Part 1 appeal.
How long, and how likely? The Planning Inspectorate's July 2026 statistical release (section 9, Annex B: detailed information on timeliness, June 2026) reports, for decisions made in June 2026, a median of 11.6 weeks for householder appeals (351 decisions) and 17.1 weeks for full section 78 written representations appeals (758 decisions). You may read that appeals take 6 to 10 months. For householder cases the current figure is closer to three months. Enforcement appeals are far slower: a median of 63 weeks for enforcement decisions in June 2026.
For success, the Planning Inspectorate's annual tables (Table 2.6a) show 1,553 of 4,263 householder appeals decided in 2025/26 were allowed, or 36% (split decisions count as allowed); Table 2.4a shows 3,152 of 10,097 section 78 appeals allowed, 31%. Treat this carefully. It is the outcome among appeals that were made, not a forecast for your case, and the 2025/26 decisions were all made before the April 2026 changes.
When appeal makes sense. Where the refusal turns on the council misreading its own policy, relying on a vague or unsupported reason, or going against its own officer's recommendation with no evidence, an appeal does not require you to change anything. The Inspectorate's guidance also warns that making an appeal "should not be used as a bargaining tactic but only as the last resort" (para 3.1.2).
Option C: Both at once, and the risks
You can resubmit while an appeal is pending, but the council has a legal way to refuse to look at it. Under section 70B of the 1990 Act, a council "may decline to determine" an application made at a time when a similar application is under consideration by the Secretary of State on appeal (s70B(3)), or when a similar application has been refused and the time to appeal under section 78 has not expired (s70B(4)). "Similar" means the council thinks the development and land are "the same or substantially the same" (s70B(5)). A materially different design is less exposed to this than a tweak.
If you do resubmit and succeed, tell the Planning Inspectorate promptly. The planning guidance says appellants are "encouraged to withdraw their appeal at the earliest opportunity if there is good reason", and that withdrawing without good reason can lead to a costs award (PPG 16-054).
Costs awards
Each side is normally expected to meet its own appeal expenses (procedural guide, para 3.2.1). Costs can be awarded where a party "has behaved unreasonably" and that behaviour "has directly caused another party to incur unnecessary or wasted expense" (PPG 16-030). Inspectors can also award costs on their own initiative (16-029). Examples of council behaviour that risks costs include failing to produce evidence for each reason for refusal, vague or generalised assertions about impact, and refusing on a ground that conditions could have dealt with (16-049). Appellants risk costs if the appeal had no reasonable prospect of success, for example where it follows a recent dismissed appeal on substantially the same site and circumstances have not materially changed (16-053).
When the council will not look again: sections 70A and 70B
After a refusal, section 70A gives the council a power to decline a "similar" application, but only within two years of the earlier event and only if it thinks there has been "no significant change" in the development plan or other material considerations. The usual triggers are an appeal against the refusal (or non-determination) of a similar application being dismissed (s70A(3)), or the council having refused more than one similar application with no appeal made or any appeal withdrawn (s70A(4)). A refusal by the Secretary of State of a similar called-in application (s70A(2)), or of a similar deemed application on an enforcement appeal (s70A(4A)-(4B)), also counts. A single refusal that you did not appeal does not on its own trigger it. A notice that the council has declined to determine is dealt with in section 78(2)(aa) alongside the other outcomes that stop a non-determination appeal; it is not a refusal under section 78(1). If you receive one, take advice.
After a dismissed appeal
An Inspector's decision can be challenged only on legal grounds, in the High Court, within six weeks (GOV.UK; TCPA s288(4A)-(4B) requires leave and an application within six weeks of the day after the decision). It is not a second appeal on the planning merits. For the usual alternative, a revised application, see Option A, with section 70A in mind.
If you are the neighbour or a buyer
A refusal is not the end for the site. Watch for a revised application or an appeal, and compare the new drawings with the refused ones. (If the portal shows the application was pulled before a decision instead, see what a withdrawn planning application means.) If an appeal follows, the comments you already made are forwarded and you will not usually be able to add more, so full comments at application stage matter. PlanWatch alerts track nearby applications by postcode. For an applicant-side view of odds, see approval rates by council, the approval check and the approval odds report.
Wales, Scotland and Northern Ireland
This guide covers England. The free-go abolition above is in the England-only fees regulations (SI 2023/1197); check each nation's own fee rules.
- Wales: appeals go to the Welsh Ministers (Planning and Environment Decisions Wales). The deadline is 12 weeks for householder and minor commercial appeals and 6 months otherwise (Development Management Procedure (Wales) Order 2012 art 26).
- Scotland: where an officer decided the application under a scheme of delegation, the applicant may require a review by the council's local review body (TCP(S)A 1997 s43A(8)); otherwise the appeal goes to the Scottish Ministers (DPEA) under s47, with notice within three months (Appeals (Scotland) Regulations 2013 reg 3(3)).
- Northern Ireland: appeals go to the Planning Appeals Commission within 4 months of notification of the decision (Planning Act (NI) 2011 s58(3)).
Further Reading
Related Guides
Frequently Asked Questions
Is a refused planning application finished?
No. The applicant can appeal (within 12 weeks for a householder application, 6 months for most others), submit a revised application at the full fee, or do nothing. The council can decline a new application that is the same or substantially the same in some circumstances (ss70A and 70B), so a genuinely revised design is safer than a repeat.
Should I keep checking after a refusal?
Yes, if you are a neighbour or buyer. A revised application or an appeal can follow, sometimes with changes aimed at the refusal reasons. If an appeal follows, the comments you made on the application are forwarded to the Inspector and you will usually not be able to add more (PPG 16-015).
Is a resubmitted planning application free?
Not in England. The "free go" was abolished on 6 December 2023 when regulation 9 of the 2012 Fees Regulations was omitted. A revised application now pays the full fee: £575 for a householder extension or alteration to one house from 8 December 2026 (S.I. 2026/1192), or £548 if made before then (MHCLG). A narrow transitional saving covered only second applications whose 12-month window had already begun on 6 December 2023.
How long do I have to appeal a refused planning application?
In England it is 12 weeks from the date on the decision notice for a refused householder or minor commercial application, and 6 months for most other appeals, including an appeal against conditions on a householder permission or against non-determination (DMPO 2015 art 37(2) and (8)). It is only 28 days where an enforcement notice on the same or substantially the same development was served in the two years before the application, or is served during the appeal period (art 37(2)(b)-(c)). An appeal costs nothing to make.
How long does a planning appeal take in 2026?
For householder appeals decided in June 2026, the median was 11.6 weeks (351 decisions). For full section 78 written representations appeals it was 17.1 weeks (758 decisions) (Planning Inspectorate, 30 July 2026). These are medians for one month's decisions, so your own appeal could be quicker or slower.
What is the success rate for householder planning appeals?
In 2025/26 the Planning Inspectorate decided 4,263 householder appeals in England and allowed 1,553, or 36% (split decisions count as allowed). For all section 78 appeals it was 31% (annual tables 2.6a and 2.4a). These rates describe appeals that were made, not every refused application.
Can I submit new drawings or evidence at appeal?
Generally not for applications made on or after 1 April 2026. Under the Part 1 procedure the appellant cannot submit evidence the council has not already seen, except in limited cases of a material change in circumstances. If new drawings or a technical report would overcome the reasons for refusal, the Planning Inspectorate says to submit a revised planning application (para 7.3.6).
Can neighbours comment again if I appeal?
Not in a Part 1 appeal. Their application-stage comments are forwarded to the Inspector and no new ones are accepted (PPG 16-015). Councils must say so when they publicise an application (DMPO art 15(7)(f)).
Application refused, or need expert help? Speak to a planning consultant
We're building our network of planning consultants — leave your details and we'll connect you with a specialist.
Talk to a planning consultant who knows your local planning authority